Press Release-IV-10-023, NRC to Hold Open House to Discuss 2009 Performance Assessment for South Texas Project Nuclear Power Plant: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:No. IV-10-023 Contact: Victor Dricks   (817) 860-8128 Lara Uselding  (817) 276-6519 May 11, 2010                                      E-Mail: opa4@nrc.gov NRC TO HOLD OPEN HOUSE TO DISCUSS 2009 PERFORMANCE ASSESSMENT   FOR SOUTH TEXAS PROJECT NUCLEAR POWER PLANT The Nuclear Regulatory Commission staff will hold an open house in Bay City, Texas, on June 3, to provide information on the agency
{{#Wiki_filter:NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Telephone: (817) 860-8128 No. IV-10-023                                                                                       May 11, 2010 Contact: Victor Dricks (817) 860-8128                                                     E-Mail: opa4@nrc.gov Lara Uselding (817) 276-6519 NRC TO HOLD OPEN HOUSE TO DISCUSS 2009 PERFORMANCE ASSESSMENT FOR SOUTH TEXAS PROJECT NUCLEAR POWER PLANT The Nuclear Regulatory Commission staff will hold an open house in Bay City, Texas, on June 3, to provide information on the agency=s 2009 assessment of safety performance for the South Texas Project nuclear plant.
=s 2009 assessment of safety performance for the South Texas Project nuclear plant.
The NRC open house will begin at 5:30 p.m. at the Bay City Civic Center, 201 Seventh St., Bay City.
 
AThe NRC continually reviews the performance of the South Texas Project and the nation=s other commercial nuclear power facilities,@ NRC Region IV Administrator Elmo E.
The NRC open house will begin at 5:30 p.m. at the Bay City Civic Center, 201 Seventh St., Bay City.  
Collins said. AThis meeting will provide local members of the public an opportunity to learn about our annual assessment of safety performance at the plant.@
 
A letter sent from the NRC Region IV office to plant officials addresses the performance of the plant during 2009 and will serve as the basis for discussion. It is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stp_2009q4.pdf.
AThe NRC continually reviews the performance of the South Texas Project and the nation=s other commercial nuclear power facilities,@ NRC Region IV Administrator Elmo E. Collins said.
Overall, the South Texas Project operated safely during 2009 and will receive the detailed inspection regime during 2010 used by the NRC for plants that are operating well.
AThis meeting will provide local members of the public an opportunity to learn about our annual assessment of safety performance at the plant.
These inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV Office in Arlington, Texas.
A letter sent from the NRC Region IV office to plant officials addresses the performance of the plant during 2009 and will serve as the basis for discussion. It is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stp_2009q4.pdf. Overall, the South Texas Project operated safely during 2009 and will receive the detailed inspection regime during 2010 used by the NRC for plants that are operating well.
These inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV Office in Arlington, Texas.  
 
Current performance information for South Texas Project Unit 1 is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/STP1/stp1_chart.html. Current performance information for Unit 2 is available at:
Current performance information for South Texas Project Unit 1 is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/STP1/stp1_chart.html. Current performance information for Unit 2 is available at:
http://www.nrc.gov/NRR/OVERSI GHT/ASSESS/STP2/stp2_chart.html.
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/STP2/stp2_chart.html.
      ###
                                                      ###
NRC news releases are available through a free list serve subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.
NRC news releases are available through a free list serve subscription at the following Web address:
NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs  Region IV                        612 E. Lamar Blvd., Suite 400                          Arlington, TX  76011-4125 Telephone: (817) 860-8128}}
http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.}}

Revision as of 19:28, 13 November 2019

Press Release-IV-10-023: NRC to Hold Open House to Discuss 2009 Performance Assessment for South Texas Project Nuclear Power Plant
ML101310268
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/11/2010
From:
Office of Public Affairs Region IV
To:
Category:Press Release
References
Press Release-IV-10-023
Download: ML101310268 (1)


Text

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Telephone: (817) 860-8128 No. IV-10-023 May 11, 2010 Contact: Victor Dricks (817) 860-8128 E-Mail: opa4@nrc.gov Lara Uselding (817) 276-6519 NRC TO HOLD OPEN HOUSE TO DISCUSS 2009 PERFORMANCE ASSESSMENT FOR SOUTH TEXAS PROJECT NUCLEAR POWER PLANT The Nuclear Regulatory Commission staff will hold an open house in Bay City, Texas, on June 3, to provide information on the agency=s 2009 assessment of safety performance for the South Texas Project nuclear plant.

The NRC open house will begin at 5:30 p.m. at the Bay City Civic Center, 201 Seventh St., Bay City.

AThe NRC continually reviews the performance of the South Texas Project and the nation=s other commercial nuclear power facilities,@ NRC Region IV Administrator Elmo E.

Collins said. AThis meeting will provide local members of the public an opportunity to learn about our annual assessment of safety performance at the plant.@

A letter sent from the NRC Region IV office to plant officials addresses the performance of the plant during 2009 and will serve as the basis for discussion. It is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stp_2009q4.pdf.

Overall, the South Texas Project operated safely during 2009 and will receive the detailed inspection regime during 2010 used by the NRC for plants that are operating well.

These inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV Office in Arlington, Texas.

Current performance information for South Texas Project Unit 1 is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/STP1/stp1_chart.html. Current performance information for Unit 2 is available at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/STP2/stp2_chart.html.

NRC news releases are available through a free list serve subscription at the following Web address:

http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.