{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD                         )
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
In the Matter of       )  
                                                                        )
        ) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )
In the Matter of                                                         )
        )
                                                                        )       Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY                                   )
(Davis-Besse Nuclear Power Station, Unit 1)   ) January 13, 2012  
                                                                        )
                  ) FENOC'S MOTION FOR LEAVE TO FILE A MOTION FOR   RECONSIDERATION OF THE BOARD'S JANUARY 10 ORDER In accordance with 10 C.F.R. § 2.323(e), FirstEnergy Nuclear Operating Company ("FENOC") requests leave to file the attached Motion for Reconsideration of the Board's
(Davis-Besse Nuclear Power Station, Unit 1)                             )       January 13, 2012
                                                                        )
FENOCS MOTION FOR LEAVE TO FILE A MOTION FOR RECONSIDERATION OF THE BOARDS JANUARY 10 ORDER In accordance with 10 C.F.R. § 2.323(e), FirstEnergy Nuclear Operating Company (FENOC) requests leave to file the attached Motion for Reconsideration of the Boards January 10 Order (Board Order), which denied FENOCs Motion to Dismiss Contention 1 (Motion to Dismiss)1 as not timely.2 Section 2.323(e) provides that such motions: may not be filed except upon leave of the presiding officer[], upon a showing of compelling circumstances, such as the existence of a clear and material error in a decision, which could not have reasonably been anticipated, that renders the decision invalid.
Such compelling circumstances exist here, the Boards Order is inconsistent with Section B.1 and C of the Initial Scheduling Order (ISO),3 and with the treatment of similar dispositive motions by other Atomic Safety and Licensing Boards and the federal courts.4 These 1
FirstEnergy Nuclear Operating Companys Motion to Dismiss Contention 1 (Dec. 19, 2011).
2 Memorandum and Order (Denying Motion to Dismiss Contention 1), at 4 (Jan. 10, 2012) (unpublished). Per Section 2.323(e), this motion for leave and the attached motion for reconsideration are together only 10 pages long, and are filed within 10 days of the Boards Order.
3 Initial Scheduling Order (June 15, 2011), available at ADAMS Accession No. ML111662021.
4 As required by 10 C.F.R. § 2.323(b), counsel for FENOC contacted Intervenors counsel , in an attempt to narrow the issues. Intervenors did not agree to the relief requested. The NRC Staff does not oppose the Motion.


January 10 Order ("Board Order"), which denied FENOC's Motion to Dismiss Contention 1 ("Motion to Dismiss")
circumstances demonstrate clear and material errors in the Boards Order, which neither FENOC, nor the other parties, reasonably could have anticipated and which, if left unaddressed, materially prejudice the rights of all parties going forward.
1 as not timely.
Because the Boards sole basis for rejecting the Motion to Strike was because it was not timely,5 these circumstances render the decision invalid. Accordingly, FENOCs Motion for Reconsideration satisfies Section 2.323(e).
2  Section 2.323(e) provides that such motions: "may not be filed except upon leave of the pr esiding officer[], upon a showing of compelling circumstances, such as the existence of a clear and material e rror in a decision, which could not have reasonably been anticipated, that renders the decision invalid."    Such compelling circumstances exist here, the Board's Order is inconsistent with Section B.1 and C of the Initial Scheduling Order ("ISO"), 3 and with the treatment of similar dispositive motions by other Atomic Safety and Licensing Boards and the federal courts.
FENOC requests expedited treatment of this motion because its outcome affects the timeliness of filings related to dispositive motion, and amended contentions related to the upcoming Draft Supplemental Environmental Impact Statement (DSEIS).
4  These 1  FirstEnergy Nuclear Operating Company's Motion to Dismiss Contention 1 (Dec. 19, 2011).
Respectfully submitted, Signed (electronically) by Timothy P. Matthews Kathryn M. Sutton Timothy P. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
2  Memorandum and Order (Denying Motion to Dismiss Contention 1), at 4 (Jan. 10, 2012) (unpublished). Per Section 2.323(e), this motion for leave and the attached motion for reconsideration are together only 10 pages long, and are filed within 10 days of the Board's Order.
Washington, DC 20004 Phone: 202-739-5527 E-mail: tmatthews@morganlewis.com David W. Jenkins Senior Corporate Counsel FirstEnergy Service Company Mailstop: A-GO-15 76 South Main Street Akron, OH 44308 Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FIRSTENERGY 5
3  Initial Scheduling Order (June 15, 2011), available at ADAMS Accession No. ML111662021.
Board Order at 1.
4  As required by 10 C.F.R. § 2.323(b), counsel for FENOC contacted Intervenors' counsel , in an attempt to narrow the issues. Intervenors did not agree to the relief requested. The NRC Staff does not oppose the Motion.
2
2circumstances demonstrate clear and material errors in the Board's Order, which neither FENOC, nor the other parties, reasonably could have anticipated and which, if left unaddressed, materially prejudice the rights of all parties going forward. Because the Board's sole basis for rejecting the Motion to Strike was because it was "not timely,"5 these circumstances render the decision invalid. Accordingly, FENOC's Motion for Reconsideration satisfi es Section 2.323(e). FENOC requests expedited treatment of this motion because its outcome affects the timeliness of filings related to dispositive motion, and amended contentions related to the upcoming Draft Supplemental Environmental Impact Statement ("DSEIS").         Respectfully submitted, Signed (electronically) by Timothy P. Matthews Kathryn M. Sutton Timothy P. Matthews  


Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
Washington, DC 20004
                                                                        )
In the Matter of                                                        )
                                                                        )        Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY                                    )
                                                                        )
(Davis-Besse Nuclear Power Station, Unit 1)                              )        January 13, 2012
                                                                        )
FENOCS MOTION FOR RECONSIDERATION OF THE BOARDS JANUARY 10 ORDER I.      INTRODUCTION In accordance with 10 C.F.R. § 2.323(e), FirstEnergy Nuclear Operating Company (FENOC) requests that the Board reconsider its January 10, 2012, Order denying FENOCs Motion to Dismiss Contention 1 (Motion to Dismiss)1 as untimely (Board Order or Order).2 The Board should reconsider its Order in light of Sections B.1 and C of the Initial Scheduling Order (ISO).3 Moreover, other Atomic Safety and Licensing Boards and federal courts treat dispositive motions similarly to the approach described in this motion.
II.      PROCEDURAL BACKGROUND On August 27, 2010, FENOC submitted an Application, including an Environmental Report (Original ER), to the Nuclear Regulatory Commission (NRC) to renew the Davis-Besse operating license.4 The Original ER included a discussion of renewable energy 1
FirstEnergy Nuclear Operating Companys Motion to Dismiss Contention 1 (Dec. 19, 2011).
2 Memorandum and Order (Denying Motion to Dismiss Contention 1), at 4 (Jan. 10, 2012) (unpublished). Per Section 2.323(e), this motion is only 10 pages long and is filed within 10 days of the Boards Order.
3 Initial Scheduling Order (June 15, 2011), available at ADAMS Accession No. ML111662021.
4 Notice of Receipt and Availability of Application for a Renewal of Davis[-]Besse Nuclear Power Station, Unit 1, Facility Operating License No. NPF-003 for an Additional 20-Year Period, 75 Fed. Reg. 57299 (Sept. 2010).


Phone:  202-739-5527 E-mail:  tmatthews@morganlewis.com
alternatives which Intervenors found inadequate. Their Request for Public Hearing and Petition for Leave to Intervene (Petition), filed on December 27, 2010, proffered three alternative energy contentions. The Board consolidated the three contentions and admitted them as Contention 1, challenging the sufficiency of the ERs analysis of renewable energy sources and FENOCs conclusions that the proffered alternatives are not reasonable alternatives.5 On September 19, 2011, FENOC docketed revisions to the ER specifically addressing the alleged deficiencies raised in Contention 1 (Revised ER).6 Counsel for FENOC emailed the Revised ER to counsel for Intervenors on September 21. On October 19, counsel for FENOC consulted with the other parties, as required by 10 C.F.R. § 2.323(b). On October 31, the NRC Staff announced a delay in issuing the DSEIS until January 2012, to consider, among other things, the in-depth alternatives presented in FENOCs revised ER.7 ISO Section B.1 allows 60 days for Intervenors to amend contentions upon the availability of new informationmaking November 22, 2011, the deadline for Intervenors to amend Contention 1. Intervenors did not amend their contention by the deadline.
FENOC filed its Motion to Dismiss Contention 1 on December 19, after expiration of Intervenors 60-day deadline to file amended contentions.8 Pursuant to ISO Section C, Intervenors and the NRC Staff timely filed their responses on January 9, 2012.9 In its January 10 5
See FENOC (Davis-Besse Nuclear Power Station, Unit 1), LBP-11-13, slip op. at 24, 34 (Apr. 26, 2011).
6 See Letter from K. Byrd, FENOC, to NRC, License Renewal Application Amendment 16 for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Environmental Report (September 19, 2011) (ER Letter), available at ADAMS Accession No. ML11266A062.
7 See Letter to B. Allen, FENOC, from M. Galloway, NRC, Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (October 31, 2011), available at ADAMS Accession No. ML11256A164.
8 ISO at 12 (new or amended contentions considered timely if filed within 60 days of availability by any means of new information).
9 FENOCs Motion for Extension of Time, also filed today, seeks additional time to file a Motion to Strike those materials in Intervenors January 9 pleading, consistent with the Boards ruling on the instant Motion.
2


David W. Jenkins
Order, the Board denied FENOCs Motion to Dismiss, as well as Intervenors and the Staffs responses on the sole ground that they all were untimely.
II. ANALYSIS10 In its Order, the Board states that 10 C.F.R. § 2.323(a) requires that motions be filed no later than ten days after the occurrence or circumstance from which the motion arises, and that unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed within those ten days.11 The Order (at 1) states that the ISO contains no expansion or waiver of the ten-day limit imposed by 10 C.F.R. § 2.323(a) for other kinds of motions, other than a motion to compel. FENOC respectfully draws the Boards attention to the set of timing deadlines described in ISO Section C applicable to dispositive motions, and notes that the parties independently followed those deadlines in preparing and responding to the Motion to Dismiss.
A.      The ISO Provides Separate Timing Requirements For Dispositive Motions ISO Section A.6. (Disclosure Disputes and Motions to Compel) states that [t]he regulations require that, unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed within ten (10) days after the occurrence or circumstance from which the motion arises . . . Emphasis added. This Board otherwise specified separate timing requirements for dispositive motions in Section C of the ISO. ISO Section C states that no dispositive motion shall be filed later than thirty (30) days after the Trigger Date. The Trigger Date is defined in ISO Section F as the later of the issuance of the Final SEIS or the Final Safety Evaluation Report. ISO Section C places no other timing restrictions on filing of dispositive motions. Since section C of the ISO defines a motion to dismiss a contention as moot as a type 10 The legal standard for this Motion for Reconsideration is presented in the accompanying Motion for Leave and is, therefore, not repeated here.
11 Board Order (citing ISO at 11).
3


Senior Corporate Counsel
of dispositive motion12, and since the Staffs then most recent Schedule showed the FSEIS issuance in July 201213, FENOC was free to file its Motion to Dismiss as late as August 2012.
Moreover, the Board fashioned ISO Section C from the summary disposition timing rules in Section 2.1205.14 Section 2.1205(a) allows motions for summary disposition to be filed up to 45 days before the hearing; it does not set other timeliness requirement for these motions. The Commissions rules treat motions for summary disposition similar to the way federal courts treat motions for summary judgment under Rule 56 of the Federal Rules of Civil Procedure,15 in that they specify only a date by which such motions must be filed, not a series of earlier trigger dates from which they must be filed.16 Accordingly, the timing requirements for dispositive motions in this proceeding have only a date by which such motions must be filed, not a date from which they must be filed.17 B.        Other Atomic Safety and Licensing Boards Have Not Applied Section 2.323(a)s Timing Requirement to Motions to Dismiss a Contention Other Atomic Safety and Licensing Boards have not applied Section 2.323(a)s 10-day 12 ISO, Section C, at 13 (adjudicating a motion for summary disposition, motion to dismiss a contention as moot, or other dispositive motion ). Emphasis added.
13 See n.7, infra.
14 Transcript of Pre-Hearing Conference at 262-63 (May 19, 2011).
15 FRCP 56(b) (Unless a different time is set by local rule or the court orders otherwise, a party may file a motion for summary judgment at any time until 30 days after the close of all discovery.). The summary disposition rule for Part 2, SubPart G proceedings, also has similar timing requirements. See 10 C.F.R. 2.710(a) (Summary disposition motions must be filed no later than twenty (20) days after the close of discovery.); see also Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), LBP-07-13, 66 NRC 131, 168 n. 48 (2007) (revd in part on other grounds).
16 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 297 (2010).
17 This also is consistent with treatment of dispositive motions in federal courts, which often proscribe rules specific to dispositive motions as distinguished from generic motions. See e.g., Retamal v. U. S. Customs and Border Prot., Dept of Homeland Sec., 439 F.3d 1372, 1377 (Fed. Cir. 2006) (citing to Court of International Trade rules specific to dispositive motions, including thirty-day time limit for responding to dispositive motions distinguished from to ten-day limit for non-dispositive motions); Smith v. United Parcel Serv., No. 2:08-cv001313-RCJ-RJJ, 2011 WL 6101939, slip op. at *2 (D. Nev. Dec. 7, 2011) (referring to time limit for dispositive motions under the original scheduling order); Pedigo v. Austin Rumba, Inc., 722 F. Supp. 2d 714, 719 (W.D. Tex. 2010) (referencing scheduling order deadline for filing dispositive motions).
4


FirstEnergy Service Company Mailstop: A-GO-15
trigger to motions to dismiss. For example:18
* in the Oyster Creek license renewal proceeding, the Applicant filed a Motion to Dismiss a contention as moot, 22 days after the occurrence from which the motion arose;19
* in the North Anna new reactor proceeding, the applicant filed a Motion to Dismiss a contention as moot 13 days after the occurrence from which the motion arose;20
* in the Paina Hawaii food irradiator licensing proceeding, the Applicant filed a Motion to Dismiss two contentions as moot, 19 and 41 days after the occurrences from which the motion arose.21 Had these boards believed that the 10-day requirement in Section 2.323(a) applied, they would have rejected the motions as not timely. Yet in each of these cases, the Boards entertained and granted the motions.22 The fact that FENOC filed its Motion to Dismiss later than in these examples is not material; either the 10-day requirement in Section 2.323(a) applies or it does not.23 In this case, ISO Section C makes clear that it does not, and that interpretation is 18 These examples include only motions to dismiss contentions as moot.
19 AmerGens Motions to Dismiss Drywell Contention as Moot and to Suspend Mandatory Disclosures, at 2, AmerGen Energy Co. (Oyster Creek Nuclear Generating Station) (Apr. 25, 2006) (unpublished) (filing motion on April 26 based on April 4 docketed commitment to perform ultrasonic thickness measurements). The scheduling order in that proceeding does not address timing requirements for dispositive motions.
Memorandum and Order (Prehearing Conference Call Summary, Initial Scheduling Order, and Administrative Directives), AmerGen Energy Co. (Oyster Creek Nuclear Generating Station) (Apr. 19, 2006) (unpublished).
20 Dominions Motion to Dismiss BREDLs Contention 10 as Moot, at 3, Dominion Virginia Power (North Anna Power Station, Unit 3) (July 12, 2010) (unpublished) (filing motion on July 12 based on June 29 docketed COLA amendment). This prcoeedings scheduling order does not mention dispositive motions other than summary disposition motions, and merely noted that all other filings should comply with the applicable model milestones for hearings conducted under . . . Subpart L. Order (Establishing Schedule to Govern Further Proceedings, Dominion Virginia Power (North Anna Power Station,, Unit 3) (Sept. 10, 2008) (unpublished).
21 Applicant Paina Hawaii, LLCs Motion to Dismiss Safety Contentions #4 and #6, at 3, Paina Hawaii (Materials License Application) (Apr. 19, 2006) (unpublished) (filing motion on April 19 based on March 9 and March 31 filings of outline of emergency procedures). The Scheduling Order contains no discussion of dispositive motions. Order, Paina Hawaii (Materials License Application) (May 1, 2006) (unpublished).
22 The Oyster Creek and North Anna Boards granted the motions even though the applicants in those proceedings mentioned Section 2.323 or 2.323(a) in the first sentence of the motion (see supra note 23 and 24), which is how FENOC began its Motion to Strike. That is because Section 2.323 and 2.323(a) contain provisions applicable to motions other than timing, such as captioning for the Board and service on the parties. FENOC believed that the requirements of Section C were self-evident because it was filing a dispositive motion.
23 FENOC waited in this case to see whether Intervenors would timely amend their contention based on the September 2011 Revised ER, and so that the responses of the parties would not come due during the holidays.
5


76 South Main Street
consistent with the parties actions in this case, and with the actions of other Boards reviewing similar motions.24 C.       ISO Section C and Section 2.323 Are Incompatible The incompatibility of the timing requirements of ISO Section C and 10 C.F.R. 2.323 further demonstrates clear and material error. The Order (at 3 and 4) states that the ISO did not expand or waive either the 10-day limit, or the 10-day response time contained in Sections 2.323(a) and (c). However, ISO Section C allows parties to file Answers to dispositive motions within 20 days -- that provision conflicts with the Boards Order (at 4), which sets the time to file Answers at 10 days as specified in Section 2.323(c).               Clearly, ISO Section C also modified the timing of responses to dispositive motions. Similarly, the requirement in ISO Section C to file answers to dispositive motions within 20 days would exceed the time to prepare a dispositive motion under the Boards Order (at 4), because the Order applies the 10 day trigger in Section 2.323(a) established for general motions, to dispositive motions. It would be inequitable to allow a party twice as long to respond to a motion compared to the amount of time given to prepare such a motion.25 The January 10 Order confuses these timing requirements going forward.
 
24 The result is the same regarding motions for summary disposition, which were filed, and ruled upon, without regard to the timing requirement of 10 C.F.R. § 2.323(a). See, e.g., Applicants Motion for Summary Disposition of Riverkeeper Technical Contention 2 (Flow-Accelerated Corrosion), Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) (July 26, 2010) (unpublished), denied on the merits by Memorandum and Order (Ruling on Entergys Motion for Summary Disposition of Riverkeeper TC-2 (Flow-Accelerated Corrosion) (Nov. 4, 2010) (unpublished); AmerGen Energy Company, LLC Motion for Summary Disposition on Citizens Drywell Contention (Mar. 30, 2007) (unpublished), denied on the merits by Memorandum and Order (Denying AmerGens Motion for Summary Disposition) (June 19, 2007)
Akron, OH 44308
(unpublished); Entergys Motion for Summary Disposition of New England Coalitions Contention 3 (Steam Dryer), Entergy Nuclear Vermont Yankee LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station) (Apr. 19, 2007) (unpublished), granted by Memorandum and Order (Ruling on Motion for Summary Disposition of NEC Contention 3) (Sept. 11, 2007) (unpublished).
 
Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FIRSTENERGY
 
5  Board Order at 1.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD                          )
In the Matter of        )
        ) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY ) 
        )
(Davis-Besse Nuclear Power Station, Unit 1)    ) January 13, 2012
                  )  FENOC'S MOTION FOR RE CONSIDERATION OF THE BOARD'S JANUARY 10 ORDER I. INTRODUCTION In accordance with 10 C.F.R. § 2.323(e), FirstEnergy Nuclear Operating Company
("FENOC") requests that the Board reconsid er its January 10, 2012, Order denying FENOC's Motion to Dismiss Contention 1 ("Motion to Dismiss")
1 as untimely ("Board Order" or "Order").2  The Board should reconsider its Order in light of Sections B.1 and C of the Initial Scheduling Order ("ISO").
3  Moreover, other Atomic Safety and Licensing Boards and federal courts treat dispositive motions similarly to the approach described in this motion. II. PROCEDURAL BACKGROUND On August 27, 2010, FENOC submitted an Application, including an Environmental Report ("Original ER"), to the Nuclear Regulatory Commission ("NRC") to renew the Davis-Besse operating license.
4  The Original ER included a discussion of renewable energy
 
1  FirstEnergy Nuclear Operating Company's Motion to Dismiss Contention 1 (Dec. 19, 2011).
2  Memorandum and Order (Denying Motion to Dismiss Contention 1), at 4 (Jan. 10, 2012) (unpublished). Per Section 2.323(e), this motion is only 10 pages long and is filed within 10 days of the Board's Order.
3  Initial Scheduling Order (June 15, 2011), available at ADAMS Accession No. ML111662021.
4  Notice of Receipt and Availability of Application for a Renewal of Davis[-]Besse Nuclear Power Station, Unit 1, Facility Operating License No. NPF-003 for an Additional 20-Year Period, 75 Fed. Reg. 57299 (Sept. 2010).
2 alternatives which Intervenors f ound inadequate. Their "Request for Public Hearing and Petition for Leave to Intervene" ("Petition"), filed on December 27, 2 010, proffered three alternative energy contentions. The Board consolidated the three contentions and admitted them as
 
Contention 1, challenging the sufficiency of the ER
's analysis of renewable energy sources and FENOC's conclusions that the proffered alternatives are not reasonable alternatives.
5    On September 19, 2011, FENOC docketed revisions to the ER specifically addressing the alleged deficiencies raised in Contention 1 ("Revised ER").
6  Counsel for FENOC emailed the Revised ER to counsel for Intervenors on Sept ember 21. On October 19, counsel for FENOC consulted with the other parties, as required by 10 C.F.R. § 2.323(b). On October 31, the NRC Staff announced a delay in issuing the DSEIS until January 2012, to consider, among other things, the "in-depth alternatives" presented in FENOC's revised ER.
7  ISO Section B.1 allows 60 days for Intervenors to amend contentions upon the availability of new information-making November 22, 2011, the deadline for Intervenors to amend Contention 1. Intervenors did not amend their contention by the deadline. FENOC filed its Motion to Dismiss Cont ention 1 on December 19, after expiration of Intervenors' 60-day deadline to file amended contentions.
8  Pursuant to ISO Section C, Intervenors and the NRC Staff timely filed their responses on January 9, 2012.
9  In its January 10
 
5  See FENOC (Davis-Besse Nuclear Power Station, Unit 1), LBP-11-13, slip op. at 24, 34 (Apr. 26, 2011).
6  See Letter from K. Byrd, FENOC, to NRC, "License Renewal Application Amendment 16 for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Environmental Report" (September 19, 2011) ("ER Letter"), available at ADAMS Accession No. ML11266A062.
7  See Letter to B. Allen, FENOC, from M. Galloway, NRC, "Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application" (October 31, 2011), available at ADAMS Accession No. ML11256A164.
8  ISO at 12 (new or amended contentions considered timely if filed within 60 days of availability by any means of new information).
9  FENOC's Motion for Extension of Time, also filed today, seeks additional time to file a Motion to Strike those materials in Intervenors' January 9 pleading, consistent with the Board's ruling on the instant Motion.
3Order, the Board denied FENOC's Motion to Dism iss, as well as Intervenor's and the Staff's responses on the sole ground that they all were untimely.
II. ANALYSIS 10  In its Order, the Board states that 10 C.F.R. § 2.323(a) requires that motions be filed "no later than ten days after the occurrence or circumstance from which the motion arises," and that "unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed" within those ten days.
11  The Order (at 1) states that the IS O contains "no expans ion or waiver of the ten-day limit imposed by 10 C.F.R. § 2.323(a)" for other kinds of motions, other than a motion to compel. FENOC respectfully draws the Board's attention to the set of timing deadlines described in ISO Section C applicable to dispositive mo tions, and notes that the parties independently followed those deadlines in prepar ing and responding to the Motion to Dismiss.
A. The ISO Provides Separate Timing Requirements For Dispositive Motions  ISO Section A.6. ("Disclosure Disputes and Motions to Compel") states that "[t]he regulations require that, unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed within ten (10) days after the occurrence or circumstance from which the motion arises  . . ."  Emphasis added. This Board "otherwise specified" separate timing requirements for dispositive motions in Section C of the ISO. ISO Sec tion C states that "no dispositive motion shall be filed later than thirty (30) days after the Trigger Date."  The Trigger Date is defined in ISO Section F as the later of the issuance of the Final SEIS or the Final Safety Evaluation Report. ISO Section C places no other timing restrictions on filing of dispositive motions. Since section C of the ISO defines "a motion to dismiss a contention as moot" as a type
 
10  The legal standard for this Motion for Reconsideration is presented in the accompanying Motion for Leave and is, therefore, not repeated here.
11  Board Order (citing ISO at 11).
4of dispositive motion 12, and since the Staff's then most recent Schedule showed the FSEIS issuance in July 2012 13 , FENOC was free to file its Motion to Dismiss as late as August 2012. Moreover, the Board fashioned ISO Section C from the summary disposition timing rules in Section 2.1205.
14  Section 2.1205(a) allows motions for summary disposition to be filed up to 45 days before the hearing; it does not set other timeliness requirement for these motions. The Commission's rules treat motions for summary disposition similar to the way federal courts treat motions for summary judgment under Rule 56 of the Federal Rules of Civil Procedure, 15 in that they specify only a date by which such motions must be filed, not a series of earlier trigger dates from which they must be filed.
16  Accordingly, the timing requirements for dispositive motions in this proceeding have only a date by which such motions must be filed, not a date from which they must be filed.
17 B. Other Atomic Safety and Licensing Boards Have Not Applied Section 2.323(a)'s Timing Requirement to Motions to Dismiss a Contention  Other Atomic Safety and Licensing Boards have not applied Section 2.323(a)'s 10-day
 
12  ISO, Section C, at 13 ("adjudicating a motion for summary disposition, motion to dismiss a contention as moot , or other dispositive motion -"). Emphasis added.
13  See n.7, infra.
14  Transcript of Pre-Hearing Conference at 262-63 (May 19, 2011).
15  FRCP 56(b) ("Unless a different time is set by local rule or the court orders otherwise, a party may file a motion for summary judgment at any time until 30 days after the close of all discovery."). The summary disposition rule for Part 2, SubPart G proceedings, also has similar timing requirements. See 10 C.F.R. 2.710(a) ("Summary disposition motions must be filed no later than twenty (20) days after the close of discovery."); see also Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), LBP-07-13, 66 NRC 131, 168 n. 48 (2007) (rev'd in part on other grounds).
16  Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 297 (2010).
17  This also is consistent with treatment of dispositive motions in federal courts, which often proscribe rules specific to dispositive motions as distinguished from generic motions.
See e.g., Retamal v. U. S. Customs and Border Prot., Dep't of Homeland Sec., 439 F.3d 1372, 1377 (Fed. Cir. 2006) (citing to Court of International Trade rules specific to dispositive motions, including thirty-day time limit for responding to dispositive motions distinguished from to ten-day limit for non-dispositive motions); Smith v. United Parcel Serv., No. 2:08-cv001313-RCJ-RJJ, 2011 WL 6101939, slip op. at *2 (D. Nev. Dec. 7, 2011) (referring to "time limit for dispositive motions under the original scheduling order"); Pedigo v. Austin Rumba, Inc., 722 F. Supp. 2d 714, 719 (W.D. Tex. 2010) (referencing scheduling order deadline for filing dispositive motions).
5trigger to motions to dismiss. For example:
18
* in the Oyster Creek license renewal proceeding, the Applicant filed a Motion to Dismiss a contention as moot, 22 days after the occurrence from which the motion arose; 19
* in the North Anna new reactor proceeding, the applicant filed a Motion to Dismiss a contention as moot 13 days after the occurrence from which the motion arose; 20
* in the Pa'ina Hawaii food irradiator licensing proceeding, the Applicant filed a Motion to Dismiss two contentions as moot, 19 and 41 days after the occurrences from which the motion arose.
21  Had  these boards believed that the 10-day requirement in Section 2.323(a) applied, they would have rejected the motions as not timely. Yet in each of these cases, the Boards entertained and granted the motions.
22  The fact that FENOC filed its Motion to Dismiss later than in these examples is not material; either the 10-day requirement in Section 2.323(a) applies or it does not.23  In this case, ISO Section C makes clear that it does not, and that interpretation is
 
18  These examples include only motions to dismiss contentions as moot.
19  AmerGen's Motions to Dismiss Drywell Contention as Moot and to Suspend Mandatory Disclosures, at 2, AmerGen Energy Co. (Oyster Creek Nuclear Generating Station) (Apr. 25, 2006) (unpublished) (filing motion on April 26 based on April 4 docketed commitment to perform ultrasonic thickness measurements). The scheduling order in that proceeding does not address timing requirements for dispositive motions.
Memorandum and Order (Prehearing Conference Call Summary, Initial Scheduling Order, and Administrative Directives), AmerGen Energy Co. (Oyster Creek Nuclear Generating Station)  (Apr. 19, 2006) (unpublished).
20  Dominion's Motion to Dismiss BREDL's Contention 10 as Moot, at 3, Dominion Virginia Power (North Anna Power Station, Unit 3) (July 12, 2010) (unpublished) (filing motion on July 12 based on June 29 docketed COLA amendment). This prcoeeding's scheduling order does not mention dispositive motions other than summary disposition motions, and merely noted that all other filings should comply with "the applicable model milestones for hearings conducted under . . . Subpart L. Order (Establishing Schedule to Govern Further Proceedings, Dominion Virginia Power (North Anna Powe r Station,, Unit 3) (Sept.
10, 2008) (u npublished).
21  Applicant Pa'ina Hawaii, LLC's Motion to Dismiss Safety Contentions #4 and #6, at 3, Pa'ina Hawaii (Materials License Application) (Apr. 19, 2006) (unpublished) (filing motion on April 19 based on March 9 and March 31 filings of outline of emergency procedures). The Scheduling Order contains no discussion of dispositive motions. Order, Pa'ina Hawaii (Materials License Application) (May 1, 2006) (unpublished).
22  The Oyster Creek and North Anna Boards granted the motions even though the applicants in those proceedings mentioned Section 2.323 or 2.323(a) in the first sentence of the motion (see supra note 23 and 24), which is how FENOC began its Motion to Strike. That is because Section 2.323 and 2.323(a) contain provisions applicable to motions other than timing, such as captioning for the Board and service on the parties. FENOC believed that the requirements of Section C were self-evident because it was filing a dispositive motion.
23  FENOC waited in this case to see whether Intervenors would timely amend their contention based on the September 2011 Revised ER, and so that the responses of the parties would not come due during the holidays.
6consistent with the parties' actions in this case , and with the actions of other Boards' reviewing similar motions.
24 C. ISO Section C and Section 2.323 Are Incompatible The incompatibility of the timing requirements of ISO Section C and 10 C.F.R. 2.323 further demonstrates clear and material error. Th e Order (at 3 and 4) states that the ISO did not expand or waive either the 10-day limit, or the 10-day response time contained in Sections 2.323(a) and (c). However, ISO Section C allows parties to file Answers to dispositive motions within 20 days -- that provision conflicts with the Board's Order (at 4), which sets the time to file Answers at 10 days as specified in Section 2.323(c).
Clearly, ISO Section C also modified the timing of responses to dispositive motions. Similarly, the requirement in ISO Section C to file answers to dispositive motions within 20 days would exceed the time to prepare a dispositive motion under the Board's Order (at 4), because the Order applies the 10 day trigger in Section 2.323(a) established for general motions, to dispositive motions. It would be inequitable to allow a party twice as long to respond to a motion compared to the amount of time given to prepare such a motion.
25 The January 10 Order confuses these timing requirements going forward.  
 
24 The result is the same regarding motions for summary disposition, which were filed, and ruled upon, without regard to the timing requirement of 10 C.F.R. § 2.323(a). See, e.g., Applicant's Motion for Summary Disposition of Riverkeeper Technical Contention 2 (Flow-Accelerated Corrosion), Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) (July 26, 2010) (unpublished), denied on the merits by Memorandum and Order (Ruling on Entergy's Motion for Summary Disposition of Riverkeeper TC-2 (Flow-Accelerated Corrosion) (Nov. 4, 2010) (unpublished); AmerGen Energy Company, LLC Motion for Summary Disposition on Citizens' Drywell Contention (Mar. 30, 2007) (unpublished), denied on the merits by Memorandum and Order (Denying AmerGen's Motion for Summary Disposition) (June 19, 2007) (unpublished); Entergy's Motion for Summary Disposition of New England Coalition's Contention 3 (Steam Dryer), Entergy Nuclear Vermont Yankee LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station) (Apr. 19, 2007) (unpublished), granted by Memorandum and Order (Ruling on Motion for Summary Disposition of NEC Contention 3) (Sept. 11, 2007) (unpublished).
25 It also may be impracticable to file a summary disposition motion, with its requirement for an affidavit and statement of material facts that are not in dispute within ten days of new information. This will particularly be the case when the moving party is not the party preparing the underlying new information.
25 It also may be impracticable to file a summary disposition motion, with its requirement for an affidavit and statement of material facts that are not in dispute within ten days of new information. This will particularly be the case when the moving party is not the party preparing the underlying new information.
7D. Allowing Intervenors Not to Refile Contention 1 after the DSEIS is Incompatible with ISO Section B.1. Although not central to the holding on timelin ess of the Motion to Dismiss, footnote 32 of the Board Order (at 6) also is incompatible w ith the ISO. That footnote states that:  "Joint Intervenors will not be required to refile Contention 1 in order to challenge the NRC Staff's treatment of the same issues in the DSEIS," a nd cites to another Board's order as the sole support.26  However, ISO Section B.1 limits Intervenors to 60 days from the availability of new information to amend a contention.
6
The NRC Staff has indicated that it intends to consider in the DSEIS the "in-depth alternatives" presented in FENOC's Revised ER.
27  Order footnote 32 anticipates this consideration when it states that there will be "treatment of the same issues in the DSEIS."  Yet, footnote 32 contravenes ISO Sec tion B.1 not only by ignoring the original 60-day deadline, but also by waiving Intervenors obligation to file an ame nded contention based on "new" information in the DSEIS.
28  This is a clear and material error that, because of the plain language of ISO Section B.1, FENOC could not have reason ably anticipated. To not correct this ruling would allow the parties to go to hearing on issues that may be moot ed in the DSEIS, resulting in a waste of the parties' and the Board's resources.
 
26  The Board cites to and quotes from Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), LBP-01-23, 54 NRC 163, 172 n.3 (2001). The Board appears to have intended to cite LBP-01-26, 54 N.R.C. 199, 208 (2001).
27  See Letter to B. Allen, FENOC, from M. Galloway, NRC, "Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application" (October 31, 2011), available at ADAMS Accession No. ML11256A164.
28  It would be inappropriate convert the issuance of the DSEIS into a second trigger date from which to timely file an amended contention on  the same information published months prior in FENOC's ER Revision.
8 IV. CONCLUSION The Board made a clear and material error in its Order declaring that the Motion to Dismiss and responsive filings were not timely.
ISO Section C carved out exceptions to the timing requirements in Section 2.323(a) and (c), a nd the parties relied on those exceptions. The Motion to Dismiss, and the Intervenors and Sta ff's responses all were filed consistent with FENOC's understanding of the timing requirements related to dispositive motions in ISO Section C. In light of Section C, and well established adjudicatory practice on Motions to Dismiss, FENOC could not have reasonably anticipated that the Board w ould reject its Motion as not timely, which renders the Order, based solely on timeliness, invalid. Additionally, the Board should clarify the Intervenors' obligation with respect to filing new or amended contentions.
Accordingly, the Board shoul d reconsider its Order.        Respectfully submitted,      Signed (electronically) by Timothy P. Matthews Kathryn M. Sutton Timothy P. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
 
Washington, DC 20004
 
Phone:  202-739-5527 E-mail:  tmathews@morganlewis.com
 
David W. Jenkins
 
Senior Corporate Counsel
 
FirstEnergy Service Company Mailstop: A-GO-15
 
76 South Main Street
 
Akron, OH 44308
 
Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FENOC
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION                          )
In the Matter of        )
        ) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY ) 
        )
(Davis-Besse Nuclear Power Station, Unit 1)    ) January 13,  2012
                  )  CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of:
: 1. FENOC'S MOTION FOR LEAVE TO FILE A MOTION FOR RECONSIDERATION OF THE BOARD'S JANUARY 10 ORDER, and;
: 2. FENOC'S MOTION FOR RECONSIDERATION OF THE BOARD'S JANUARY 10 ORDER were filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients. Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Panel
 
U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 E-mail: wjf1@nrc.gov
 
Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Panel
 
U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 E-mail: wek1@nrc.gov
 
Administrative Judge Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel
 
U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 E-mail: nicholas.trikouros@nrc.gov
 
Office of the General Counsel 
 
U.S. Nuclear Regulatory Commission Mail Stop O-15D21
 
Washington, DC  20555-0001 Edward L. Williamson
 
Lloyd B. Subin
 
Brian G. Harris 2
DB1/ 68852663.4    Office of the Secretary
 
U.S. Nuclear Regulatory Commission Rulemakings and Adjudications Staff
 
Washington, DC  20555-0001 E-mail: hearingdocket@nrc.gov
 
Office of Commission Appellate Adjudication
 
U.S. Nuclear Regulatory Commission Mail Stop: O-16C1
 
Washington, DC  20555-0001 E-mail: ocaamail@nrc.gov
 
Kevin Kamps
 
Paul Gunter
 
Beyond Nuclear
 
6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org;
 
paul@beyondnuclear.org
 
Richard S. Harper Brian P. Newell Catherine E. Kanatas edward.williamson@nrc.gov; lloyd.subin@nrc.gov; 
 
brian.harris@nrc.gov;
 
richard.harper@nrc.gov;
 
brian.newell@nrc.gov;
 
catherine.kanatas@nrc.gov
 
Michael Keegan Don't Waste Michigan
 
811 Harrison Street


Monroe, MI 48161 E-mail: mkeeganj@comcast.net 
D.      Allowing Intervenors Not to Refile Contention 1 after the DSEIS is Incompatible with ISO Section B.1.
Although not central to the holding on timeliness of the Motion to Dismiss, footnote 32 of the Board Order (at 6) also is incompatible with the ISO. That footnote states that: Joint Intervenors will not be required to refile Contention 1 in order to challenge the NRC Staffs treatment of the same issues in the DSEIS, and cites to another Boards order as the sole support.26 However, ISO Section B.1 limits Intervenors to 60 days from the availability of new information to amend a contention.
The NRC Staff has indicated that it intends to consider in the DSEIS the in-depth alternatives presented in FENOCs Revised ER.27 Order footnote 32 anticipates this consideration when it states that there will be treatment of the same issues in the DSEIS. Yet, footnote 32 contravenes ISO Section B.1 not only by ignoring the original 60-day deadline, but also by waiving Intervenors obligation to file an amended contention based on new information in the DSEIS.28 This is a clear and material error that, because of the plain language of ISO Section B.1, FENOC could not have reasonably anticipated. To not correct this ruling would allow the parties to go to hearing on issues that may be mooted in the DSEIS, resulting in a waste of the parties and the Boards resources.
26 The Board cites to and quotes from Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation),
LBP-01-23, 54 NRC 163, 172 n.3 (2001). The Board appears to have intended to cite LBP-01-26, 54 N.R.C.
199, 208 (2001).
27 See Letter to B. Allen, FENOC, from M. Galloway, NRC, Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (October 31, 2011), available at ADAMS Accession No. ML11256A164.
28 It would be inappropriate convert the issuance of the DSEIS into a second trigger date from which to timely file an amended contention on the same information published months prior in FENOCs ER Revision.
7


Terry J. Lodge
IV. CONCLUSION The Board made a clear and material error in its Order declaring that the Motion to Dismiss and responsive filings were not timely. ISO Section C carved out exceptions to the timing requirements in Section 2.323(a) and (c), and the parties relied on those exceptions. The Motion to Dismiss, and the Intervenors and Staffs responses all were filed consistent with FENOCs understanding of the timing requirements related to dispositive motions in ISO Section C. In light of Section C, and well established adjudicatory practice on Motions to Dismiss, FENOC could not have reasonably anticipated that the Board would reject its Motion as not timely, which renders the Order, based solely on timeliness, invalid. Additionally, the Board should clarify the Intervenors obligation with respect to filing new or amended contentions.
Accordingly, the Board should reconsider its Order.
Respectfully submitted, Signed (electronically) by Timothy P. Matthews Kathryn M. Sutton Timothy P. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
Washington, DC 20004 Phone: 202-739-5527 E-mail: tmathews@morganlewis.com David W. Jenkins Senior Corporate Counsel FirstEnergy Service Company Mailstop: A-GO-15 76 South Main Street Akron, OH 44308 Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FENOC 8


316 N. Michigan St., Ste. 520
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION
                                                              )
In the Matter of                                              )
                                                              )      Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY                        )
                                                              )
(Davis-Besse Nuclear Power Station, Unit 1)                  )      January 13, 2012
                                                              )
CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of:
: 1. FENOCS MOTION FOR LEAVE TO FILE A MOTION FOR RECONSIDERATION OF THE BOARDS JANUARY 10 ORDER, and;
: 2. FENOCS MOTION FOR RECONSIDERATION OF THE BOARDS JANUARY 10 ORDER were filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients.
Administrative Judge                                    Administrative Judge William J. Froehlich, Chair                            Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel                Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission                      U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                              Washington, DC 20555-0001 E-mail: wjf1@nrc.gov                                    E-mail: nicholas.trikouros@nrc.gov Administrative Judge                                    Office of the General Counsel Dr. William E. Kastenberg                              U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel                Mail Stop O-15D21 U.S. Nuclear Regulatory Commission                      Washington, DC 20555-0001 Washington, DC 20555-0001                              Edward L. Williamson E-mail: wek1@nrc.gov                                    Lloyd B. Subin Brian G. Harris


Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Timothy P. Matthews Timothy P. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue., N.W.
Richard S. Harper Office of the Secretary                            Brian P. Newell U.S. Nuclear Regulatory Commission                Catherine E. Kanatas Rulemakings and Adjudications Staff              edward.williamson@nrc.gov; Washington, DC 20555-0001                          lloyd.subin@nrc.gov; E-mail: hearingdocket@nrc.gov                      brian.harris@nrc.gov; richard.harper@nrc.gov; brian.newell@nrc.gov; catherine.kanatas@nrc.gov Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Michael Keegan Dont Waste Michigan 811 Harrison Street Kevin Kamps                                        Monroe, MI 48161 Paul Gunter                                        E-mail: mkeeganj@comcast.net Beyond Nuclear 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org;                  Terry J. Lodge paul@beyondnuclear.org                            316 N. Michigan St., Ste. 520 Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Timothy P. Matthews Timothy P. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue., N.W.
Washington, DC 20004 Phone: 202-739-5527 Fax: 202-739-3001 E-mail: tmatthews@morganlewis.com}}
Washington, DC 20004 Phone: 202-739-5527 Fax: 202-739-3001 E-mail: tmatthews@morganlewis.com DB1/ 68852663.4 2}}

Latest revision as of 10:43, 12 November 2019

Fenoc'S Motion for Leave to File a Motion for Reconsideration of the Board'S January 10 Order
ML12013A390
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/13/2012
From: Matthews T
Morgan, Morgan, Lewis & Bockius, LLP, FirstEnergy Nuclear Operating Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21746, 50-346-LR, ASLBP 11-907-01-LR-BD01
Download: ML12013A390 (12)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) January 13, 2012

)

FENOCS MOTION FOR LEAVE TO FILE A MOTION FOR RECONSIDERATION OF THE BOARDS JANUARY 10 ORDER In accordance with 10 C.F.R. § 2.323(e), FirstEnergy Nuclear Operating Company (FENOC) requests leave to file the attached Motion for Reconsideration of the Boards January 10 Order (Board Order), which denied FENOCs Motion to Dismiss Contention 1 (Motion to Dismiss)1 as not timely.2 Section 2.323(e) provides that such motions: may not be filed except upon leave of the presiding officer[], upon a showing of compelling circumstances, such as the existence of a clear and material error in a decision, which could not have reasonably been anticipated, that renders the decision invalid.

Such compelling circumstances exist here, the Boards Order is inconsistent with Section B.1 and C of the Initial Scheduling Order (ISO),3 and with the treatment of similar dispositive motions by other Atomic Safety and Licensing Boards and the federal courts.4 These 1

FirstEnergy Nuclear Operating Companys Motion to Dismiss Contention 1 (Dec. 19, 2011).

2 Memorandum and Order (Denying Motion to Dismiss Contention 1), at 4 (Jan. 10, 2012) (unpublished). Per Section 2.323(e), this motion for leave and the attached motion for reconsideration are together only 10 pages long, and are filed within 10 days of the Boards Order.

3 Initial Scheduling Order (June 15, 2011), available at ADAMS Accession No. ML111662021.

4 As required by 10 C.F.R. § 2.323(b), counsel for FENOC contacted Intervenors counsel , in an attempt to narrow the issues. Intervenors did not agree to the relief requested. The NRC Staff does not oppose the Motion.

circumstances demonstrate clear and material errors in the Boards Order, which neither FENOC, nor the other parties, reasonably could have anticipated and which, if left unaddressed, materially prejudice the rights of all parties going forward.

Because the Boards sole basis for rejecting the Motion to Strike was because it was not timely,5 these circumstances render the decision invalid. Accordingly, FENOCs Motion for Reconsideration satisfies Section 2.323(e).

FENOC requests expedited treatment of this motion because its outcome affects the timeliness of filings related to dispositive motion, and amended contentions related to the upcoming Draft Supplemental Environmental Impact Statement (DSEIS).

Respectfully submitted, Signed (electronically) by Timothy P. Matthews Kathryn M. Sutton Timothy P. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: 202-739-5527 E-mail: tmatthews@morganlewis.com David W. Jenkins Senior Corporate Counsel FirstEnergy Service Company Mailstop: A-GO-15 76 South Main Street Akron, OH 44308 Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FIRSTENERGY 5

Board Order at 1.

2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) January 13, 2012

)

FENOCS MOTION FOR RECONSIDERATION OF THE BOARDS JANUARY 10 ORDER I. INTRODUCTION In accordance with 10 C.F.R. § 2.323(e), FirstEnergy Nuclear Operating Company (FENOC) requests that the Board reconsider its January 10, 2012, Order denying FENOCs Motion to Dismiss Contention 1 (Motion to Dismiss)1 as untimely (Board Order or Order).2 The Board should reconsider its Order in light of Sections B.1 and C of the Initial Scheduling Order (ISO).3 Moreover, other Atomic Safety and Licensing Boards and federal courts treat dispositive motions similarly to the approach described in this motion.

II. PROCEDURAL BACKGROUND On August 27, 2010, FENOC submitted an Application, including an Environmental Report (Original ER), to the Nuclear Regulatory Commission (NRC) to renew the Davis-Besse operating license.4 The Original ER included a discussion of renewable energy 1

FirstEnergy Nuclear Operating Companys Motion to Dismiss Contention 1 (Dec. 19, 2011).

2 Memorandum and Order (Denying Motion to Dismiss Contention 1), at 4 (Jan. 10, 2012) (unpublished). Per Section 2.323(e), this motion is only 10 pages long and is filed within 10 days of the Boards Order.

3 Initial Scheduling Order (June 15, 2011), available at ADAMS Accession No. ML111662021.

4 Notice of Receipt and Availability of Application for a Renewal of Davis[-]Besse Nuclear Power Station, Unit 1, Facility Operating License No. NPF-003 for an Additional 20-Year Period, 75 Fed. Reg. 57299 (Sept. 2010).

alternatives which Intervenors found inadequate. Their Request for Public Hearing and Petition for Leave to Intervene (Petition), filed on December 27, 2010, proffered three alternative energy contentions. The Board consolidated the three contentions and admitted them as Contention 1, challenging the sufficiency of the ERs analysis of renewable energy sources and FENOCs conclusions that the proffered alternatives are not reasonable alternatives.5 On September 19, 2011, FENOC docketed revisions to the ER specifically addressing the alleged deficiencies raised in Contention 1 (Revised ER).6 Counsel for FENOC emailed the Revised ER to counsel for Intervenors on September 21. On October 19, counsel for FENOC consulted with the other parties, as required by 10 C.F.R. § 2.323(b). On October 31, the NRC Staff announced a delay in issuing the DSEIS until January 2012, to consider, among other things, the in-depth alternatives presented in FENOCs revised ER.7 ISO Section B.1 allows 60 days for Intervenors to amend contentions upon the availability of new informationmaking November 22, 2011, the deadline for Intervenors to amend Contention 1. Intervenors did not amend their contention by the deadline.

FENOC filed its Motion to Dismiss Contention 1 on December 19, after expiration of Intervenors 60-day deadline to file amended contentions.8 Pursuant to ISO Section C, Intervenors and the NRC Staff timely filed their responses on January 9, 2012.9 In its January 10 5

See FENOC (Davis-Besse Nuclear Power Station, Unit 1), LBP-11-13, slip op. at 24, 34 (Apr. 26, 2011).

6 See Letter from K. Byrd, FENOC, to NRC, License Renewal Application Amendment 16 for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Environmental Report (September 19, 2011) (ER Letter), available at ADAMS Accession No. ML11266A062.

7 See Letter to B. Allen, FENOC, from M. Galloway, NRC, Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (October 31, 2011), available at ADAMS Accession No. ML11256A164.

8 ISO at 12 (new or amended contentions considered timely if filed within 60 days of availability by any means of new information).

9 FENOCs Motion for Extension of Time, also filed today, seeks additional time to file a Motion to Strike those materials in Intervenors January 9 pleading, consistent with the Boards ruling on the instant Motion.

2

Order, the Board denied FENOCs Motion to Dismiss, as well as Intervenors and the Staffs responses on the sole ground that they all were untimely.

II. ANALYSIS10 In its Order, the Board states that 10 C.F.R. § 2.323(a) requires that motions be filed no later than ten days after the occurrence or circumstance from which the motion arises, and that unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed within those ten days.11 The Order (at 1) states that the ISO contains no expansion or waiver of the ten-day limit imposed by 10 C.F.R. § 2.323(a) for other kinds of motions, other than a motion to compel. FENOC respectfully draws the Boards attention to the set of timing deadlines described in ISO Section C applicable to dispositive motions, and notes that the parties independently followed those deadlines in preparing and responding to the Motion to Dismiss.

A. The ISO Provides Separate Timing Requirements For Dispositive Motions ISO Section A.6. (Disclosure Disputes and Motions to Compel) states that [t]he regulations require that, unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed within ten (10) days after the occurrence or circumstance from which the motion arises . . . Emphasis added. This Board otherwise specified separate timing requirements for dispositive motions in Section C of the ISO. ISO Section C states that no dispositive motion shall be filed later than thirty (30) days after the Trigger Date. The Trigger Date is defined in ISO Section F as the later of the issuance of the Final SEIS or the Final Safety Evaluation Report. ISO Section C places no other timing restrictions on filing of dispositive motions. Since section C of the ISO defines a motion to dismiss a contention as moot as a type 10 The legal standard for this Motion for Reconsideration is presented in the accompanying Motion for Leave and is, therefore, not repeated here.

11 Board Order (citing ISO at 11).

3

of dispositive motion12, and since the Staffs then most recent Schedule showed the FSEIS issuance in July 201213, FENOC was free to file its Motion to Dismiss as late as August 2012.

Moreover, the Board fashioned ISO Section C from the summary disposition timing rules in Section 2.1205.14 Section 2.1205(a) allows motions for summary disposition to be filed up to 45 days before the hearing; it does not set other timeliness requirement for these motions. The Commissions rules treat motions for summary disposition similar to the way federal courts treat motions for summary judgment under Rule 56 of the Federal Rules of Civil Procedure,15 in that they specify only a date by which such motions must be filed, not a series of earlier trigger dates from which they must be filed.16 Accordingly, the timing requirements for dispositive motions in this proceeding have only a date by which such motions must be filed, not a date from which they must be filed.17 B. Other Atomic Safety and Licensing Boards Have Not Applied Section 2.323(a)s Timing Requirement to Motions to Dismiss a Contention Other Atomic Safety and Licensing Boards have not applied Section 2.323(a)s 10-day 12 ISO, Section C, at 13 (adjudicating a motion for summary disposition, motion to dismiss a contention as moot, or other dispositive motion ). Emphasis added.

13 See n.7, infra.

14 Transcript of Pre-Hearing Conference at 262-63 (May 19, 2011).

15 FRCP 56(b) (Unless a different time is set by local rule or the court orders otherwise, a party may file a motion for summary judgment at any time until 30 days after the close of all discovery.). The summary disposition rule for Part 2, SubPart G proceedings, also has similar timing requirements. See 10 C.F.R. 2.710(a) (Summary disposition motions must be filed no later than twenty (20) days after the close of discovery.); see also Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), LBP-07-13, 66 NRC 131, 168 n. 48 (2007) (revd in part on other grounds).

16 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 297 (2010).

17 This also is consistent with treatment of dispositive motions in federal courts, which often proscribe rules specific to dispositive motions as distinguished from generic motions. See e.g., Retamal v. U. S. Customs and Border Prot., Dept of Homeland Sec., 439 F.3d 1372, 1377 (Fed. Cir. 2006) (citing to Court of International Trade rules specific to dispositive motions, including thirty-day time limit for responding to dispositive motions distinguished from to ten-day limit for non-dispositive motions); Smith v. United Parcel Serv., No. 2:08-cv001313-RCJ-RJJ, 2011 WL 6101939, slip op. at *2 (D. Nev. Dec. 7, 2011) (referring to time limit for dispositive motions under the original scheduling order); Pedigo v. Austin Rumba, Inc., 722 F. Supp. 2d 714, 719 (W.D. Tex. 2010) (referencing scheduling order deadline for filing dispositive motions).

4

trigger to motions to dismiss. For example:18

  • in the Oyster Creek license renewal proceeding, the Applicant filed a Motion to Dismiss a contention as moot, 22 days after the occurrence from which the motion arose;19
  • in the North Anna new reactor proceeding, the applicant filed a Motion to Dismiss a contention as moot 13 days after the occurrence from which the motion arose;20
  • in the Paina Hawaii food irradiator licensing proceeding, the Applicant filed a Motion to Dismiss two contentions as moot, 19 and 41 days after the occurrences from which the motion arose.21 Had these boards believed that the 10-day requirement in Section 2.323(a) applied, they would have rejected the motions as not timely. Yet in each of these cases, the Boards entertained and granted the motions.22 The fact that FENOC filed its Motion to Dismiss later than in these examples is not material; either the 10-day requirement in Section 2.323(a) applies or it does not.23 In this case, ISO Section C makes clear that it does not, and that interpretation is 18 These examples include only motions to dismiss contentions as moot.

19 AmerGens Motions to Dismiss Drywell Contention as Moot and to Suspend Mandatory Disclosures, at 2, AmerGen Energy Co. (Oyster Creek Nuclear Generating Station) (Apr. 25, 2006) (unpublished) (filing motion on April 26 based on April 4 docketed commitment to perform ultrasonic thickness measurements). The scheduling order in that proceeding does not address timing requirements for dispositive motions.

Memorandum and Order (Prehearing Conference Call Summary, Initial Scheduling Order, and Administrative Directives), AmerGen Energy Co. (Oyster Creek Nuclear Generating Station) (Apr. 19, 2006) (unpublished).

20 Dominions Motion to Dismiss BREDLs Contention 10 as Moot, at 3, Dominion Virginia Power (North Anna Power Station, Unit 3) (July 12, 2010) (unpublished) (filing motion on July 12 based on June 29 docketed COLA amendment). This prcoeedings scheduling order does not mention dispositive motions other than summary disposition motions, and merely noted that all other filings should comply with the applicable model milestones for hearings conducted under . . . Subpart L. Order (Establishing Schedule to Govern Further Proceedings, Dominion Virginia Power (North Anna Power Station,, Unit 3) (Sept. 10, 2008) (unpublished).

21 Applicant Paina Hawaii, LLCs Motion to Dismiss Safety Contentions #4 and #6, at 3, Paina Hawaii (Materials License Application) (Apr. 19, 2006) (unpublished) (filing motion on April 19 based on March 9 and March 31 filings of outline of emergency procedures). The Scheduling Order contains no discussion of dispositive motions. Order, Paina Hawaii (Materials License Application) (May 1, 2006) (unpublished).

22 The Oyster Creek and North Anna Boards granted the motions even though the applicants in those proceedings mentioned Section 2.323 or 2.323(a) in the first sentence of the motion (see supra note 23 and 24), which is how FENOC began its Motion to Strike. That is because Section 2.323 and 2.323(a) contain provisions applicable to motions other than timing, such as captioning for the Board and service on the parties. FENOC believed that the requirements of Section C were self-evident because it was filing a dispositive motion.

23 FENOC waited in this case to see whether Intervenors would timely amend their contention based on the September 2011 Revised ER, and so that the responses of the parties would not come due during the holidays.

5

consistent with the parties actions in this case, and with the actions of other Boards reviewing similar motions.24 C. ISO Section C and Section 2.323 Are Incompatible The incompatibility of the timing requirements of ISO Section C and 10 C.F.R. 2.323 further demonstrates clear and material error. The Order (at 3 and 4) states that the ISO did not expand or waive either the 10-day limit, or the 10-day response time contained in Sections 2.323(a) and (c). However, ISO Section C allows parties to file Answers to dispositive motions within 20 days -- that provision conflicts with the Boards Order (at 4), which sets the time to file Answers at 10 days as specified in Section 2.323(c). Clearly, ISO Section C also modified the timing of responses to dispositive motions. Similarly, the requirement in ISO Section C to file answers to dispositive motions within 20 days would exceed the time to prepare a dispositive motion under the Boards Order (at 4), because the Order applies the 10 day trigger in Section 2.323(a) established for general motions, to dispositive motions. It would be inequitable to allow a party twice as long to respond to a motion compared to the amount of time given to prepare such a motion.25 The January 10 Order confuses these timing requirements going forward.

24 The result is the same regarding motions for summary disposition, which were filed, and ruled upon, without regard to the timing requirement of 10 C.F.R. § 2.323(a). See, e.g., Applicants Motion for Summary Disposition of Riverkeeper Technical Contention 2 (Flow-Accelerated Corrosion), Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) (July 26, 2010) (unpublished), denied on the merits by Memorandum and Order (Ruling on Entergys Motion for Summary Disposition of Riverkeeper TC-2 (Flow-Accelerated Corrosion) (Nov. 4, 2010) (unpublished); AmerGen Energy Company, LLC Motion for Summary Disposition on Citizens Drywell Contention (Mar. 30, 2007) (unpublished), denied on the merits by Memorandum and Order (Denying AmerGens Motion for Summary Disposition) (June 19, 2007)

(unpublished); Entergys Motion for Summary Disposition of New England Coalitions Contention 3 (Steam Dryer), Entergy Nuclear Vermont Yankee LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station) (Apr. 19, 2007) (unpublished), granted by Memorandum and Order (Ruling on Motion for Summary Disposition of NEC Contention 3) (Sept. 11, 2007) (unpublished).

25 It also may be impracticable to file a summary disposition motion, with its requirement for an affidavit and statement of material facts that are not in dispute within ten days of new information. This will particularly be the case when the moving party is not the party preparing the underlying new information.

6

D. Allowing Intervenors Not to Refile Contention 1 after the DSEIS is Incompatible with ISO Section B.1.

Although not central to the holding on timeliness of the Motion to Dismiss, footnote 32 of the Board Order (at 6) also is incompatible with the ISO. That footnote states that: Joint Intervenors will not be required to refile Contention 1 in order to challenge the NRC Staffs treatment of the same issues in the DSEIS, and cites to another Boards order as the sole support.26 However, ISO Section B.1 limits Intervenors to 60 days from the availability of new information to amend a contention.

The NRC Staff has indicated that it intends to consider in the DSEIS the in-depth alternatives presented in FENOCs Revised ER.27 Order footnote 32 anticipates this consideration when it states that there will be treatment of the same issues in the DSEIS. Yet, footnote 32 contravenes ISO Section B.1 not only by ignoring the original 60-day deadline, but also by waiving Intervenors obligation to file an amended contention based on new information in the DSEIS.28 This is a clear and material error that, because of the plain language of ISO Section B.1, FENOC could not have reasonably anticipated. To not correct this ruling would allow the parties to go to hearing on issues that may be mooted in the DSEIS, resulting in a waste of the parties and the Boards resources.

26 The Board cites to and quotes from Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation),

LBP-01-23, 54 NRC 163, 172 n.3 (2001). The Board appears to have intended to cite LBP-01-26, 54 N.R.C.

199, 208 (2001).

27 See Letter to B. Allen, FENOC, from M. Galloway, NRC, Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (October 31, 2011), available at ADAMS Accession No. ML11256A164.

28 It would be inappropriate convert the issuance of the DSEIS into a second trigger date from which to timely file an amended contention on the same information published months prior in FENOCs ER Revision.

7

IV. CONCLUSION The Board made a clear and material error in its Order declaring that the Motion to Dismiss and responsive filings were not timely. ISO Section C carved out exceptions to the timing requirements in Section 2.323(a) and (c), and the parties relied on those exceptions. The Motion to Dismiss, and the Intervenors and Staffs responses all were filed consistent with FENOCs understanding of the timing requirements related to dispositive motions in ISO Section C. In light of Section C, and well established adjudicatory practice on Motions to Dismiss, FENOC could not have reasonably anticipated that the Board would reject its Motion as not timely, which renders the Order, based solely on timeliness, invalid. Additionally, the Board should clarify the Intervenors obligation with respect to filing new or amended contentions.

Accordingly, the Board should reconsider its Order.

Respectfully submitted, Signed (electronically) by Timothy P. Matthews Kathryn M. Sutton Timothy P. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: 202-739-5527 E-mail: tmathews@morganlewis.com David W. Jenkins Senior Corporate Counsel FirstEnergy Service Company Mailstop: A-GO-15 76 South Main Street Akron, OH 44308 Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FENOC 8

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) January 13, 2012

)

CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of:

1. FENOCS MOTION FOR LEAVE TO FILE A MOTION FOR RECONSIDERATION OF THE BOARDS JANUARY 10 ORDER, and;
2. FENOCS MOTION FOR RECONSIDERATION OF THE BOARDS JANUARY 10 ORDER were filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients.

Administrative Judge Administrative Judge William J. Froehlich, Chair Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: wjf1@nrc.gov E-mail: nicholas.trikouros@nrc.gov Administrative Judge Office of the General Counsel Dr. William E. Kastenberg U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Mail Stop O-15D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Edward L. Williamson E-mail: wek1@nrc.gov Lloyd B. Subin Brian G. Harris

Richard S. Harper Office of the Secretary Brian P. Newell U.S. Nuclear Regulatory Commission Catherine E. Kanatas Rulemakings and Adjudications Staff edward.williamson@nrc.gov; Washington, DC 20555-0001 lloyd.subin@nrc.gov; E-mail: hearingdocket@nrc.gov brian.harris@nrc.gov; richard.harper@nrc.gov; brian.newell@nrc.gov; catherine.kanatas@nrc.gov Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Michael Keegan Dont Waste Michigan 811 Harrison Street Kevin Kamps Monroe, MI 48161 Paul Gunter E-mail: mkeeganj@comcast.net Beyond Nuclear 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org; Terry J. Lodge paul@beyondnuclear.org 316 N. Michigan St., Ste. 520 Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Timothy P. Matthews Timothy P. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue., N.W.

Washington, DC 20004 Phone: 202-739-5527 Fax: 202-739-3001 E-mail: tmatthews@morganlewis.com DB1/ 68852663.4 2