ML12065A174: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Shutdown Bank Insertion Limits 3.1.5 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR APPLICABILITY:
{{#Wiki_filter:Shutdown Bank Insertion Limits 3.1.5 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5             Each shutdown bank shall be within insertion limits specified in the COLR APPLICABILITY:       MODE 1, MODE 2 with any control bank not fully inserted.
MODE 1, MODE 2 with any control bank not fully inserted.----------
                      ----------                         NOTE--
N-T----------------
N-T----------------
NOTE--This LCO is not applicable while performing SR 3.1.4.2.ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME TIME A. One or more shutdown A.1.1 Verify SDM to be within 1 hour banks not within limits, the limits provided in the COLR.OR A.1.2 Initiate boration to restore 1 hour SDM to within limit.AND A.2 Restore shutdown banks 2 hours to within limits.B. Required Action and B.1 Be in MODE 3. 6 hours associated Completion Time not met.CALLAWAY PLANT 3.1-11 Amendment No. 133 A1 6 F" Shutdown Bank Insertion Limits 3.t.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each shutdown bank is within the limits 12 hours specified in the COLR.LA~~L rT~kT'L" 'LLP.VVM.T FPLANTAn.I-I/-Amendment No. 133 Control Bank Insertion Limits 3.1.6 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.APPLICABILITY:
This LCO is not applicable while performing SR 3.1.4.2.
MODE 1, MODE 2 with keff > 1.0.-- -------- NOTE --This LCO is not applicable while performing SR 3.1.4.2.ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME TIME A. Control bank insertion limits A.1.1 Verify SDM to be within 1 hour not met. the limits provided in the COLR.OR A.1.2 Initiate boration to restore 1 hour SDM to within limit.AND A.2 Restore control bank(s) to 2 hours within limits.(continued)
ACTIONS COMPLETION TIME CONDITION                       REQUIRED ACTION                           TIME A. One or more shutdown           A.1.1       Verify SDM to be within       1 hour banks not within limits,                 the limits provided in the COLR.
CALLAWAY PLANT ,5.1- Amendment No. 133 Control Bank Insertion Limits 3.1ý:6 ACTIONS (continued),CONDITION REQUIRED ACTION COMPLETION TIME B. Control bank sequence or B.1.1 Verify SDM to be within 1 hour overlap limits not met. the limits provided in the COLR.OR B.1.2 Initiate boration to restore 1 hour SDM to within limit.AND B.2 Restore control bank 2 hour sequence and overlap to within limits.C. Required Action and C.1 Be in MODE 3. 6 hours associated Completion Time not met.-SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify estimated critical control bank position is within Within 4 hours the limits specified in the COLR. prior to achieving criticality SR 3.1.6.2 Verify each control bank insertion is within the limits 12 hours specified in the COLR.(continued)
OR A.1.2       Initiate boration to restore 1 hour limit.
CALLAWAY PLANTA ID. t- L+Amendment No. 133 Control Bank Insertion Limits 3.1.6 SURVEILLANCE REQUIREMENTS (continued)
SDM to within AND A.2         Restore shutdown banks       2 hours to within limits.
SURVEILLANCE FREQUENCY SR 3.1.6.3 Verify sequence and overlap limits specified in the 12 hours COLR are met for control banks not fully withdrawn from the core.CALLK\f\!AY PLANT 3.I-15 Amendment No. 133}}
B. Required Action and             B.1         Be in MODE 3.                 6 hours associated Completion Time not met.
CALLAWAY PLANT                               3.1-11                           Amendment No. 133 A16
 
F" Shutdown Bank Insertion Limits 3.t.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.1.5.1       Verify each shutdown bank is within the limits         12 hours specified in the COLR.
LA~~L             rT~kT'
                                              .I-I/-
L"           FPLANTAn
        'LLP.VVM.T                                                         Amendment No. 133
 
Control Bank Insertion Limits 3.1.6 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Control Bank Insertion Limits LCO 3.1.6           Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.
APPLICABILITY:       MODE 1, MODE 2 with keff > 1.0.
                              --       --------             NOTE         --
This LCO is not applicable while performing SR 3.1.4.2.
ACTIONS COMPLETION TIME CONDITION                           REQUIRED ACTION                           TIME A. Control bank insertion limits   A.1.1           Verify SDM to be within       1 hour not met.                                       the limits provided in the COLR.
OR A.1.2           Initiate boration to restore 1 hour SDM to within limit.
AND A.2             Restore control bank(s) to 2 hours within limits.
(continued)
CALLAWAY PLANT                                   ,5.1- t*                          Amendment No. 133
 
Control Bank Insertion Limits 3.1ý:6 ACTIONS (continued)
            ,CONDITION                       REQUIRED ACTION                         COMPLETION TIME B. Control bank sequence or         B.1.1         Verify SDM to be within       1 hour overlap limits not met.                         the limits provided in the COLR.
OR B.1.2         Initiate boration to restore 1 hour SDM to within limit.
AND B.2           Restore control bank         2 hour sequence and overlap to within limits.
C. Required Action and             C.1           Be in MODE 3.                 6 hours associated Completion Time not met.
-SURVEILLANCE REQUIREMENTS SURVEILLANCE                                             FREQUENCY SR 3.1.6.1       Verify estimated critical control bank position is within       Within 4 hours the limits specified in the COLR.                               prior to achieving criticality SR 3.1.6.2       Verify each control bank insertion is within the limits         12 hours specified in the COLR.
(continued)
CALLAWAY PLANTA                               ID. t- L+
Amendment No. 133
 
Control Bank Insertion Limits 3.1.6 SURVEILLANCE REQUIREMENTS         (continued)
SURVEILLANCE                                       FREQUENCY SR 3.1.6.3       Verify sequence and overlap limits specified in the       12 hours COLR are met for control banks not fully withdrawn from the core.
CALLK\f\!AY PLANT                         3.I-15                         Amendment No. 133}}

Latest revision as of 08:12, 12 November 2019

3.1 Reactivity Control Systems, 3.1.5 Shutdown Bank Insertion Levels
ML12065A174
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/01/2012
From:
NRC Region 4
To:
References
FOIA/PA-2012-0110
Download: ML12065A174 (5)


Text

Shutdown Bank Insertion Limits 3.1.5 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR APPLICABILITY: MODE 1, MODE 2 with any control bank not fully inserted.


NOTE--

N-T----------------

This LCO is not applicable while performing SR 3.1.4.2.

ACTIONS COMPLETION TIME CONDITION REQUIRED ACTION TIME A. One or more shutdown A.1.1 Verify SDM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> banks not within limits, the limits provided in the COLR.

OR A.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limit.

SDM to within AND A.2 Restore shutdown banks 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within limits.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

CALLAWAY PLANT 3.1-11 Amendment No. 133 A16

F" Shutdown Bank Insertion Limits 3.t.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each shutdown bank is within the limits 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> specified in the COLR.

LA~~L rT~kT'

.I-I/-

L" FPLANTAn

'LLP.VVM.T Amendment No. 133

Control Bank Insertion Limits 3.1.6 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.

APPLICABILITY: MODE 1, MODE 2 with keff > 1.0.

-- -------- NOTE --

This LCO is not applicable while performing SR 3.1.4.2.

ACTIONS COMPLETION TIME CONDITION REQUIRED ACTION TIME A. Control bank insertion limits A.1.1 Verify SDM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not met. the limits provided in the COLR.

OR A.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SDM to within limit.

AND A.2 Restore control bank(s) to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> within limits.

(continued)

CALLAWAY PLANT ,5.1- t* Amendment No. 133

Control Bank Insertion Limits 3.1ý:6 ACTIONS (continued)

,CONDITION REQUIRED ACTION COMPLETION TIME B. Control bank sequence or B.1.1 Verify SDM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> overlap limits not met. the limits provided in the COLR.

OR B.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SDM to within limit.

AND B.2 Restore control bank 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> sequence and overlap to within limits.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

-SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify estimated critical control bank position is within Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the limits specified in the COLR. prior to achieving criticality SR 3.1.6.2 Verify each control bank insertion is within the limits 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> specified in the COLR.

(continued)

CALLAWAY PLANTA ID. t- L+

Amendment No. 133

Control Bank Insertion Limits 3.1.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.6.3 Verify sequence and overlap limits specified in the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> COLR are met for control banks not fully withdrawn from the core.

CALLK\f\!AY PLANT 3.I-15 Amendment No. 133