ML12342A377: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 9: | Line 9: | ||
| docket = PROJ0689 | | docket = PROJ0689 | ||
| license number = | | license number = | ||
| contact person = Rowley J | | contact person = Rowley J | ||
| case reference number = TAC ME5291 | | case reference number = TAC ME5291 | ||
| package number = ML12342A368 | | package number = ML12342A368 | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:March 19, 2013 | {{#Wiki_filter:March 19, 2013 Jim Riley Nuclear Energy Institute 1201 F Street, NW, Suite 1100 Washington, DC 20004-1217 | ||
Jim Riley | |||
Nuclear Energy Institute | |||
1201 F Street, NW, Suite 1100 Washington, DC | |||
==SUBJECT:== | ==SUBJECT:== | ||
FINAL SAFETY EVALUATION OF NUCLEAR ENERGY INSTITUTE TOPICAL REPORT NEI 09-10, REVISION 1a, | FINAL SAFETY EVALUATION OF NUCLEAR ENERGY INSTITUTE TOPICAL REPORT NEI 09-10, REVISION 1a, GUIDELINES FOR EFFECTIVE PREVENTION AND MANAGEMENT OF SYSTEM GAS ACCUMULATION (TAC NO. ME5291) | ||
==Dear Mr. Riley:== | ==Dear Mr. Riley:== | ||
By letter dated December 21, 2010 (Agencywide Documents Access and Management System Accession No. ML110240120), the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval Topical Report (TR) NEI 09-10, Revision 1a, | By letter dated December 21, 2010 (Agencywide Documents Access and Management System Accession No. ML110240120), the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval Topical Report (TR) NEI 09-10, Revision 1a, Guidelines for Effective Prevention and Management of System Gas Accumulation. This letter transmits the NRC staffs final safety evaluation (SE) of the TR. | ||
The NRC staff has found that TR NEI 09-10, Revision 1a, is acceptable for referencing in licensing applications to the extent specified and under the limitations and conditions delineated in the TR and in the enclosed final SE. The final SE defines the basis for acceptance of the TR. | |||
The NRC staff has found that TR NEI 09-10, Revision 1a, is acceptable for referencing in licensing applications to the extent specified and under the limitations and conditions delineated in the TR and in the enclosed final SE. The final SE defines the basis for acceptance of the TR. | Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards. | ||
In accordance with the guidance provided on the NRC website, we request that NEI publish accepted proprietary and non-proprietary versions of this TR within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed final SE after the title page. Also, they must contain historical review information, including NRC requests for additional information and your responses. The accepted versions shall include a "-A" (designating accepted) following the TR identification symbol. | |||
Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards. | |||
In accordance with the guidance provided on the NRC website, we request that NEI publish accepted proprietary and non-proprietary versions of this TR within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed final SE after the title page. Also, they must contain historical review information, including NRC requests for additional information and your responses. The accepted versions shall include a "-A" (designating accepted) following the TR identification symbol. | |||
Project No. 689 | J. Riley If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing. | ||
Sincerely, | |||
/RA/ | |||
Sher Bahadur, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 | |||
==Enclosure:== | ==Enclosure:== | ||
Final SE | Final SE | ||
ML12342A368 (Package); ML12342A377 (Letter); | ML12342A368 (Package); ML12342A377 (Letter); | ||
ML12342A379 (Enclosure) NRR-043 OFFICE DPR/PLPB/PM DPR/PLPB/LA DSS/SRXB/BC DPR/PLPB/BC DPR/DD NAME JRowley DBaxley CJackson AMendiola SBahadur DATE 12/11/2012 2/22/2013 03/11/2013 03/13/2013 03/19/2013}} |
Latest revision as of 19:04, 11 November 2019
ML12342A377 | |
Person / Time | |
---|---|
Site: | Nuclear Energy Institute |
Issue date: | 03/19/2013 |
From: | Bahadur S Division of Policy and Rulemaking |
To: | Jeffrey Riley Nuclear Energy Institute |
Rowley J | |
Shared Package | |
ML12342A368 | List: |
References | |
TAC ME5291 | |
Download: ML12342A377 (3) | |
Text
March 19, 2013 Jim Riley Nuclear Energy Institute 1201 F Street, NW, Suite 1100 Washington, DC 20004-1217
SUBJECT:
FINAL SAFETY EVALUATION OF NUCLEAR ENERGY INSTITUTE TOPICAL REPORT NEI 09-10, REVISION 1a, GUIDELINES FOR EFFECTIVE PREVENTION AND MANAGEMENT OF SYSTEM GAS ACCUMULATION (TAC NO. ME5291)
Dear Mr. Riley:
By letter dated December 21, 2010 (Agencywide Documents Access and Management System Accession No. ML110240120), the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval Topical Report (TR) NEI 09-10, Revision 1a, Guidelines for Effective Prevention and Management of System Gas Accumulation. This letter transmits the NRC staffs final safety evaluation (SE) of the TR.
The NRC staff has found that TR NEI 09-10, Revision 1a, is acceptable for referencing in licensing applications to the extent specified and under the limitations and conditions delineated in the TR and in the enclosed final SE. The final SE defines the basis for acceptance of the TR.
Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.
In accordance with the guidance provided on the NRC website, we request that NEI publish accepted proprietary and non-proprietary versions of this TR within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed final SE after the title page. Also, they must contain historical review information, including NRC requests for additional information and your responses. The accepted versions shall include a "-A" (designating accepted) following the TR identification symbol.
J. Riley If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.
Sincerely,
/RA/
Sher Bahadur, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689
Enclosure:
Final SE
ML12342A368 (Package); ML12342A377 (Letter);
ML12342A379 (Enclosure) NRR-043 OFFICE DPR/PLPB/PM DPR/PLPB/LA DSS/SRXB/BC DPR/PLPB/BC DPR/DD NAME JRowley DBaxley CJackson AMendiola SBahadur DATE 12/11/2012 2/22/2013 03/11/2013 03/13/2013 03/19/2013