ML102150530: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/29/2010
| issue date = 07/29/2010
| title = Attachment to Draft RAIs -Exelon EAL Upgrade Project
| title = Attachment to Draft RAIs -Exelon EAL Upgrade Project
| author name = DiFrancesco N J
| author name = Difrancesco N
| author affiliation = NRC/NRR/DORL/LPLIII-2
| author affiliation = NRC/NRR/DORL/LPLIII-2
| addressee name = Gropp R
| addressee name = Gropp R
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Quad Cities Nuclear Draft RAI# I EAL Question GENERIC It is expected that licensees adhere to endorsed guidance, particularly for Initiating Conditions and Definitions, with no differences or deviations other than those related to a licensee's particular design. This is to ensure regulatory stability of the Emergency Action Level (EAL) scheme. This also ensures that, as stated in Title 10 of the Code of Federal Regulations, (10 CFR), Paragraph 50.47(b)(4), licensees implement "A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters  
{{#Wiki_filter:Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI# I   EAL                                         Question It is expected that licensees adhere to endorsed guidance, particularly for Initiating Conditions and Definitions, with no differences or deviations other than those related to a licensee's particular design. This is to ensure regulatory stability of the Emergency Action Level (EAL) scheme.
... : While the NRC staff is not enforcing strict verbatim compliance with the endorsed guidance, where applicable, the NRC staff will be pointing out areas where it expects the endorsed guidance to be used to ensure implementation of a standard scheme. This is primarily based upon industry and NRC staff experience with issues related to a particular EAL. While formatting is usually not technically relevant to the NRC staffs review of EALs, when inconsistent formatting may result in potential misunderstanding, an RAI will be developed to correct the formatting or to obtain additional information in support of the deviation.
This also ensures that, as stated in Title 10 of the Code of Federal Regulations, (10 CFR), Paragraph 50.47(b)(4), licensees implement "A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters ... :
Dresden/Quad Cities Draft RAIs pg.l RAI# I EAL GENERIC Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft Question It is expected that licensees adhere to endorsed guidance, particularly for Initiating Conditions and Definitions, with no differences or deviations other than those related to a licensee's particular design. This is to ensure regulatory stability of the Emergency Action Level (EAL) scheme. This also ensures that, as stated in Title 10 of the Code of Federal Regulations, (10 CFR), Paragraph 50.47(b)(4), licensees implement "A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters
GENERIC      While the NRC staff is not enforcing strict verbatim compliance with the endorsed guidance, where applicable, the NRC staff will be pointing out areas where it expects the endorsed guidance to be used to ensure implementation of a standard scheme. This is primarily based upon industry and NRC staff experience with issues related to a particular EAL.
... : While the NRC staff is not enforcing strict verbatim compliance with the endorsed guidance, where applicable, the NRC staff will be pointing out areas where it expects the endorsed guidance to be used to ensure implementation of a standard scheme. This is primarily based upon industry and NRC staff experience with issues related to a particular EAL. While formatting is usually not technically relevant to the NRC staffs review of EALs, when inconsistent formatting may result in potential misunderstanding, an RAI will be developed to correct the formatting or to obtain additional information in support of the deviation.
While formatting is usually not technically relevant to the NRC staffs review of EALs, when inconsistent formatting may result in potential misunderstanding, an RAI will be developed to correct the formatting or to obtain additional information in support of the deviation.
Dresden/Quad Cities Draft RAIs pg.l Exelon EAL Upgrade Project NRC Request for Additional Dresden Nuclear Power Quad Cities Nuclear Draft RAI# EAL Question 1 GENERAL 1. 2. 3. 4. 5. 6. 7. Please confirm that all stated values, set points, and indications provided are within the calibrated range of the applicable instrumentation and that the instrumentation is appropriate for the EAL Off-scale high or low thresholds are usually not within the calibrated range of instrumentation.
Dresden/Quad Cities Draft RAIs             pg.l
Please explain how the EALs that use one or the other of these thresholds will not be confused with failed instrumentation.
 
The NEIIC Cross-Reference Table has several errors and should be revised to ensure a quality EAL Technical Basis Document:
Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI#    EAL                                            Question
: a. MU2 (Exelon) not reflected as CU3 (NEI) b. HS4 (Exelon) incorrectly referenced, it is actually HS2 (Exelon) Sections 3.9, 3.10, and 3.11 from the endorsed guidance contain important information necessary to understand the intent of the guidance as well as NRC staff expectations.
: 1. Please confirm that all stated values, set points, and indications provided are within the calibrated range of the applicable instrumentation and that the instrumentation is appropriate for the EAL
Please indicate whether these sections will be incorporated into the document or fully document the technical basis for why it cannot be incorporated.
: 2. Off-scale high or low thresholds are usually not within the calibrated range of instrumentation. Please explain how the EALs that use one or the other of these thresholds will not be confused with failed instrumentation.
Missing EAL Basis Document pages, from 3-9 through 3-28 (3-29 Dresden).
: 3. The NEIIC Cross-Reference Table has several errors and should be revised to ensure a quality EAL Technical Basis Document:
The staff needs to review the entire EAL Technical Basis Document and supporting information.
: a. MU2 (Exelon) not reflected as CU3 (NEI)
Please provide the missing information or explain the discrepancy.
: b. HS4 (Exelon) incorrectly referenced, it is actually HS2 (Exelon)
The entire paragraph from Section 3.1 related to "EALs are for unplanned events ... " is incorrect and not in accordance with staff expectations or in accordance with the standard EAL scheme (section 3.9) endorsed by the NRC. Please revise to incorporate the endorsed expectation or provide technical justification to support the deviation.
: 4. Sections 3.9, 3.10, and 3.11 from the endorsed guidance contain important information necessary to understand the intent of the guidance as well as NRC staff expectations. Please indicate whether these sections will be 1    GENERAL      incorporated into the document or fully document the technical basis for why it cannot be incorporated.
The NRC staff requests that ADAMS Accession No. ML080450149 be used to reference NEI 99-01, Revision 5, to ensure that the multiple draft copies of this document that are in ADAMS are not inadvertently referenced . Dresden/Quad Cities Draft RAIs pg.2 RAI# EAL 1. 2. 3. 4. 1 GENERAL 5. 6. 7. Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft Question Please confirm that all stated values, set points, and indications provided are within the calibrated range of the applicable instrumentation and that the instrumentation is appropriate for the EAL Off-scale high or low thresholds are usually not within the calibrated range of instrumentation.
: 5. Missing EAL Basis Document pages, from 3-9 through 3-28 (3-29 Dresden).
Please explain how the EALs that use one or the other of these thresholds will not be confused with failed instrumentation.
The staff needs to review the entire EAL Technical Basis Document and supporting information. Please provide the missing information or explain the discrepancy.
The NEIIC Cross-Reference Table has several errors and should be revised to ensure a quality EAL Technical Basis Document:
: 6. The entire paragraph from Section 3.1 related to "EALs are for unplanned events ... " is incorrect and not in accordance with staff expectations or in accordance with the standard EAL scheme (section 3.9) endorsed by the NRC. Please revise to incorporate the endorsed expectation or provide technical justification to support the deviation.
: a. MU2 (Exelon) not reflected as CU3 (NEI) b. HS4 (Exelon) incorrectly referenced, it is actually HS2 (Exelon) Sections 3.9, 3.10, and 3.11 from the endorsed guidance contain important information necessary to understand the intent of the guidance as well as NRC staff expectations.
: 7. The NRC staff requests that ADAMS Accession No. ML080450149 be used to reference NEI 99-01, Revision 5, to ensure that the multiple draft copies of this document that are in ADAMS are not inadvertently referenced .
Please indicate whether these sections will be incorporated into the document or fully document the technical basis for why it cannot be incorporated.
Dresden/Quad Cities Draft RAIs              pg.2
Missing EAL Basis Document pages, from 3-9 through 3-28 (3-29 Dresden).
 
The staff needs to review the entire EAL Technical Basis Document and supporting information.
Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI#    EAL                                                Question It is expected that definitions are verbatim from the endorsed guidance, with the exception of terms specifically defined by the licensee, to ensure implementation of a standard emergency classification and action level scheme.
Please provide the missing information or explain the discrepancy.
: 1. As noted above, please provide the site-specific definitions for the following terms rather than the generic wording used in the endorsed guidance:
The entire paragraph from Section 3.1 related to "EALs are for unplanned events ... " is incorrect and not in accordance with staff expectations or in accordance with the standard EAL scheme (section 3.9) endorsed by the NRC. Please revise to incorporate the endorsed expectation or provide technical justification to support the deviation.
: a. Containment closure 2    SECT 4.0
The NRC staff requests that ADAMS Accession No. ML080450149 be used to reference NEI 99-01, Revision 5, to ensure that the multiple draft copies of this document that are in ADAMS are not inadvertently referenced . Dresden/Quad Cities Draft RAIs pg.2 Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Quad Cities Nuclear Draft Question RAI# EAL It is expected that definitions are verbatim from the endorsed guidance, with the exception of terms specifically defined by the licensee, to ensure implementation of a standard emergency classification and action level scheme. As noted above, please provide the site-specific definitions for the following terms rather than the generic wording used in the endorsed guidance:
: b. Protected area
: a. Containment closure SECT 4.0 2 Protected area Vital area Owner controlled area Explain the deviation with adding the caveat " ... group offive or more persons ... " to the definition of Civil Disturbance. The 2nd paragraph from the endorsed guidance is not considered by the staff to be EAL Developer information.
: c. Vital area
Please incorporate this information to ensure consistency in understanding, or provide further justification.
: d. Owner controlled area
3 RS1 [OC] Explain how the threshold for EAL #1 can be read. The typical logarithmic scale would be difficult to read 1.62 E+06. RG1 Explain the resolution for the stated indicators as the stated values are RS1 difficult to read accurately on a typical logarithmic scale. 4 RA1 [DR] Provide justification for why the set point for EAL #2 is the same for RU1 RA1 and RS1, or revise The IC states "Radiological Effluent Technical Specifications/ODCM." Typically, RA1 5 licensees use one or the other, not both. Please verify that the wording aligns RU1 with your site's document.
: 2. Explain the deviation with adding the caveat " ... group offive or more persons ... " to the definition of Civil Disturbance.
Please explain why the Secondary Alarm Station (SAS) is in Table R2, or revise 6 accordingly.
: 1. The 2nd paragraph from the endorsed guidance is not considered by the staff to be EAL Developer information. Please incorporate this information to ensure consistency in understanding, or provide further justification.
Typically, it is either the Central Alarm Station (CAS) or SAS, not both. RA3 The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by 7 the NRC (NEI 99-01 Revision 5), has this EAL as SU4. Explain why this EAL deviates from the endorsed guidance, or revise accordingly.
3      RS1
RU3 Dresden/Quad Cities Draft RAIs pg.3 RAI# EAL 2 SECT 4.0 3 RS1 RG1 RS1 4 RA1 RU1 FC5 RA1 5 RU1 6 RA3 7 RU3 Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft Question It is expected that definitions are verbatim from the endorsed guidance, with the exception of terms specifically defined by the licensee, to ensure implementation of a standard emergency classification and action level scheme. 1. As noted above, please provide the site-specific definitions for the following terms rather than the generic wording used in the endorsed guidance:
: 2.   [OC] Explain how the threshold for EAL #1 can be read. The typical logarithmic scale would be difficult to read 1.62 E+06.
: a. Containment closure b. Protected area c. Vital area d. Owner controlled area 2. Explain the deviation with adding the caveat " ... group offive or more persons ... " to the definition of Civil Disturbance.
RG1 RS1      1. Explain the resolution for the stated indicators as the stated values are difficult to read accurately on a typical logarithmic scale.
: 1. The 2nd paragraph from the endorsed guidance is not considered by the staff to be EAL Developer information.
4      RA1
Please incorporate this information to ensure consistency in understanding, or provide further justification.
: 2.    [DR] Provide justification for why the set point for EAL #2 is the same for RU1            RA1 and RS1, or revise accordingly.
: 2. [OC] Explain how the threshold for EAL #1 can be read. The typical logarithmic scale would be difficult to read 1.62 E+06. 1. Explain the resolution for the stated indicators as the stated values are difficult to read accurately on a typical logarithmic scale. 2. [DR] Provide justification for why the set point for EAL #2 is the same for RA1 and RS1, or revise accordingly.
FC5 RA1    The IC states "Radiological Effluent Technical Specifications/ODCM." Typically, 5             licensees use one or the other, not both. Please verify that the wording aligns RU1    with your site's document.
The IC states "Radiological Effluent Technical Specifications/ODCM." Typically, licensees use one or the other, not both. Please verify that the wording aligns with your site's document.
Please explain why the Secondary Alarm Station (SAS) is in Table R2, or revise 6      RA3    accordingly. Typically, it is either the Central Alarm Station (CAS) or SAS, not both.
Please explain why the Secondary Alarm Station (SAS) is in Table R2, or revise accordingly.
The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by 7      RU3    the NRC (NEI 99-01 Revision 5), has this EAL as SU4. Explain why this EAL deviates from the endorsed guidance, or revise accordingly.
Typically, it is either the Central Alarm Station (CAS) or SAS, not both. The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by the NRC (NEI 99-01 Revision 5), has this EAL as SU4. Explain why this EAL deviates from the endorsed guidance, or revise accordingly.
Dresden/Quad Cities Draft RAIs                pg.3
Dresden/Quad Cities Draft RAIs pg.3 Exelon EAL Upgrade Project NRC Request for Additional Dresden Nuclear Power Quad Cities Nuclear Draft RAI# EAL Question 8 FISSION BARRIER MATRIX 1. 2. Need to see the Fission Barrier Matrix Table as it is part of the standard EAL scheme required by 10 CFR 50.47(b)(4), and endorsed by the NRC (NEI 99-01 Revision 5). Please provide sufficient justification to support not developing additional thresholds, Le., "other," as expected from the endorsed guidance.
 
9 CT7 1. i 2. Please explain the deviation from the endorsed guidance and standard EAL Scheme for LOSS 1.a, i.e., you did not state "all" isolation valves. This could lead to a misunderstanding as to the intent of the threshold.
Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI#      EAL                                           Question
Please explain in more detail why the 2nd paragraph was added to the Basis information as this is not as endorsed and not considered to be in alignment with the standard EAL scheme as it specifically excludes expected consideration of the threshold.
: 1. Need to see the Fission Barrier Matrix Table as it is part of the standard FISSION        EAL scheme required by 10 CFR 50.47(b)(4), and endorsed by the NRC 8    BARRIER          (NEI 99-01 Revision 5).
10 MA2, MU3, MU4, MA5, MU5, MG8, MS8, MA8, MU8, MU9, MU10/MU6*
MATRIX      2. Please provide sufficient justification to support not developing additional thresholds, Le., "other," as expected from the endorsed guidance.
The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by the NRC (NEI 99-01 Revision 5), has these EALs in their own unique table, and own unique IC designation, for Cold/Refuel EALs. Explain why this EAL deviates from the endorsed guidance and from the regulatory required standard EAL scheme, or revise accordingly.
: 1. Please explain the deviation from the endorsed guidance and standard EAL Scheme for LOSS 1.a, i.e., you did not state "all" isolation valves. This could lead to a misunderstanding as to the intent of the threshold.
*MU10 and MU6 were combined for Cold and Hot operating modes. As stated above, the staff expects an IC/EAL for each. 11 MG1 MS1 MA1 MA2 MU2 Explain how the SBO Diesel Generator is addressed in your Tech Specs, specifically, how is this DG controlled such that it can be relied upon as part of this EAL set. 12 MA3 Explain how one threshold can be based on Reactor Power >6% and the other threshold be based upon Reactor Power This appears to be a contrad iction. 13 MU3 Explain the statement, "This EAL is satisfied when corrective actions are required in response to an unplanned sustained positive startup rate to mitigate the positive startup rate." This is not from the endorsed guidance and may lead to errors in meeting staff expectations for EAL classification.
9      CT7    i  2. Please explain in more detail why the 2nd paragraph was added to the Basis information as this is not as endorsed and not considered to be in alignment with the standard EAL scheme as it specifically excludes expected consideration of the threshold.
Dresden/Quad Cities Draft RAIs pg.4 RAI# EAL FISSION 8 BARRIER MATRIX 9 CT7 MA2, MU3, MU4, MA5, 10 MU5, MG8, MS8, MA8, MU8, MU9, MU10/MU6*
The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by MA2, MU3,   the NRC (NEI 99-01 Revision 5), has these EALs in their own unique table, and MU4, MA5,  own unique IC designation, for Cold/Refuel EALs. Explain why this EAL MU5, MG8,  deviates from the endorsed guidance and from the regulatory required standard 10 MS8, MA8,  EAL scheme, or revise accordingly.
MG1 MS1 11 MA1 MA2 MU2 12 MA3 13 MU3 1. 2. 1. i 2. Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft Question Need to see the Fission Barrier Matrix Table as it is part of the standard EAL scheme required by 10 CFR 50.47(b)(4), and endorsed by the NRC (NEI 99-01 Revision 5). Please provide sufficient justification to support not developing additional thresholds, Le., "other," as expected from the endorsed guidance.
MU8, MU9, MU10/MU6*    *MU10 and MU6 were combined for Cold and Hot operating modes. As stated above, the staff expects an IC/EAL for each.
Please explain the deviation from the endorsed guidance and standard EAL Scheme for LOSS 1.a, i.e., you did not state "all" isolation valves. This could lead to a misunderstanding as to the intent of the threshold.
MG1 MS1 Explain how the SBO Diesel Generator is addressed in your Tech Specs, 11      MA1      specifically, how is this DG controlled such that it can be relied upon as part of this EAL set.
Please explain in more detail why the 2nd paragraph was added to the Basis information as this is not as endorsed and not considered to be in alignment with the standard EAL scheme as it specifically excludes expected consideration of the threshold.
MA2 MU2 Explain how one threshold can be based on Reactor Power >6% and the other 12      MA3      threshold be based upon Reactor Power ~%. This appears to be a contrad iction.
The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by the NRC (NEI 99-01 Revision 5), has these EALs in their own unique table, and own unique IC designation, for Cold/Refuel EALs. Explain why this EAL deviates from the endorsed guidance and from the regulatory required standard EAL scheme, or revise accordingly.
Explain the statement, "This EAL is satisfied when corrective actions are required in response to an unplanned sustained positive startup rate to mitigate 13      MU3 the positive startup rate." This is not from the endorsed guidance and may lead to errors in meeting staff expectations for EAL classification.
*MU10 and MU6 were combined for Cold and Hot operating modes. As stated above, the staff expects an IC/EAL for each. Explain how the SBO Diesel Generator is addressed in your Tech Specs, specifically, how is this DG controlled such that it can be relied upon as part of this EAL set. Explain how one threshold can be based on Reactor Power >6% and the other threshold be based upon Reactor Power This appears to be a contrad iction. Explain the statement, "This EAL is satisfied when corrective actions are required in response to an unplanned sustained positive startup rate to mitigate the positive startup rate." This is not from the endorsed guidance and may lead to errors in meeting staff expectations for EAL classification.
Dresden/Quad Cities Draft RAIs              pg.4
Dresden/Quad Cities Draft RAIs pg.4 Exelon EAL Upgrade Project NRC Request for Additional Dresden Nuclear Power Quad Cities Nuclear Draft RAI# EAL Question 14 MU7 Please explain why the information related to a stuck open relief valve was not incorporated into this EAL as endorsed in the guidance, or revise accordingly.
 
15 MU8 Please explain why you added the deviation from the endorsed guidance related to * ... restore and maintained
Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI#    EAL                                              Question Please explain why the information related to a stuck open relief valve was not 14      MU7 incorporated into this EAL as endorsed in the guidance, or revise accordingly.
... " in the Basis information.
Please explain why you added the deviation from the endorsed guidance related 15      MU8    to * ... restore and maintained ... " in the Basis information. The expectation is that level must be back above the procedurally established limit.
The expectation is that level must be back above the procedurally established limit. 16 MU10 Please explain how the Nuclear Alert Reporting System (NARS) line can notify the NRC (for offsite).
Please explain how the Nuclear Alert Reporting System (NARS) line can notify 16      MU10 the NRC (for offsite).
17 HU3 The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by the NRC (NEI 99-01 Revision 5), has the explosion EAL without the 'damage' caveat. Explain why you have a deviation from the endorsed guidance and from the regulatory required standard EAL scheme, or revise accordingly for the threshold and Basis. 18 HA4 HU4 Please explain how an earthquake could be so selective that it only impacts certain areas of the site and not others as stated in your basis in your definition of *in plan!"? 19 HA5 The Basis information is considered to be a deviation from the endorsed guidance and contrary to the regulatory requirement for a standard EAL scheme. The information from the endorsed guidance, particularly the 3rd paragraph, states the staff's expectations for this EAL. The 3rd and 4th paragraphs in your submittal conflict with that expectation.
The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by the NRC (NEI 99-01 Revision 5), has the explosion EAL without the 'damage' 17      HU3      caveat. Explain why you have a deviation from the endorsed guidance and from the regulatory required standard EAL scheme, or revise accordingly for the threshold and Basis.
Please provide sufficient justification for the deviation, or revise accordingly.
HA4      Please explain how an earthquake could be so selective that it only impacts 18                certain areas of the site and not others as stated in your basis in your definition HU4      of *in plan!"?
20 HU5 The 4th and ih paragraphs of your Basis information are a deviation from the endorsed guidance.
The Basis information is considered to be a deviation from the endorsed guidance and contrary to the regulatory requirement for a standard EAL scheme. The information from the endorsed guidance, particularly the 3rd 19      HA5 paragraph, states the staff's expectations for this EAL. The 3rd and 4th paragraphs in your submittal conflict with that expectation. Please provide sufficient justification for the deviation, or revise accordingly.
Please explain in more detail, or revise accordingly.
The 4th and ih paragraphs of your Basis information are a deviation from the 20      HU5 endorsed guidance. Please explain in more detail, or revise accordingly.
Dresden/Quad Cities Draft RAIs pg.5 RAI# EAL 14 MU7 15 MU8 16 MU10 17 HU3 HA4 18 HU4 19 HA5 20 HU5 Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft Question Please explain why the information related to a stuck open relief valve was not incorporated into this EAL as endorsed in the guidance, or revise accordingly.
Dresden/Quad Cities Draft RAIs               pg.5}}
Please explain why you added the deviation from the endorsed guidance related to * ... restore and maintained
... " in the Basis information.
The expectation is that level must be back above the procedurally established limit. Please explain how the Nuclear Alert Reporting System (NARS) line can notify the NRC (for offsite).
The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by the NRC (NEI 99-01 Revision 5), has the explosion EAL without the 'damage' caveat. Explain why you have a deviation from the endorsed guidance and from the regulatory required standard EAL scheme, or revise accordingly for the threshold and Basis. Please explain how an earthquake could be so selective that it only impacts certain areas of the site and not others as stated in your basis in your definition of *in plan!"? The Basis information is considered to be a deviation from the endorsed guidance and contrary to the regulatory requirement for a standard EAL scheme. The information from the endorsed guidance, particularly the 3rd paragraph, states the staff's expectations for this EAL. The 3rd and 4th paragraphs in your submittal conflict with that expectation.
Please provide sufficient justification for the deviation, or revise accordingly.
The 4th and ih paragraphs of your Basis information are a deviation from the endorsed guidance.
Please explain in more detail, or revise accordingly.
Dresden/Quad Cities Draft RAIs pg.5}}

Latest revision as of 16:09, 13 November 2019

Attachment to Draft RAIs -Exelon EAL Upgrade Project
ML102150530
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 07/29/2010
From: Nicholas Difrancesco
Plant Licensing Branch III
To: Gropp R
Exelon Corp
DiFrancesco N, NRR/DORL/LPL3-2, 415-1115
Shared Package
ml102150534 List:
References
TAC ME3033, TAC ME3034, TAC ME3042, TAC ME3043
Download: ML102150530 (5)


Text

Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI# I EAL Question It is expected that licensees adhere to endorsed guidance, particularly for Initiating Conditions and Definitions, with no differences or deviations other than those related to a licensee's particular design. This is to ensure regulatory stability of the Emergency Action Level (EAL) scheme.

This also ensures that, as stated in Title 10 of the Code of Federal Regulations, (10 CFR), Paragraph 50.47(b)(4), licensees implement "A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters ... :

GENERIC While the NRC staff is not enforcing strict verbatim compliance with the endorsed guidance, where applicable, the NRC staff will be pointing out areas where it expects the endorsed guidance to be used to ensure implementation of a standard scheme. This is primarily based upon industry and NRC staff experience with issues related to a particular EAL.

While formatting is usually not technically relevant to the NRC staffs review of EALs, when inconsistent formatting may result in potential misunderstanding, an RAI will be developed to correct the formatting or to obtain additional information in support of the deviation.

Dresden/Quad Cities Draft RAIs pg.l

Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI# EAL Question

1. Please confirm that all stated values, set points, and indications provided are within the calibrated range of the applicable instrumentation and that the instrumentation is appropriate for the EAL
2. Off-scale high or low thresholds are usually not within the calibrated range of instrumentation. Please explain how the EALs that use one or the other of these thresholds will not be confused with failed instrumentation.
3. The NEIIC Cross-Reference Table has several errors and should be revised to ensure a quality EAL Technical Basis Document:
a. MU2 (Exelon) not reflected as CU3 (NEI)
b. HS4 (Exelon) incorrectly referenced, it is actually HS2 (Exelon)
4. Sections 3.9, 3.10, and 3.11 from the endorsed guidance contain important information necessary to understand the intent of the guidance as well as NRC staff expectations. Please indicate whether these sections will be 1 GENERAL incorporated into the document or fully document the technical basis for why it cannot be incorporated.
5. Missing EAL Basis Document pages, from 3-9 through 3-28 (3-29 Dresden).

The staff needs to review the entire EAL Technical Basis Document and supporting information. Please provide the missing information or explain the discrepancy.

6. The entire paragraph from Section 3.1 related to "EALs are for unplanned events ... " is incorrect and not in accordance with staff expectations or in accordance with the standard EAL scheme (section 3.9) endorsed by the NRC. Please revise to incorporate the endorsed expectation or provide technical justification to support the deviation.
7. The NRC staff requests that ADAMS Accession No. ML080450149 be used to reference NEI 99-01, Revision 5, to ensure that the multiple draft copies of this document that are in ADAMS are not inadvertently referenced .

Dresden/Quad Cities Draft RAIs pg.2

Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI# EAL Question It is expected that definitions are verbatim from the endorsed guidance, with the exception of terms specifically defined by the licensee, to ensure implementation of a standard emergency classification and action level scheme.

1. As noted above, please provide the site-specific definitions for the following terms rather than the generic wording used in the endorsed guidance:
a. Containment closure 2 SECT 4.0
b. Protected area
c. Vital area
d. Owner controlled area
2. Explain the deviation with adding the caveat " ... group offive or more persons ... " to the definition of Civil Disturbance.
1. The 2nd paragraph from the endorsed guidance is not considered by the staff to be EAL Developer information. Please incorporate this information to ensure consistency in understanding, or provide further justification.

3 RS1

2. [OC] Explain how the threshold for EAL #1 can be read. The typical logarithmic scale would be difficult to read 1.62 E+06.

RG1 RS1 1. Explain the resolution for the stated indicators as the stated values are difficult to read accurately on a typical logarithmic scale.

4 RA1

2. [DR] Provide justification for why the set point for EAL #2 is the same for RU1 RA1 and RS1, or revise accordingly.

FC5 RA1 The IC states "Radiological Effluent Technical Specifications/ODCM." Typically, 5 licensees use one or the other, not both. Please verify that the wording aligns RU1 with your site's document.

Please explain why the Secondary Alarm Station (SAS) is in Table R2, or revise 6 RA3 accordingly. Typically, it is either the Central Alarm Station (CAS) or SAS, not both.

The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by 7 RU3 the NRC (NEI 99-01 Revision 5), has this EAL as SU4. Explain why this EAL deviates from the endorsed guidance, or revise accordingly.

Dresden/Quad Cities Draft RAIs pg.3

Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI# EAL Question

1. Need to see the Fission Barrier Matrix Table as it is part of the standard FISSION EAL scheme required by 10 CFR 50.47(b)(4), and endorsed by the NRC 8 BARRIER (NEI 99-01 Revision 5).

MATRIX 2. Please provide sufficient justification to support not developing additional thresholds, Le., "other," as expected from the endorsed guidance.

1. Please explain the deviation from the endorsed guidance and standard EAL Scheme for LOSS 1.a, i.e., you did not state "all" isolation valves. This could lead to a misunderstanding as to the intent of the threshold.

9 CT7 i 2. Please explain in more detail why the 2nd paragraph was added to the Basis information as this is not as endorsed and not considered to be in alignment with the standard EAL scheme as it specifically excludes expected consideration of the threshold.

The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by MA2, MU3, the NRC (NEI 99-01 Revision 5), has these EALs in their own unique table, and MU4, MA5, own unique IC designation, for Cold/Refuel EALs. Explain why this EAL MU5, MG8, deviates from the endorsed guidance and from the regulatory required standard 10 MS8, MA8, EAL scheme, or revise accordingly.

MU8, MU9, MU10/MU6* *MU10 and MU6 were combined for Cold and Hot operating modes. As stated above, the staff expects an IC/EAL for each.

MG1 MS1 Explain how the SBO Diesel Generator is addressed in your Tech Specs, 11 MA1 specifically, how is this DG controlled such that it can be relied upon as part of this EAL set.

MA2 MU2 Explain how one threshold can be based on Reactor Power >6% and the other 12 MA3 threshold be based upon Reactor Power ~%. This appears to be a contrad iction.

Explain the statement, "This EAL is satisfied when corrective actions are required in response to an unplanned sustained positive startup rate to mitigate 13 MU3 the positive startup rate." This is not from the endorsed guidance and may lead to errors in meeting staff expectations for EAL classification.

Dresden/Quad Cities Draft RAIs pg.4

Exelon EAL Upgrade Project NRC Request for Additional Information Dresden Nuclear Power Station Quad Cities Nuclear Station Draft RAI# EAL Question Please explain why the information related to a stuck open relief valve was not 14 MU7 incorporated into this EAL as endorsed in the guidance, or revise accordingly.

Please explain why you added the deviation from the endorsed guidance related 15 MU8 to * ... restore and maintained ... " in the Basis information. The expectation is that level must be back above the procedurally established limit.

Please explain how the Nuclear Alert Reporting System (NARS) line can notify 16 MU10 the NRC (for offsite).

The standard EAL scheme required by 10 CFR 50.47(b) (4), and endorsed by the NRC (NEI 99-01 Revision 5), has the explosion EAL without the 'damage' 17 HU3 caveat. Explain why you have a deviation from the endorsed guidance and from the regulatory required standard EAL scheme, or revise accordingly for the threshold and Basis.

HA4 Please explain how an earthquake could be so selective that it only impacts 18 certain areas of the site and not others as stated in your basis in your definition HU4 of *in plan!"?

The Basis information is considered to be a deviation from the endorsed guidance and contrary to the regulatory requirement for a standard EAL scheme. The information from the endorsed guidance, particularly the 3rd 19 HA5 paragraph, states the staff's expectations for this EAL. The 3rd and 4th paragraphs in your submittal conflict with that expectation. Please provide sufficient justification for the deviation, or revise accordingly.

The 4th and ih paragraphs of your Basis information are a deviation from the 20 HU5 endorsed guidance. Please explain in more detail, or revise accordingly.

Dresden/Quad Cities Draft RAIs pg.5