{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125March 1, 2011  
{{#Wiki_filter:UNITED STATES
  Randall K. Edington, Executive  
                                  NUC LE AR RE G ULATO RY C O M M I S S I O N
   Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034  
                                                    R E GI ON I V
                                        612 EAST LAMAR BLVD , SU I TE 400
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION UNIT2- NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000529/2011003) AND REQUEST FOR INFORMATION  
                                          AR LI N GTON , TEXAS 76011-4125
                                            March 1, 2011
Dear Mr. Edington:  
Randall K. Edington, Executive
From April 11-22, 2011, reactor inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at Palo Verde Nuclear Generating Station Unit 2, using NRC Inspection Procedure 71111.08, "Inservice Inspection Activities."
   Vice President, Nuclear/CNO
Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure), due by March 28, 2011, identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is  
Arizona Public Service Company
important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
P.O. Box 52034, Mail Stop 7602
We have discussed the schedule for these inspection activities with your staff and understand  
Phoenix, AZ 85072-2034
that our regulatory contact for this inspection will be Mr. Del Elkington of your licensing organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact Gerond George at (817) 276-6562 (gerond.george@nrc.gov) or James Adams at (817) 860-8294 (james.adams@nrc.gov).  
SUBJECT:       PALO VERDE NUCLEAR GENERATING STATION UNIT2- NOTIFICATION OF
                INSPECTION (NRC INSPECTION REPORT 05000529/2011003) AND
                REQUEST FOR INFORMATION
Dear Mr. Edington:
From April 11-22, 2011, reactor inspectors from the Nuclear Regulatory Commissions (NRC)
Region IV office will perform the baseline inservice inspection at Palo Verde Nuclear Generating
Station Unit 2, using NRC Inspection Procedure 71111.08, Inservice Inspection Activities.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into two groups. The first group (Section A of
the enclosure), due by March 28, 2011, identifies information to be provided prior to the
inspection to ensure that the inspectors are adequately prepared. The second group (Section B
of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is
important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Del Elkington of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact Gerond George at (817) 276-6562 (gerond.george@nrc.gov) or James Adams at
(817) 860-8294 (james.adams@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.


This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a
Arizona Public Service Company               -2-
request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
 
enclosure will be available electronically for public inspection in the NRC Public Document
Arizona Public Service Company - 2 -  
Room or from the Publicly Available Records (PARS) component of NRCs document
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
  Sincerely,   /RA/  
rm/adams.html (the Public Electronic Reading Room).
  Gregory E. Werner, Chief Plant Support Branch 2 Division of Reactor Safety  
                                                        Sincerely,
Docket:   50-529 License: NPF-51  
                                                                  /RA/
                                                        Gregory E. Werner, Chief
                                                        Plant Support Branch 2
                                                        Division of Reactor Safety
Docket: 50-529
License: NPF-51
Enclosure:
Inservice Inspection Document Request
cc w/enclosure:
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, AZ 85007
Mr. Douglas K. Porter, Esq
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, CA 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson, 10th Floor
Phoenix, AZ 85003
Mr. Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, AZ 85040
Mr. Dwight C. Mims
Vice President
Regulatory Affairs and Plant Improvement
Palo Verde Nuclear Generating Station
Mail Station 7605
P.O. Box 52034
Phoenix, AZ 85072-2034


Enclosure: Inservice Inspection Document Request
Arizona Public Service Company            -3-
cc w/enclosure:
Mr. Ron Barnes, Director
Regulatory Affairs
Palo Verde Nuclear Generating Station
MS 7638
P.O. Box 52034
Phoenix, AZ 85072-2034
Mr. Jeffrey T. Weikert
Assistant General Counsel
El Paso Electric Company
Mail Location 167
123 W. Mills
El Paso, TX 79901
Michael S. Green
Senior Regulatory Counsel
Pinnacle West Capital Corporation
P.O. Box 52034, MS 8695
Phoenix, AZ 85072-2034
Mr. Eric Tharp
Los Angeles Department of Water & Power
Southern California Public Power Authority
P.O. Box 51111, Room 1255-C
Los Angeles, CA 90051-0100
Mr. James Ray
Public Service Company of New Mexico
2401 Aztec NE, MS Z110
Albuquerque, NM 87107-4224
Mr. Geoffrey M. Cook
Southern California Edison Company
5000 Pacific Coast Hwy. Bldg. D21
San Clemente, CA 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale, AZ 85251
Mr. Brian Almon
Public Utility Commission
William B. Travis Building
P.O. Box 13326
Austin, TX 78701-3326


Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007
Arizona Public Service Company    -4-
Environmental Program Manager
City of Phoenix
Office of Environmental Programs
200 West Washington Street
Phoenix, AZ 85003
Mr. John C. Taylor
Director, Nuclear Generation
El Paso Electric Company
340 East Palm Lane, Suite 310
Phoenix, AZ 85004
Chief, Technological Hazards
  Branch
FEMA Region IX
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
Jake Lefman
Southern California Edison Company
5000 Pacific Coast Hwy, Bldg. D21
San Clemente, CA 92672


Mr. Douglas K. Porter, Esq Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770
Arizona Public Service Company              -5-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov )
Deputy Regional Administrator (Art.Howell@nrc.gov )
DRP Director (Kriss.Kennedy@nrc.gov )
DRP Deputy Director (Troy.Pruett@nrc.gov )
DRS Director (Anton.Vegel@nrc.gov )
DRS Deputy Director (Vacant)
Senior Resident Inspector (Tony.Brown@nrc.gov )
Resident Inspector (Joseph.Bashore@nrc.gov )
Resident Inspector (Mica.Baquera@nrc.gov )
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov )
PV Administrative Assistant (Regina.McFadden@nrc.gov )
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )
Project Engineer, DRP/D (Peter.Jayroe@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov )
Public Affairs Officer (Lara.Uselding@nrc.gov )
Project Manager (Randy.Hall@nrc.gov )
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
Regional Counsel (Karla.Fuller@nrc.gov )
Congressional Affairs Officer (Jenny.Weil@nrc.gov )
OEMail Resource
Inspection Reports/MidCycle and EOC Letters to the following:
ROPreports
R:\                                                        ADAMS ML
ADAMS:        No    7 Yes        7 SUNSI Review Complete      Reviewer Initials: GAG
                                  7 Publicly Available        7 Non-Sensitive
                                    Non-publicly Available      Sensitive
SRI:EB1                C:PSB2
GAGeorge                GEWerner
  Via E-Mail - /RA/      /RA/
02/23/2011              02/28/2011


Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ  85003
                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:            April 11 through April 22, 2011
Inspection Procedures:      IP 71111.08 "Inservice Inspection (ISI) Activities"
                            TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"
Inspectors:                  Gerond George, Senior Reactor Inspector (Lead Inspector - ISI)
                            James Adams, Reactor Inspector
A.    Information Requested for the In-Office Preparation Week
      The following information should be sent to the Region IV office in hard copy or
      electronic format (ims.certrec.com preferred), in care of Gerond George, by March 28,
      2011, to facilitate the selection of specific items that will be reviewed during the onsite
      inspection week. The inspectors will select specific items from the information requested
      below and then request from your staff additional documents needed during the onsite
      inspection week (Section B of this enclosure). We ask that the specific items selected
      from the lists be available and ready for review on the first day of inspection. Please
      provide requested documentation electronically if possible. If requested documents are
      large and only hard copy formats are available, please inform the inspector(s), and
      provide subject documentation during the first day of the onsite inspection. If you have
      any questions regarding this information request, please call the inspector as soon as
      possible.
A.1    ISI/Welding Programs and Schedule Information
      a)      A detailed schedule (including preliminary dates) of:
              i)      Nondestructive examinations planned for Class 1 & 2 systems and
                        containment, performed as part of your ASME Section XI, risk informed (if
                        applicable), and augmented inservice inspection programs during the
                        upcoming outage
                        Provide a status summary of the nondestructive examination inspection
                        activities vs. the required inspection period percentages for this interval
                        by category per ASME Section XI, IWX-2400. Do not provide separately
                        if other documentation requested contains this information
              ii)      Reactor pressure vessel head examinations planned for the upcoming
                        outage
              iii)    Examinations planned for Alloy 82/182/600 components that are not
                        included in the Section XI scope (If applicable)
              iv)      Examinations planned as part of your boric acid corrosion control
                        program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
                                              -1-                                        Enclosure


Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ  85040
          v)      Welding activities that are scheduled to be completed during the
Mr. Dwight C. Mims
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034
                  components)
Phoenix, AZ  85072-2034 
    b)    A copy of ASME Section XI Code Relief Requests and associated NRC safety
Arizona Public Service Company - 3 -
          evaluations applicable to the examinations identified above.
  Mr. Ron Barnes, Director Regulatory Affairs Palo Verde Nuclear Generating Station
    c)    A list of nondestructive examination reports (ultrasonic, radiography, magnetic
MS 7638 P.O. Box 52034 Phoenix, AZ  85072-2034
          particle, dye penetrant, Visual VT-1, VT-2, and VT-3), which have identified
Mr. Jeffrey T. Weikert
          relevant conditions on Code Class 1 & 2 systems since the beginning of the last
Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX  79901
          refueling outage. This should include the previous Section XI pressure test(s)
Michael S. Green
          conducted during start up and any evaluations associated with the results of the
Senior Regulatory Counsel Pinnacle West Capital Corporation P.O. Box 52034, MS 8695 Phoenix, AZ  85072-2034
          pressure tests. Also, include in the list the nondestructive examination reports
          with relevant conditions in the reactor pressure vessel head penetration nozzles
Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100
          that have been accepted for continued service. The list of nondestructive
          examination reports should include a brief description of the structures, systems,
          or components where the relevant condition was identified.
    d)    A list with a brief description (e.g., system, material, pipe size, weld number, and
          nondestructive examinations performed) of the welds in Code Class 1 and 2
          systems which have been fabricated due to component repair/replacement
          activities since the beginning of the last refueling outage, or are planned to be
          fabricated this refueling outage.
    e)    If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
    f)    Copy of any 10 CFR Part 21 reports applicable to your structures, systems, or
          components within the scope of Section XI of the ASME Code that have been
          identified since the beginning of the last refueling outage.
    g)    A list of any temporary noncode repairs in service (e.g., pinhole leaks).
    h)    Please provide copies of the most recent self-assessments for the inservice
          inspection, welding, and Alloy 600 programs.
A.2 Reactor Pressure Vessel Head
    a)    Provide the detailed scope of the planned nondestructive examinations of the
          reactor vessel head which identifies the types of nondestructive examination
          methods to be used on each specific part of the vessel head to fulfill
          commitments made in response to NRC Bulletin 2002-02 and
          NRC Order EA-03-009. Also, include examination scope expansion criteria and
                                        -2-                                       Enclosure


Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM  87107-4224
          planned expansion sample sizes if relevant conditions are identified. (If
          applicable)
    b)    A list of the standards and/or requirements that will be used to evaluate
          indications identified during nondestructive examination of the reactor vessel
          head (e.g., the specific industry or procedural standards which will be used to
          evaluate potential leakage and/or flaw indications).
A.3 Boric Acid Corrosion Control Program
    a)    Copy of the procedures that govern the scope, equipment and implementation of
          the inspections required to identify boric acid leakage and the procedures for
          boric acid leakage/corrosion evaluation.
    b)    Please provide a list of leaks (including Code class of the components) that have
          been identified since the last refueling outage and associated corrective action
          documentation. If during the last cycle, the unit was shutdown, please provide
          documentation of containment walkdown inspections performed as part of the
          boric acid corrosion control program.
    c)    Please provide a copy of the most recent self-assessment performed for the
          boric acid corrosion control program.
A.4 Steam Generator Tube Inspections
    a)    A detailed schedule of:
          i)      Steam generator tube inspection, data analyses, and repair activities for
                    the upcoming outage (If occurring)
          ii)      Steam generator secondary side inspection activities for the upcoming
                    outage. (If occurring)
    b)    Please provide a copy of your steam generator inservice inspection program and
          plan. Please include a copy of the operational assessment from last outage and
          a copy of the following documents as they become available:
          i)      Degradation assessment
          ii)      Condition monitoring assessment
    c)    If you are planning on modifying your Technical Specifications such that they are
          consistent with Technical Specification Task Force Traveler TSTF-449, Steam
          Generator Tube Integrity, please provide copies of your correspondence with the
          NRC regarding deviations from the standard technical specifications.
    d)    Copy of steam generator history documentation given to vendors performing
          eddy current testing of the steam generators during the upcoming outage.
                                        -3-                                       Enclosure


Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. D21 San Clemente, CA  92672
    e)    Copy of steam generator eddy current data analyst guidelines and site validated
          eddy current technique specification sheets. Additionally, please provide a copy
          of EPRI Appendix H, Examination Technique Specification Sheets, qualification
          records.
    f)    Identify and quantify any steam generator tube leakage experienced during the
          previous operating cycle. Also provide documentation identifying which steam
          generator was leaking and corrective actions completed or planned for this
          condition (If applicable).
    g)    Provide past history of the condition and issues pertaining to the secondary side
          of the steam generators (including items such as loose parts, fouling, top of tube
          sheet condition, crud removal amounts, etc.)
    h)    Provide copies of your most recent self assessments of the steam generator
          monitoring, loose parts monitoring, and secondary side water chemistry control
          programs.
    i)    Indicate where the primary, secondary, and resolution analyses are scheduled to
          take place.
    j)    Provide a summary of the scope of the steam generator tube examinations,
          including examination methods such as Bobbin, Rotating Pancake, or Plus Point,
          and the percentage of tubes to be examined. Do not provide these documents
          separately if already included in other information requested.
A.5 Additional Information Related to all Inservice Inspection Activities
    a)    A list with a brief description of inservice inspection, boric acid corrosion control
          program, and steam generator tube inspection related issues (e.g., condition
          reports) entered into your corrective action program since the beginning of the
          last refueling outage (for Unit 2). For example, a list based upon data base
          searches using key words related to piping or steam generator tube degradation
          such as: inservice inspection, ASME Code, Section XI, NDE, cracks, wear,
          thinning, leakage, rust, corrosion, boric acid, or errors in piping/steam generator
          tube examinations.
    b)    Please provide names and phone numbers for the following program leads:
          Inservice inspection (examination, planning)
          Containment exams
          Reactor pressure vessel head exams
          Snubbers and supports
          Repair and replacement program
          Licensing
          Site welding engineer
          Boric acid corrosion control program
          Steam generator inspection activities (site lead and vendor contact)
                                          -4-                                        Enclosure


Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251
BInformation to be provided onsite to the inspector(s) at the entrance meeting (April
Mr. Brian Almon
    11, 2011):
Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX  78701-3326
B.1 Inservice Inspection / Welding Programs and Schedule Information
    a)      Updated schedules for inservice inspection/nondestructive examination activities,
 
            including steam generator tube inspections, planned welding activities, and
Arizona Public Service Company - 4 -
            schedule showing contingency repair plans, if available.
  Environmental Program Manager City of Phoenix Office of Environmental Programs  
    b)      For ASME Code Class 1 and 2 welds selected by the inspector from the lists
200 West Washington Street Phoenix, AZ  85003 
            provided from section A of this enclosure, please provide copies of the following
Mr. John C. Taylor Director, Nuclear Generation
            documentation for each subject weld:
El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ  85004
            i)     Weld data sheet (traveler)
Chief, Technological Hazards    Branch FEMA Region IX
            ii)     Weld configuration and system location
1111 Broadway, Suite 1200 Oakland, CA  94607-4052
            iii)   Applicable Code Edition and Addenda for weldment
Jake Lefman Southern California Edison Company
            iv)     Applicable Code Edition and Addenda for welding procedures
5000 Pacific Coast Hwy, Bldg. D21 San Clemente, CA  92672
            v)     Applicable weld procedures used to fabricate the welds
 
            vi)     Copies of procedure qualification records supporting the weld procedures
Arizona Public Service Company - 5 -
                    from B.1.b.v
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Art.Howell@nrc.gov ) DRP Director (Kriss.Kennedy@nrc.gov ) DRP Deputy Director (Troy.Pruett@nrc.gov ) DRS Director (Anton.Vegel@nrc.gov ) DRS Deputy Director (Vacant) Senior Resident Inspector (Tony.Brown@nrc.gov ) Resident Inspector (Joseph.Bashore@nrc.gov ) Resident Inspector (Mica.Baquera@nrc.gov ) Branch Chief, DRP/D (Ryan.Lantz@nrc.gov ) PV Administrative Assistant (Regina.McFadden@nrc.gov ) Senior Project Engineer, DRP/D (Don.Allen@nrc.gov ) Project Engineer, DRP/D (Peter.Jayroe@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Public Affairs Officer (Lara.Uselding@nrc.gov ) Project Manager (Randy.Hall@nrc.gov ) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) Regional Counsel (Karla.Fuller@nrc.gov ) Congressional Affairs Officer (Jenny.Weil@nrc.gov ) OEMail Resource
            vii)   Copies of mechanical test reports identified in the procedure qualification
  Inspection Reports/MidCycle and EOC Letters to the following: ROPreports
                    records above
            viii)   Copies of the nonconformance reports for the selected welds (If
                    applicable)
            ix)     Radiographs of the selected welds and access to equipment to allow
                    viewing radiographs (If radiographic testing was performed)
            x)     Copies of the preservice examination records for the selected welds
            xi)     Copies of welder performance qualifications records applicable to the
                    selected welds, including documentation that welder maintained
                    proficiency in the applicable welding processes specified in the weld
                    procedures (at least 6 months prior to the date of subject work)
            xii)   Copies of nondestructive examination personnel qualifications (Visual
                    inspection, penetrant testing, ultrasonic testing, radiographic testing), as
                    applicable
                                        -5-                                        Enclosure


   
    c)   For the inservice inspection related corrective action issues selected by the
   
          inspectors from section A of this enclosure, provide a copy of the corrective
R:\        ADAMS ML ADAMS:   No      Yes  SUNSI Review Complete Reviewer Initials: GAG
          actions and supporting documentation.
  Publicly Available  Non-Sensitive
    d)    For the nondestructive examination reports with relevant conditions on Code
  Non-publicly Available  Sensitive SRI:EB1 C:PSB2  GAGeorge GEWerner  Via E-Mail - /RA/ /RA/  02/23/2011 02/28/2011 
          Class 1 and 2 systems selected by the inspectors from Section A above, provide
 
          a copy of the examination records, examiner qualification records, and
  - 1 - Enclosure INSERVICE INSPECTION DOCUMENT REQUEST
          associated corrective action documents.
  Inspection Dates: April 11 through April 22, 2011
    e)   A copy of (or ready access to) most current revision of the inservice inspection
          program manual and plan for the current Interval.
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities" TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"  Inspectors: Gerond George, Senior Reactor Inspector (Lead Inspector - ISI) James Adams, Reactor Inspector
    f)   For the nondestructive examinations selected by the inspectors from section A of
A. Information Requested for the In-Office Preparation Week
          this enclosure, provide a copy of the nondestructive examination procedures
The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com preferred), in care of Gerond George, by March 28, 2011, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.  The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure).  We ask that the specific items selected from the lists be available and ready for review on the first day of inspection.  Please provide requested documentation electronically if possible.  If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection.  If you have any questions regarding this information request, please call the inspector as soon as possible.
          used to perform the examinations (including calibration and flaw
A.1 ISI/Welding Programs and Schedule Information
          characterization/sizing procedures). For ultrasonic examination procedures
  a) A detailed schedule (including preliminary dates) of:
          qualified in accordance with ASME Section XI, Appendix VIII, provide
i)  Nondestructive examinations planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, risk informed (if
          documentation supporting the procedure qualification (e.g., the EPRI
applicable), and augmented inservice inspection programs during the upcoming outage
          performance demonstration qualification summary sheets). Also, include
Provide a status summary of the nondestructive examination inspection activities vs. the required inspection period percentages for this interval
          qualification documentation of the specific equipment to be used (e.g., ultrasonic
by category per ASME Section XI, IWX-2400. Do not provide separately if other documentation requested contains this information
          unit, cables, and transducers including serial numbers) and nondestructive
  ii) Reactor pressure vessel head examinations planned for the upcoming outage  iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope (If applicable)
          examination personnel qualification records.
iv) Examinations planned as part of your boric acid corrosion control program (Mode 3 walkdowns, bolted connection walkdowns, etc.) 
B.2 Reactor Pressure Vessel Head
   - 2 - Enclosure
    a)   Provide the nondestructive personnel qualification records for the examiners who
v) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components)
          will perform examinations of the reactor pressure vessel head.
b) A copy of ASME Section XI Code Relief Requests and associated NRC safety evaluations applicable to the examinations identified above. 
    b)   Provide drawings showing the following: (If a visual examination is planned for
  c) A list of nondestructive examination reports (ultrasonic, radiography, magnetic particle, dye penetrant, Visual VT-1, VT-2, and VT-3), which have identified
          the upcoming refueling outage)
relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage.  This should include the previous Section XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests.  Also, include in the list the nondestructive examination reports with relevant conditions in the reactor pressure vessel head penetration nozzles that have been accepted for continued service.  The list of nondestructive examination reports should include a brief description of the structures, systems,  
          i)       Reactor pressure vessel head and control rod drive mechanism nozzle
or components where the relevant condition was identified.  
                  configurations
d) A list with a brief description (e.g., system, material, pipe size, weld number, and nondestructive examinations performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement
          ii)     Reactor pressure vessel head insulation configuration
activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.  
                  Note: The drawings listed above should include fabrication drawings for
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to
                  the nozzle attachment welds as applicable.
be examined and the extent of the planned examination.  Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.  
    c)   Copy of nondestructive examination reports from the last reactor pressure vessel
f) Copy of any 10 CFR Part 21 reports applicable to your structures, systems, or components within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.  
          head examination.
g)  A list of any temporary noncode repairs in service (e.g., pinhole leaks).
    d)    Copy of evaluation or calculation demonstrating that the scope of the visual
h) Please provide copies of the most recent self-assessments for the inservice inspection, welding, and Alloy 600 programs.
          examination of the upper head will meet the 95 percent minimum coverage
A.2 Reactor Pressure Vessel Head  
          required by NRC Order EA-03-009 (If a visual examination is planned for the
  a) Provide the detailed scope of the planned nondestructive examinations of the reactor vessel head which identifies the types of nondestructive examination
          upcoming refueling outage).
methods to be used on each specific part of the vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009.  Also, include examination scope expansion criteria and 
                                      -6-                                         Enclosure
  - 3 - Enclosure planned expansion sample sizes if relevant conditions are identified. (If applicable)
b) A list of the standards and/or requirements that will be used to evaluate indications identified during nondestructive examination of the reactor vessel
head (e.g., the specific industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).
A.3 Boric Acid Corrosion Control Program
  a)  Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation.  If during the last cycle, the unit was shutdown, please provide
documentation of containment walkdown inspections performed as part of the boric acid corrosion control program.
c) Please provide a copy of the most recent self-assessment performed for the boric acid corrosion control program.
A.4 Steam Generator Tube Inspections
  a) A detailed schedule of:
i) Steam generator tube inspection, data analyses, and repair activities for the upcoming outage (If occurring)
ii) Steam generator secondary side inspection activities for the upcoming outage. (If occurring)
b) Please provide a copy of your steam generator inservice inspection program and plan.  Please include a copy of the operational assessment from last outage and a copy of the following documents as they become available: 
i) Degradation assessment ii) Condition monitoring assessment 
c) If you are planning on modifying your Technical Specifications such that they are consistent with Technical Specification Task Force Traveler TSTF-449, "Steam Generator Tube Integrity," please provide copies of your correspondence with the NRC regarding deviations from the standard technical specifications.  
d) Copy of steam generator history documentation given to vendors performing eddy current testing of the steam generators during the upcoming outage.
 
   - 4 - Enclosure e) Copy of steam generator eddy current data analyst guidelines and site validated eddy current technique specification sheets.  Additionally, please provide a copy of EPRI Appendix H, "Examination Technique Specification Sheets," qualification records.  f) Identify and quantify any steam generator tube leakage experienced during the previous operating cycle.  Also provide documentation identifying which steam generator was leaking and corrective actions completed or planned for this condition (If applicable).
g)  Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.)
h) Provide copies of your most recent self assessments of the steam generator monitoring, loose parts monitoring, and secondary side water chemistry control programs.
i) Indicate where the primary, secondary, and resolution analyses are scheduled to take place.
j) Provide a summary of the scope of the steam generator tube examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the percentage of tubes to be examined. Do not provide these documents separately if already included in other information requested.
  A.5 Additional Information Related to all Inservice Inspection Activities
  a)  A list with a brief description of inservice inspection, boric acid corrosion control program, and steam generator tube inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 2). For example, a list based upon data base
searches using key words related to piping or steam generator tube degradation such as: inservice inspection, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/steam generator tube examinations.
b)  Please provide names and phone numbers for the following program leads:
Inservice inspection (examination, planning) Containment exams Reactor pressure vessel head exams Snubbers and supports Repair and replacement program 
Licensing  Site welding engineer Boric acid corrosion control program Steam generator inspection activities (site lead and vendor contact) 
  - 5 - Enclosure B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 11, 2011):
B.1 Inservice Inspection / Welding Programs and Schedule Information
  a) Updated schedules for inservice inspection/nondestructive examination activities, including steam generator tube inspections, planned welding activities, and schedule showing contingency repair plans, if available.
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:
i) Weld data sheet (traveler)
ii) Weld configuration and system location
iii) Applicable Code Edition and Addenda for weldment
iv) Applicable Code Edition and Addenda for welding procedures
v) Applicable weld procedures used to fabricate the welds


vi) Copies of procedure qualification records supporting the weld procedures from B.1.b.v
    e)     Provide a copy of the procedures that will be used to identify the source of any
vii) Copies of mechanical test reports identified in the procedure qualification records above
          boric acid deposits identified on the reactor pressure vessel head. If no explicit
viii) Copies of the nonconformance reports for the selected welds (If applicable)
          procedures exist which govern this activity, provide a description of the process
          to be followed including personnel responsibilities and expectations.
ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If radiographic testing was performed)
    f)     Provide a copy of the updated calculation of effective degradation years for the
x) Copies of the preservice examination records for the selected welds
          reactor pressure vessel head susceptibility ranking.
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained proficiency in the applicable welding processes specified in the weld procedures (at least 6 months prior to the date of subject work)
          capability of the nondestructive examination equipment used for the reactor
xii) Copies of nondestructive examination personnel qualifications (Visual inspection, penetrant testing, ultrasonic testing, radiographic testing), as
          pressure vessel head examinations. Also, identify any changes in equipment
applicable
          configurations used for the reactor pressure vessel head examinations which
 
          differ from that used in the vendor qualification report(s).
  - 6 - Enclosure c) For the inservice inspection related corrective action issues selected by the inspectors from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
B.3 Boric Acid Corrosion Control Program
d) For the nondestructive examination reports with relevant conditions on Code Class 1 and 2 systems selected by the inspectors from Section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
e) A copy of (or ready access to) most current revision of the inservice inspection program manual and plan for the current Interval. 
          acid leaks identified so far this outage, associated corrective action
f) For the nondestructive examinations selected by the inspectors from section A of this enclosure, provide a copy of the nondestructive examination procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures).  For ultrasonic examination procedures qualified in accordance with ASME Section XI, Appendix VIII, provide
          documentation, and overall status of planned boric acid inspections.
documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).  Also, include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and nondestructive examination personnel qualification records.
    b)     Please provide any engineering evaluations completed for boric acid leaks
B.2 Reactor Pressure Vessel Head
          identified since the end of the last refueling outage. Please include a status of
  a) Provide the nondestructive personnel qualification records for the examiners who will perform examinations of the reactor pressure vessel head. 
          corrective actions to repair and/or clean these boric acid leaks. Please identify
b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage)
          specifically which known leaks, if any, have remained in service or will remain in
i) Reactor pressure vessel head and control rod drive mechanism nozzle configurations 
          service as active leaks.
ii) Reactor pressure vessel head insulation configuration 
B.4 Steam Generator Tube Inspections
Note: The drawings listed above should include fabrication drawings for
    a)     Copies of the Examination Technique Specification Sheets and associated
the nozzle attachment welds as applicable. 
          justification for any revisions.
c) Copy of nondestructive examination reports from the last reactor pressure vessel head examination.
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95 percent minimum coverage
          in the steam generators.
required by NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).
    c)     Please provide a copy of the eddy current testing procedures used to perform the
 
          steam generator tube inspections (specifically calibration and flaw
  - 7 - Enclosure e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the reactor pressure vessel head. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations.
          characterization/sizing procedures, etc.). Also include documentation for the
          specific equipment to be used.
f) Provide a copy of the updated calculation of effective degradation years for the reactor pressure vessel head susceptibility ranking.  
    d)     Please provide copies of your responses to NRC and industry operating
g) Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the nondestructive examination equipment used for the reactor  
          experience communications such as Generic Letters, Information Notices, etc.
pressure vessel head examinations. Also, identify any changes in equipment configurations used for the reactor pressure vessel head examinations which differ from that used in the vendor qualification report(s).  
          (as applicable to steam generator tube inspections) Do not provide these
B.3 Boric Acid Corrosion Control Program  
          documents separately if already included in other information requested such as
  a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action documentation, and overall status of planned boric acid inspections.  
          the degradation assessment.
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of  
    e)     List of corrective action documents generated by the vendor and/or site with
corrective actions to repair and/or clean these boric acid leaks. Please identify specifically which known leaks, if any, have remained in service or will remain in service as active leaks.
          respect to steam generator inspection activities.
B.4 Steam Generator Tube Inspections
                                        -7-                                       Enclosure
  a) Copies of the Examination Technique Specification Sheets and associated justification for any revisions.  
 
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the steam generators.  
B.5     Codes and Standards
c) Please provide a copy of the eddy current testing procedures used to perform the steam generator tube inspections (specifically calibration and flaw characterization/sizing procedures, etc.). Also include documentation for the  
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
specific equipment to be used.  
              inspection at the onsite inspection location, or room number and location where
d) Please provide copies of your responses to NRC and industry operating experience communications such as Generic Letters, Information Notices, etc. (as applicable to steam generator tube inspections) Do not provide these documents separately if already included in other information requested such as the degradation assessment.
              available):
  e) List of corrective action documents generated by the vendor and/or site with respect to steam generator inspection activities.  
              i)     Applicable Editions of the ASME Code (Sections V, IX, and XI) for the
 
                      inservice inspection program and the repair/replacement program.
  - 8 - Enclosure B.5 Codes and Standards
              ii)     EPRI and industry standards referenced in the procedures used to
  a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where available):  
                      perform the steam generator tube eddy current examination.
i) Applicable Editions of the ASME Code (Sections V, IX, and XI) for the inservice inspection program and the repair/replacement program.
Inspector Contact Information:
ii) EPRI and industry standards referenced in the procedures used to perform the steam generator tube eddy current examination.  
Gerond George                 James Adams
  Inspector Contact Information:  
Reactor Inspector             Reactor Inspector
Gerond George James Adams     Reactor Inspector Reactor Inspector  
817-276-6562                   817-860-8294
817-276-6562   817-860-8294   gerond.george@nrc.gov james.adams@nrc.gov    
gerond.george@nrc.gov         james.adams@nrc.gov
Mailing Address: US NRC Region IV  
Mailing Address:
Attn: Gerond George 612 E. Lamar Blvd, Suite 400 Arlington, TX 76011
US NRC Region IV
Attn: Gerond George
612 E. Lamar Blvd, Suite 400
Arlington, TX 76011
                                            -8-                                      Enclosure
}}
}}

Revision as of 02:42, 13 November 2019

Notification of Inspection (IR 0500529-11-003, on 04/11/11 - 0122/2011) and Request for Information
ML110600860
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/01/2011
From: Greg Werner
NRC/RGN-IV/DRS/PSB-2
To: Edington R
Arizona Public Service Co
References
Download: ML110600860 (13)


See also: IR 05000529/2011003

Text

UNITED STATES

NUC LE AR RE G ULATO RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

March 1, 2011

Randall K. Edington, Executive

Vice President, Nuclear/CNO

Arizona Public Service Company

P.O. Box 52034, Mail Stop 7602

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION UNIT2- NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000529/2011003) AND

REQUEST FOR INFORMATION

Dear Mr. Edington:

From April 11-22, 2011, reactor inspectors from the Nuclear Regulatory Commissions (NRC)

Region IV office will perform the baseline inservice inspection at Palo Verde Nuclear Generating

Station Unit 2, using NRC Inspection Procedure 71111.08, Inservice Inspection Activities.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into two groups. The first group (Section A of

the enclosure), due by March 28, 2011, identifies information to be provided prior to the

inspection to ensure that the inspectors are adequately prepared. The second group (Section B

of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Del Elkington of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact Gerond George at (817) 276-6562 (gerond.george@nrc.gov) or James Adams at

(817) 860-8294 (james.adams@nrc.gov).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Arizona Public Service Company -2-

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Gregory E. Werner, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket: 50-529

License: NPF-51

Enclosure:

Inservice Inspection Document Request

cc w/enclosure:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, AZ 85007

Mr. Douglas K. Porter, Esq

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, AZ 85003

Mr. Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, AZ 85040

Mr. Dwight C. Mims

Vice President

Regulatory Affairs and Plant Improvement

Palo Verde Nuclear Generating Station

Mail Station 7605

P.O. Box 52034

Phoenix, AZ 85072-2034

Arizona Public Service Company -3-

Mr. Ron Barnes, Director

Regulatory Affairs

Palo Verde Nuclear Generating Station

MS 7638

P.O. Box 52034

Phoenix, AZ 85072-2034

Mr. Jeffrey T. Weikert

Assistant General Counsel

El Paso Electric Company

Mail Location 167

123 W. Mills

El Paso, TX 79901

Michael S. Green

Senior Regulatory Counsel

Pinnacle West Capital Corporation

P.O. Box 52034, MS 8695

Phoenix, AZ 85072-2034

Mr. Eric Tharp

Los Angeles Department of Water & Power

Southern California Public Power Authority

P.O. Box 51111, Room 1255-C

Los Angeles, CA 90051-0100

Mr. James Ray

Public Service Company of New Mexico

2401 Aztec NE, MS Z110

Albuquerque, NM 87107-4224

Mr. Geoffrey M. Cook

Southern California Edison Company

5000 Pacific Coast Hwy. Bldg. D21

San Clemente, CA 92672

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale, AZ 85251

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

Austin, TX 78701-3326

Arizona Public Service Company -4-

Environmental Program Manager

City of Phoenix

Office of Environmental Programs

200 West Washington Street

Phoenix, AZ 85003

Mr. John C. Taylor

Director, Nuclear Generation

El Paso Electric Company

340 East Palm Lane, Suite 310

Phoenix, AZ 85004

Chief, Technological Hazards

Branch

FEMA Region IX

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Jake Lefman

Southern California Edison Company

5000 Pacific Coast Hwy, Bldg. D21

San Clemente, CA 92672

Arizona Public Service Company -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Art.Howell@nrc.gov )

DRP Director (Kriss.Kennedy@nrc.gov )

DRP Deputy Director (Troy.Pruett@nrc.gov )

DRS Director (Anton.Vegel@nrc.gov )

DRS Deputy Director (Vacant)

Senior Resident Inspector (Tony.Brown@nrc.gov )

Resident Inspector (Joseph.Bashore@nrc.gov )

Resident Inspector (Mica.Baquera@nrc.gov )

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov )

PV Administrative Assistant (Regina.McFadden@nrc.gov )

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )

Project Engineer, DRP/D (Peter.Jayroe@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Public Affairs Officer (Lara.Uselding@nrc.gov )

Project Manager (Randy.Hall@nrc.gov )

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource

Inspection Reports/MidCycle and EOC Letters to the following:

ROPreports

R:\ ADAMS ML

ADAMS: No 7 Yes 7 SUNSI Review Complete Reviewer Initials: GAG

7 Publicly Available 7 Non-Sensitive

Non-publicly Available Sensitive

SRI:EB1 C:PSB2

GAGeorge GEWerner

Via E-Mail - /RA/ /RA/

02/23/2011 02/28/2011

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: April 11 through April 22, 2011

Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities"

TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"

Inspectors: Gerond George, Senior Reactor Inspector (Lead Inspector - ISI)

James Adams, Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Gerond George, by March 28,

2011, to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspectors will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (Section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and

provide subject documentation during the first day of the onsite inspection. If you have

any questions regarding this information request, please call the inspector as soon as

possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations planned for Class 1 & 2 systems and

containment, performed as part of your ASME Section XI, risk informed (if

applicable), and augmented inservice inspection programs during the

upcoming outage

Provide a status summary of the nondestructive examination inspection

activities vs. the required inspection period percentages for this interval

by category per ASME Section XI, IWX-2400. Do not provide separately

if other documentation requested contains this information

ii) Reactor pressure vessel head examinations planned for the upcoming

outage

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope (If applicable)

iv) Examinations planned as part of your boric acid corrosion control

program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

-1- Enclosure

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components)

b) A copy of ASME Section XI Code Relief Requests and associated NRC safety

evaluations applicable to the examinations identified above.

c) A list of nondestructive examination reports (ultrasonic, radiography, magnetic

particle, dye penetrant, Visual VT-1, VT-2, and VT-3), which have identified

relevant conditions on Code Class 1 & 2 systems since the beginning of the last

refueling outage. This should include the previousSection XI pressure test(s)

conducted during start up and any evaluations associated with the results of the

pressure tests. Also, include in the list the nondestructive examination reports

with relevant conditions in the reactor pressure vessel head penetration nozzles

that have been accepted for continued service. The list of nondestructive

examination reports should include a brief description of the structures, systems,

or components where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

nondestructive examinations performed) of the welds in Code Class 1 and 2

systems which have been fabricated due to component repair/replacement

activities since the beginning of the last refueling outage, or are planned to be

fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your structures, systems, or

components within the scope of Section XI of the ASME Code that have been

identified since the beginning of the last refueling outage.

g) A list of any temporary noncode repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self-assessments for the inservice

inspection, welding, and Alloy 600 programs.

A.2 Reactor Pressure Vessel Head

a) Provide the detailed scope of the planned nondestructive examinations of the

reactor vessel head which identifies the types of nondestructive examination

methods to be used on each specific part of the vessel head to fulfill

commitments made in response to NRC Bulletin 2002-02 and

NRC Order EA-03-009. Also, include examination scope expansion criteria and

-2- Enclosure

planned expansion sample sizes if relevant conditions are identified. (If

applicable)

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during nondestructive examination of the reactor vessel

head (e.g., the specific industry or procedural standards which will be used to

evaluate potential leakage and/or flaw indications).

A.3 Boric Acid Corrosion Control Program

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

boric acid corrosion control program.

c) Please provide a copy of the most recent self-assessment performed for the

boric acid corrosion control program.

A.4 Steam Generator Tube Inspections

a) A detailed schedule of:

i) Steam generator tube inspection, data analyses, and repair activities for

the upcoming outage (If occurring)

ii) Steam generator secondary side inspection activities for the upcoming

outage. (If occurring)

b) Please provide a copy of your steam generator inservice inspection program and

plan. Please include a copy of the operational assessment from last outage and

a copy of the following documents as they become available:

i) Degradation assessment

ii) Condition monitoring assessment

c) If you are planning on modifying your Technical Specifications such that they are

consistent with Technical Specification Task Force Traveler TSTF-449, Steam

Generator Tube Integrity, please provide copies of your correspondence with the

NRC regarding deviations from the standard technical specifications.

d) Copy of steam generator history documentation given to vendors performing

eddy current testing of the steam generators during the upcoming outage.

-3- Enclosure

e) Copy of steam generator eddy current data analyst guidelines and site validated

eddy current technique specification sheets. Additionally, please provide a copy

of EPRI Appendix H, Examination Technique Specification Sheets, qualification

records.

f) Identify and quantify any steam generator tube leakage experienced during the

previous operating cycle. Also provide documentation identifying which steam

generator was leaking and corrective actions completed or planned for this

condition (If applicable).

g) Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h) Provide copies of your most recent self assessments of the steam generator

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i) Indicate where the primary, secondary, and resolution analyses are scheduled to

take place.

j) Provide a summary of the scope of the steam generator tube examinations,

including examination methods such as Bobbin, Rotating Pancake, or Plus Point,

and the percentage of tubes to be examined. Do not provide these documents

separately if already included in other information requested.

A.5 Additional Information Related to all Inservice Inspection Activities

a) A list with a brief description of inservice inspection, boric acid corrosion control

program, and steam generator tube inspection related issues (e.g., condition

reports) entered into your corrective action program since the beginning of the

last refueling outage (for Unit 2). For example, a list based upon data base

searches using key words related to piping or steam generator tube degradation

such as: inservice inspection, ASME Code,Section XI, NDE, cracks, wear,

thinning, leakage, rust, corrosion, boric acid, or errors in piping/steam generator

tube examinations.

b) Please provide names and phone numbers for the following program leads:

Inservice inspection (examination, planning)

Containment exams

Reactor pressure vessel head exams

Snubbers and supports

Repair and replacement program

Licensing

Site welding engineer

Boric acid corrosion control program

Steam generator inspection activities (site lead and vendor contact)

-4- Enclosure

B. Information to be provided onsite to the inspector(s) at the entrance meeting (April

11, 2011):

B.1 Inservice Inspection / Welding Programs and Schedule Information

a) Updated schedules for inservice inspection/nondestructive examination activities,

including steam generator tube inspections, planned welding activities, and

schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures used to fabricate the welds

vi) Copies of procedure qualification records supporting the weld procedures

from B.1.b.v

vii) Copies of mechanical test reports identified in the procedure qualification

records above

viii) Copies of the nonconformance reports for the selected welds (If

applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If radiographic testing was performed)

x) Copies of the preservice examination records for the selected welds

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the weld

procedures (at least 6 months prior to the date of subject work)

xii) Copies of nondestructive examination personnel qualifications (Visual

inspection, penetrant testing, ultrasonic testing, radiographic testing), as

applicable

-5- Enclosure

c) For the inservice inspection related corrective action issues selected by the

inspectors from section A of this enclosure, provide a copy of the corrective

actions and supporting documentation.

d) For the nondestructive examination reports with relevant conditions on Code

Class 1 and 2 systems selected by the inspectors from Section A above, provide

a copy of the examination records, examiner qualification records, and

associated corrective action documents.

e) A copy of (or ready access to) most current revision of the inservice inspection

program manual and plan for the current Interval.

f) For the nondestructive examinations selected by the inspectors from section A of

this enclosure, provide a copy of the nondestructive examination procedures

used to perform the examinations (including calibration and flaw

characterization/sizing procedures). For ultrasonic examination procedures

qualified in accordance with ASME Section XI, Appendix VIII, provide

documentation supporting the procedure qualification (e.g., the EPRI

performance demonstration qualification summary sheets). Also, include

qualification documentation of the specific equipment to be used (e.g., ultrasonic

unit, cables, and transducers including serial numbers) and nondestructive

examination personnel qualification records.

B.2 Reactor Pressure Vessel Head

a) Provide the nondestructive personnel qualification records for the examiners who

will perform examinations of the reactor pressure vessel head.

b) Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i) Reactor pressure vessel head and control rod drive mechanism nozzle

configurations

ii) Reactor pressure vessel head insulation configuration

Note: The drawings listed above should include fabrication drawings for

the nozzle attachment welds as applicable.

c) Copy of nondestructive examination reports from the last reactor pressure vessel

head examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95 percent minimum coverage

required by NRC Order EA-03-009 (If a visual examination is planned for the

upcoming refueling outage).

-6- Enclosure

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the reactor pressure vessel head. If no explicit

procedures exist which govern this activity, provide a description of the process

to be followed including personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years for the

reactor pressure vessel head susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the nondestructive examination equipment used for the reactor

pressure vessel head examinations. Also, identify any changes in equipment

configurations used for the reactor pressure vessel head examinations which

differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program

a) Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Steam Generator Tube Inspections

a) Copies of the Examination Technique Specification Sheets and associated

justification for any revisions.

b) Copy of the guidance to be followed if a loose part or foreign material is identified

in the steam generators.

c) Please provide a copy of the eddy current testing procedures used to perform the

steam generator tube inspections (specifically calibration and flaw

characterization/sizing procedures, etc.). Also include documentation for the

specific equipment to be used.

d) Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to steam generator tube inspections) Do not provide these

documents separately if already included in other information requested such as

the degradation assessment.

e) List of corrective action documents generated by the vendor and/or site with

respect to steam generator inspection activities.

-7- Enclosure

B.5 Codes and Standards

a) Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i) Applicable Editions of the ASME Code (Sections V, IX, and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the steam generator tube eddy current examination.

Inspector Contact Information:

Gerond George James Adams

Reactor Inspector Reactor Inspector

817-276-6562 817-860-8294

gerond.george@nrc.gov james.adams@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Gerond George

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011

-8- Enclosure