ML100850401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML100850401
| number = ML100850401
| issue date = 03/25/2010
| issue date = 03/25/2010
| title = Limerick Units 1 & 2 - Attachment 5: Summary of Regulatory Commitments
| title = Attachment 5: Summary of Regulatory Commitments
| author name =  
| author name =  
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ATTACHMENT 5 Summary of Regulatory Commitments The following table identifies commitments made by Exelon Generation Company, LLC (EGC) in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.
COMMITTED              COMMITMENT TYPE COMMITMENT                          DATE OR        ONE-TIME ACTION    PROGRAMMATIC "OUTAGE"          (Yes/No)            (Yes/No)
Limitations regarding operation with an        Prior to uprate          Yes                No inoperable LEFM system will be included in      implementation the TRM.
The LEFM system for LGS, Units 1 and 2 will    Prior to uprate          Yes                No be installed.                                  implementation Plant maintenance and calibration              Prior to uprate          Yes                No procedures will be revised to incorporate      implementation Camerons maintenance and calibration requirements.
Final acceptance of the site-specific          Prior to uprate          Yes                No uncertainty analyses will occur after the      implementation completion of the commissioning process.
Modifications for the power uprate will be      Prior to uprate          Yes                No implemented.                                    implementation Necessary procedure revisions for the power Prior to uprate          Yes                No uprate will be completed.
implementation The plant simulator will be modified for the Prior to uprate          Yes                No uprated conditions and the changes will be implementation validated in accordance with plant configuration control processes.
Maintenance personnel will be qualified on      Prior to work on          No                Yes the LEFM system.                                the system Operator training will be completed prior to Prior to uprate          Yes                No implementation of the proposed power uprate implementation changes.
Plant testing for the proposed changes will be  As described              Yes                No completed as described in Attachment 6, Section 10.4, "Testing."
Plant-specific analyses for all potentially    Prior to uprate          Yes                No limiting events will be performed on a cycle-  implementation specific basis as part of the reload licensing process.}}

Latest revision as of 21:23, 13 November 2019

Attachment 5: Summary of Regulatory Commitments
ML100850401
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/25/2010
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML100850379 List:
References
Download: ML100850401 (1)


Text

ATTACHMENT 5 Summary of Regulatory Commitments The following table identifies commitments made by Exelon Generation Company, LLC (EGC) in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.

COMMITTED COMMITMENT TYPE COMMITMENT DATE OR ONE-TIME ACTION PROGRAMMATIC "OUTAGE" (Yes/No) (Yes/No)

Limitations regarding operation with an Prior to uprate Yes No inoperable LEFM system will be included in implementation the TRM.

The LEFM system for LGS, Units 1 and 2 will Prior to uprate Yes No be installed. implementation Plant maintenance and calibration Prior to uprate Yes No procedures will be revised to incorporate implementation Camerons maintenance and calibration requirements.

Final acceptance of the site-specific Prior to uprate Yes No uncertainty analyses will occur after the implementation completion of the commissioning process.

Modifications for the power uprate will be Prior to uprate Yes No implemented. implementation Necessary procedure revisions for the power Prior to uprate Yes No uprate will be completed.

implementation The plant simulator will be modified for the Prior to uprate Yes No uprated conditions and the changes will be implementation validated in accordance with plant configuration control processes.

Maintenance personnel will be qualified on Prior to work on No Yes the LEFM system. the system Operator training will be completed prior to Prior to uprate Yes No implementation of the proposed power uprate implementation changes.

Plant testing for the proposed changes will be As described Yes No completed as described in Attachment 6, Section 10.4, "Testing."

Plant-specific analyses for all potentially Prior to uprate Yes No limiting events will be performed on a cycle- implementation specific basis as part of the reload licensing process.