ML11305A083: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 11/01/2011
| issue date = 11/01/2011
| title = Fenoc'S Unopposed Motion for Modification of Paragraph A.2 of the Board'S Initial Scheduling Order
| title = Fenoc'S Unopposed Motion for Modification of Paragraph A.2 of the Board'S Initial Scheduling Order
| author name = Polonsky A S
| author name = Polonsky A
| author affiliation = First Energy Services, Inc, Morgan, Lewis & Bockius, LLP
| author affiliation = First Energy Services, Inc, Morgan, Lewis & Bockius, LLP
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:DB1/ 68381090 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
                          ) In the Matter of       )  
                                                                )
        ) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )
In the Matter of                                               )
        )
                                                                )     Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY                           )
(Davis-Besse Nuclear Power Station, Unit 1)   ) November 1, 2011  
                                                                )
                  )
(Davis-Besse Nuclear Power Station, Unit 1)                     )     November 1, 2011
FENOC'S UNOPPOSED MOTION FOR MODIFICATION OF PARAGRAPH A.2. OF THE BOARD'S INITIAL SCHEDULING ORDER In accordance with 10 C.F.R. § 2.323(a), FirstEnergy Nuclear Operating Company ("FirstEnergy" or "FENOC") files this motion requesting that the Board modify the requirement regarding updates to mandatory disclosures so that they are now due at the end of each month instead of by the 15th of each month. In paragraph A.2. of the Board's June 15, 2011 Initial Scheduling Order, "the Board directs that updates to mandatory disclosures and to the NRC Staff's hearing file shall be filed no later than the 15th of every month, commencing the calendar month after initial disclosures, and shall cover all documents or other material or information required to be disclosed that are in the possession, custody, or control of each party (or its agents) as of the last day of the preceding month."    FENOC requests that the Board modify this requirement such that each party would file its monthly updates to mandatory disclosures "no la ter than the last calendar day of each month
                                                                )
," commencing the calendar month after initial disclosures, and covering all documents or other material or information required to be disclosed that are in the possession, custody, or control of DB1/ 68381090 2each party (or its agents) as of the last day of the preceding month.
FENOCS UNOPPOSED MOTION FOR MODIFICATION OF PARAGRAPH A.2. OF THE BOARDS INITIAL SCHEDULING ORDER In accordance with 10 C.F.R. § 2.323(a), FirstEnergy Nuclear Operating Company (FirstEnergy or FENOC) files this motion requesting that the Board modify the requirement regarding updates to mandatory disclosures so that they are now due at the end of each month instead of by the 15th of each month. In paragraph A.2. of the Boards June 15, 2011 Initial Scheduling Order, the Board directs that updates to mandatory disclosures and to the NRC Staffs hearing file shall be filed no later than the 15th of every month, commencing the calendar month after initial disclosures, and shall cover all documents or other material or information required to be disclosed that are in the possession, custody, or control of each party (or its agents) as of the last day of the preceding month.
1  In essence, the modification that FENOC is requesting is a full calendar m onth to produce the updates rather than the 15 calendar days currently required under the Initial Scheduling Order. The remainder of the monthly update requirements would not change. Counsel for FENOC has consulted with Brian Harris (for the NRC St aff) and with Terry Lodge (for Joint Petitioners). They do not oppose this Motion, and would want the relief granted to them as well. Also, if the Board grants this Motion, the Staff would want the Board to modify paragraph F.2. of the Initial Scheduling Order so that the Staff's requirement to submit a monthly status report for the schedule for the draft and final versions of the SER and SEIS is made concurrent with the monthly updates at the end of each month, instead of the 15th of each month. Under 10 C.F.R. § 2.334(b), a hearing schedule may be modified for "good cause."  The Board can find good cause supporting this Motion because:
FENOC requests that the Board modify this requirement such that each party would file its monthly updates to mandatory disclosures no later than the last calendar day of each month, commencing the calendar month after initial disclosures, and covering all documents or other material or information required to be disclosed that are in the possession, custody, or control of DB1/ 68381090
: 1. FENOC has identified more than 50 Custodians from whom potentially-relevant electronic and hard copy documents would need to be evaluated for the monthly updates of FENOC's document disclo sures for Contentions 1 and 4;
: 2. FENOC also identified seve n different corporate sources of records which require different Information Technology leads to retrieve and which generate multiple electronic formats of documents, in six di fferent locations, from which potentially-relevant documents would need to be re trieved and evaluated for these monthly updates; 3. FENOC also identified at least one off-site contractor from whom potentially-relevant documents would need to be retrieved and evaluated for these monthly updates;


1 If the last calendar day of the month falls on a weekend or a holiday observed by the NRC, then the disclosure updates would be due on the next day that is not a weekend or holiday.
each party (or its agents) as of the last day of the preceding month.1 In essence, the modification that FENOC is requesting is a full calendar month to produce the updates rather than the 15 calendar days currently required under the Initial Scheduling Order. The remainder of the monthly update requirements would not change.
DB1/ 68381090 3 4. Fully aware of the Board's 15-day requirement, FENOC recently performed a "dry-run" of a monthly update to its mandatory disclosures in an attempt to assess how long it would take to identify, collect, a nd review potentially-relevant documents from the sources listed above in paragraphs 2 through 4, on a monthly basis;
Counsel for FENOC has consulted with Brian Harris (for the NRC Staff) and with Terry Lodge (for Joint Petitioners). They do not oppose this Motion, and would want the relief granted to them as well. Also, if the Board grants this Motion, the Staff would want the Board to modify paragraph F.2. of the Initial Scheduling Order so that the Staffs requirement to submit a monthly status report for the schedule for the draft and final versions of the SER and SEIS is made concurrent with the monthly updates at the end of each month, instead of the 15th of each month.
: 5. During this "dry-run" it became apparent that FENOC cannot reasonably meet the 15-day turnaround required by para graph A.2. of the Initial Sc heduling Order. Rather, a full calendar month is necessary for FENOC to meet its obligations to update the mandatory disclosures;
Under 10 C.F.R. § 2.334(b), a hearing schedule may be modified for good cause. The Board can find good cause supporting this Motion because:
: 1. FENOC has identified more than 50 Custodians from whom potentially-relevant electronic and hard copy documents would need to be evaluated for the monthly updates of FENOCs document disclosures for Contentions 1 and 4;
: 2. FENOC also identified seven different corporate sources of records which require different Information Technology leads to retrieve and which generate multiple electronic formats of documents, in six different locations, from which potentially-relevant documents would need to be retrieved and evaluated for these monthly updates;
: 3. FENOC also identified at least one off-site contractor from whom potentially-relevant documents would need to be retrieved and evaluated for these monthly updates; 1
If the last calendar day of the month falls on a weekend or a holiday observed by the NRC, then the disclosure updates would be due on the next day that is not a weekend or holiday.
DB1/ 68381090 2
: 4. Fully aware of the Boards 15-day requirement, FENOC recently performed a dry-run of a monthly update to its mandatory disclosures in an attempt to assess how long it would take to identify, collect, and review potentially-relevant documents from the sources listed above in paragraphs 2 through 4, on a monthly basis;
: 5. During this dry-run it became apparent that FENOC cannot reasonably meet the 15-day turnaround required by paragraph A.2. of the Initial Scheduling Order. Rather, a full calendar month is necessary for FENOC to meet its obligations to update the mandatory disclosures;
: 6. Granting the motion maintains the requirement for each party to provide a monthly update to mandatory disclosures; and
: 6. Granting the motion maintains the requirement for each party to provide a monthly update to mandatory disclosures; and
: 7. Neither the NRC Staff nor the Joint Petitioners oppose the motion.
: 7. Neither the NRC Staff nor the Joint Petitioners oppose the motion.
DB1/ 68381090 4 For the foregoing reasons, the Board should grant this unopposed motion.
DB1/ 68381090 3
Respectfully submitted,  Signed (electronically) by Alex S. Polonsky Kathryn M. Sutton Alex S. Polonsky Martin J. O'Neill
 
Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
 
Washington, DC 20004
 
Phone:  202-739-5830
 
Fax: 202-739-3001 E-mail:  apolonsky@morganlewis.com
 
David W. Jenkins
 
Senior Corporate Counsel
 
FirstEnergy Service Company Mailstop: A-GO-15
 
76 South Main Street
 
Akron, OH 44308
 
Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FENOC Dated in Washington, D.C. this 1st day of November 2011 DB1/ 68381090 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD                          ) In the Matter of        )
        ) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY ) 
        )
(Davis-Besse Nuclear Power Station, Unit 1)    ) November 1, 2011
                  )  CERTIFICATE OF SERVICE
 
I hereby certify that, on this date , a copy of "FENOC'S UNOPPOSED MOTION FOR MODIFICATION OF PARAGRAPH A.2. OF THE BOARD'S INITIAL SCHEDULING ORDER" was filed with the Electronic Informati on Exchange in the above-captioned proceeding on the following recipients. Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 E-mail: wjf1@nrc.gov
 
Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Panel
 
U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 E-mail: wek1@nrc.gov
 
Office of the Secretary
 
U.S. Nuclear Regulatory Commission Rulemakings and Adjudications Staff
 
Washington, DC  20555-0001 E-mail: hearingdocket@nrc.gov
 
Administrative Judge
 
Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 E-mail: nicholas.trikouros@nrc.gov
 
Office of the General Counsel 
 
U.S. Nuclear Regulatory Commission Mail Stop O-15D21
 
Washington, DC  20555-0001
 
Brian G. Harris Megan Wright Emily L. Monteith E-mail: Brian.Harris@nrc.gov; Megan.Wright@nrc.gov; Emily.Monteith@nrc.gov
 
DB1/ 68381090 2
Office of Commission Appellate Adjudication
 
U.S. Nuclear Regulatory Commission Mail Stop: O-16C1
 
Washington, DC  20555-0001 E-mail: ocaamail@nrc.gov
 
Kevin Kamps
 
Paul Gunter
 
Beyond Nuclear
 
6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org;
 
paul@beyondnuclear.org
 
Michael Keegan Don't Waste Michigan
 
811 Harrison Street
 
Monroe, MI 48161 E-mail: mkeeganj@comcast.net 
 
Terry J. Lodge
 
316 N. Michigan St., Ste. 520
 
Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Alex S. Polonsky Kathryn M. Sutton Alex S. Polonsky Martin J. O'Neill
 
Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
Washington, DC 20004


Phone: 202-739-3000
For the foregoing reasons, the Board should grant this unopposed motion.
Respectfully submitted, Signed (electronically) by Alex S. Polonsky Kathryn M. Sutton Alex S. Polonsky Martin J. ONeill Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
Washington, DC 20004 Phone: 202-739-5830 Fax: 202-739-3001 E-mail: apolonsky@morganlewis.com David W. Jenkins Senior Corporate Counsel FirstEnergy Service Company Mailstop: A-GO-15 76 South Main Street Akron, OH 44308 Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FENOC Dated in Washington, D.C.
this 1st day of November 2011 DB1/ 68381090 4


Fax: 202-739-3001  E-mail: aspolonsky@morganlewis.com
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD
                                                            )
In the Matter of                                            )
                                                            )      Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY                      )
                                                            )
(Davis-Besse Nuclear Power Station, Unit 1)                )      November 1, 2011
                                                            )
CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of FENOCS UNOPPOSED MOTION FOR MODIFICATION OF PARAGRAPH A.2. OF THE BOARDS INITIAL SCHEDULING ORDER was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients.
Administrative Judge                                  Administrative Judge William J. Froehlich, Chair                          Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel              Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission                    U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                            Washington, DC 20555-0001 E-mail: wjf1@nrc.gov                                  E-mail: nicholas.trikouros@nrc.gov Administrative Judge                                  Office of the General Counsel Dr. William E. Kastenberg                            U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel              Mail Stop O-15D21 U.S. Nuclear Regulatory Commission                    Washington, DC 20555-0001 Washington, DC 20555-0001                            Brian G. Harris E-mail: wek1@nrc.gov                                  Megan Wright Emily L. Monteith E-mail: Brian.Harris@nrc.gov; Office of the Secretary                              Megan.Wright@nrc.gov; U.S. Nuclear Regulatory Commission                    Emily.Monteith@nrc.gov Rulemakings and Adjudications Staff Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov DB1/ 68381090


COUNSEL FOR FENOC}}
Office of Commission Appellate Adjudication      Michael Keegan U.S. Nuclear Regulatory Commission                Dont Waste Michigan Mail Stop: O-16C1                                811 Harrison Street Washington, DC 20555-0001                        Monroe, MI 48161 E-mail: ocaamail@nrc.gov                          E-mail: mkeeganj@comcast.net Kevin Kamps                                      Terry J. Lodge Paul Gunter                                      316 N. Michigan St., Ste. 520 Beyond Nuclear                                    Toledo, OH 43604 6930 Carroll Avenue, Suite 400                    E-mail: tjlodge50@yahoo.com Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org; paul@beyondnuclear.org Signed (electronically) by Alex S. Polonsky Kathryn M. Sutton Alex S. Polonsky Martin J. ONeill Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
Washington, DC 20004 Phone: 202-739-3000 Fax: 202-739-3001 E-mail: aspolonsky@morganlewis.com COUNSEL FOR FENOC DB1/ 68381090                                2}}

Latest revision as of 13:39, 12 November 2019

Fenoc'S Unopposed Motion for Modification of Paragraph A.2 of the Board'S Initial Scheduling Order
ML11305A083
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/01/2011
From: Polonsky A
First Energy Services, Morgan, Morgan, Lewis & Bockius, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21333, 50-346-LR, ASLBP 11-907-01-LR-BD01
Download: ML11305A083 (6)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) November 1, 2011

)

FENOCS UNOPPOSED MOTION FOR MODIFICATION OF PARAGRAPH A.2. OF THE BOARDS INITIAL SCHEDULING ORDER In accordance with 10 C.F.R. § 2.323(a), FirstEnergy Nuclear Operating Company (FirstEnergy or FENOC) files this motion requesting that the Board modify the requirement regarding updates to mandatory disclosures so that they are now due at the end of each month instead of by the 15th of each month. In paragraph A.2. of the Boards June 15, 2011 Initial Scheduling Order, the Board directs that updates to mandatory disclosures and to the NRC Staffs hearing file shall be filed no later than the 15th of every month, commencing the calendar month after initial disclosures, and shall cover all documents or other material or information required to be disclosed that are in the possession, custody, or control of each party (or its agents) as of the last day of the preceding month.

FENOC requests that the Board modify this requirement such that each party would file its monthly updates to mandatory disclosures no later than the last calendar day of each month, commencing the calendar month after initial disclosures, and covering all documents or other material or information required to be disclosed that are in the possession, custody, or control of DB1/ 68381090

each party (or its agents) as of the last day of the preceding month.1 In essence, the modification that FENOC is requesting is a full calendar month to produce the updates rather than the 15 calendar days currently required under the Initial Scheduling Order. The remainder of the monthly update requirements would not change.

Counsel for FENOC has consulted with Brian Harris (for the NRC Staff) and with Terry Lodge (for Joint Petitioners). They do not oppose this Motion, and would want the relief granted to them as well. Also, if the Board grants this Motion, the Staff would want the Board to modify paragraph F.2. of the Initial Scheduling Order so that the Staffs requirement to submit a monthly status report for the schedule for the draft and final versions of the SER and SEIS is made concurrent with the monthly updates at the end of each month, instead of the 15th of each month.

Under 10 C.F.R. § 2.334(b), a hearing schedule may be modified for good cause. The Board can find good cause supporting this Motion because:

1. FENOC has identified more than 50 Custodians from whom potentially-relevant electronic and hard copy documents would need to be evaluated for the monthly updates of FENOCs document disclosures for Contentions 1 and 4;
2. FENOC also identified seven different corporate sources of records which require different Information Technology leads to retrieve and which generate multiple electronic formats of documents, in six different locations, from which potentially-relevant documents would need to be retrieved and evaluated for these monthly updates;
3. FENOC also identified at least one off-site contractor from whom potentially-relevant documents would need to be retrieved and evaluated for these monthly updates; 1

If the last calendar day of the month falls on a weekend or a holiday observed by the NRC, then the disclosure updates would be due on the next day that is not a weekend or holiday.

DB1/ 68381090 2

4. Fully aware of the Boards 15-day requirement, FENOC recently performed a dry-run of a monthly update to its mandatory disclosures in an attempt to assess how long it would take to identify, collect, and review potentially-relevant documents from the sources listed above in paragraphs 2 through 4, on a monthly basis;
5. During this dry-run it became apparent that FENOC cannot reasonably meet the 15-day turnaround required by paragraph A.2. of the Initial Scheduling Order. Rather, a full calendar month is necessary for FENOC to meet its obligations to update the mandatory disclosures;
6. Granting the motion maintains the requirement for each party to provide a monthly update to mandatory disclosures; and
7. Neither the NRC Staff nor the Joint Petitioners oppose the motion.

DB1/ 68381090 3

For the foregoing reasons, the Board should grant this unopposed motion.

Respectfully submitted, Signed (electronically) by Alex S. Polonsky Kathryn M. Sutton Alex S. Polonsky Martin J. ONeill Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: 202-739-5830 Fax: 202-739-3001 E-mail: apolonsky@morganlewis.com David W. Jenkins Senior Corporate Counsel FirstEnergy Service Company Mailstop: A-GO-15 76 South Main Street Akron, OH 44308 Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FENOC Dated in Washington, D.C.

this 1st day of November 2011 DB1/ 68381090 4

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) November 1, 2011

)

CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of FENOCS UNOPPOSED MOTION FOR MODIFICATION OF PARAGRAPH A.2. OF THE BOARDS INITIAL SCHEDULING ORDER was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients.

Administrative Judge Administrative Judge William J. Froehlich, Chair Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: wjf1@nrc.gov E-mail: nicholas.trikouros@nrc.gov Administrative Judge Office of the General Counsel Dr. William E. Kastenberg U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Mail Stop O-15D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Brian G. Harris E-mail: wek1@nrc.gov Megan Wright Emily L. Monteith E-mail: Brian.Harris@nrc.gov; Office of the Secretary Megan.Wright@nrc.gov; U.S. Nuclear Regulatory Commission Emily.Monteith@nrc.gov Rulemakings and Adjudications Staff Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov DB1/ 68381090

Office of Commission Appellate Adjudication Michael Keegan U.S. Nuclear Regulatory Commission Dont Waste Michigan Mail Stop: O-16C1 811 Harrison Street Washington, DC 20555-0001 Monroe, MI 48161 E-mail: ocaamail@nrc.gov E-mail: mkeeganj@comcast.net Kevin Kamps Terry J. Lodge Paul Gunter 316 N. Michigan St., Ste. 520 Beyond Nuclear Toledo, OH 43604 6930 Carroll Avenue, Suite 400 E-mail: tjlodge50@yahoo.com Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org; paul@beyondnuclear.org Signed (electronically) by Alex S. Polonsky Kathryn M. Sutton Alex S. Polonsky Martin J. ONeill Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: 202-739-3000 Fax: 202-739-3001 E-mail: aspolonsky@morganlewis.com COUNSEL FOR FENOC DB1/ 68381090 2