{{#Wiki_filter:Irv--I/P & PulcI 2 Decommissioning Status-Progress License Termination Plan Review Update and RAI Discussion Decommissioning Status-Next year activities 20.2002 Exemption Shipments-3rd exemption water shipments 3 D~ecom iso igSau Progress to Date-Turbine building to grade-Waste processing to U S Ecology, Energy Solutions, and WCS.-Suppression pool downcomers removed-Off gas tunnel, LRW tunnel, and stack systems removed-GTCC placed in the ISFSI-CRDM removal in progress-Vessel internals segmentation complete-Support staff relocated to College of Redwoods-Contract in place with CB&I -in planning phase a 4LTP Review Status Any progress report from NRC-% complete?-Anticipated date for approval?-General feedback-RAI discussion Decommissioning Status (cont.)Next Year Activities-Reactor pressure vessel segmentation-Slurry wall pre-trenching-Spent fuel pool liner removal-Discharge canal remediation-Liquid radwaste building to grade (early 2015)-Complete valve gallery systems removal-Complete access shaft systems removal aDeommisionng tatus (cont.)Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs area FSS of ISFSI scheduled for this month Groundwater Activities Four new wells installed Two more new wells scheduled for this month Will demolish wells to be affected by slurry wall installation this month 72O 2OO2 Exemptio Shipments Third request included water shipments to US Ecology Last discharge to liquid radwaste canal this month Major water shipping campaign will be when the spent fuel pool is drained Based on in-leakage to the caisson during the rainy season, some water shipment could occur as early as the first quarter of 2014}}
{{#Wiki_filter:Irv-
-I/P     & PulcI
 
2 Decommissioning Status
    -Progress License Termination Plan Review Update and RAI Discussion Decommissioning Status
    -Next year activities 20.2002 Exemption Shipments
    -3rd exemption water shipments
 
3 D~ecom         iso       igSau Progress to Date
  -Turbine building to grade
  -Waste processing to U S Ecology, Energy Solutions, and WCS.
  -Suppression pool downcomers removed
  -Off gas tunnel, LRW tunnel, and stack systems removed
  -GTCC placed in the ISFSI
  -CRDM removal in progress
  -Vessel internals segmentation complete
  -Support staff relocated to College of Redwoods
  -Contract in place with CB&I - in planning phase
 
a                                   4
* LTP Review Status Any progress report from NRC
    -% complete?
    -Anticipated date for approval?
    -General feedback
    -RAI discussion
* Decommissioning Status (cont.)
Next Year Activities
      -Reactor pressure vessel segmentation
      -Slurry wall pre-trenching
      -Spent fuel pool liner removal
      -Discharge canal remediation
      -Liquid radwaste building to grade (early 2015)
      -Complete valve gallery systems removal
      -Complete access shaft systems removal
 
a
* Deommisionng              tatus (cont.)
Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs area FSS of ISFSI scheduled for this month Groundwater Activities Four new wells installed Two more new wells scheduled for this month Will demolish wells to be affected by slurry wall installation this month
 
7
* 2O 2OO2 Exemptio                 Shipments Third request included water shipments to US Ecology Last discharge to liquid radwaste canal this month Major water shipping campaign will be when the spent fuel pool is drained Based on in-leakage to the caisson during the rainy season, some water shipment could occur as early as the first quarter of 2014}}

Latest revision as of 11:03, 4 November 2019

Presentation Slides from NRC / PG&E December 5, 2013, Public Meeting on Humboldt Bay Power Plant License Termination Plan
ML13353A588
Person / Time
Site: Humboldt Bay
Issue date: 12/05/2013
From:
PG&E Corp
To:
NRC/FSME
References
Download: ML13353A588 (7)


Text

Irv-

-I/P & PulcI

2 Decommissioning Status

-Progress License Termination Plan Review Update and RAI Discussion Decommissioning Status

-Next year activities 20.2002 Exemption Shipments

-3rd exemption water shipments

3 D~ecom iso igSau Progress to Date

-Turbine building to grade

-Waste processing to U S Ecology, Energy Solutions, and WCS.

-Suppression pool downcomers removed

-Off gas tunnel, LRW tunnel, and stack systems removed

-GTCC placed in the ISFSI

-CRDM removal in progress

-Vessel internals segmentation complete

-Support staff relocated to College of Redwoods

-Contract in place with CB&I - in planning phase

a 4

  • LTP Review Status Any progress report from NRC

-% complete?

-Anticipated date for approval?

-General feedback

-RAI discussion

  • Decommissioning Status (cont.)

Next Year Activities

-Reactor pressure vessel segmentation

-Slurry wall pre-trenching

-Spent fuel pool liner removal

-Discharge canal remediation

-Liquid radwaste building to grade (early 2015)

-Complete valve gallery systems removal

-Complete access shaft systems removal

a

  • Deommisionng tatus (cont.)

Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs area FSS of ISFSI scheduled for this month Groundwater Activities Four new wells installed Two more new wells scheduled for this month Will demolish wells to be affected by slurry wall installation this month

7

  • 2O 2OO2 Exemptio Shipments Third request included water shipments to US Ecology Last discharge to liquid radwaste canal this month Major water shipping campaign will be when the spent fuel pool is drained Based on in-leakage to the caisson during the rainy season, some water shipment could occur as early as the first quarter of 2014