{{#Wiki_filter:Irv--I/P & PulcI 2Decommissioning Status-Progress License Termination Plan Review Update and RAIDiscussion Decommissioning Status-Next year activities 20.2002 Exemption Shipments
{{#Wiki_filter:Irv-
-3rd exemption water shipments 3D~ecom iso igSauProgress to Date-Turbine building to grade-Waste processing to U S Ecology, EnergySolutions, and WCS.-Suppression pool downcomers removed-Off gas tunnel, LRW tunnel, and stack systemsremoved-GTCC placed in the ISFSI-CRDM removal in progress-Vessel internals segmentation complete-Support staff relocated to College of Redwoods-Contract in place with CB&I -in planning phase a4LTP Review StatusAny progress report from NRC-% complete?
-I/P     & PulcI
-Anticipated date for approval?
 
-General feedback-RAI discussion Decommissioning Status (cont.)Next Year Activities
2 Decommissioning Status
-Reactor pressure vessel segmentation
    -Progress License Termination Plan Review Update and RAI Discussion Decommissioning Status
-Slurry wall pre-trenching
    -Next year activities 20.2002 Exemption Shipments
-Spent fuel pool liner removal-Discharge canal remediation
    -3rd exemption water shipments
-Liquid radwaste building to grade (early 2015)-Complete valve gallery systems removal-Complete access shaft systems removal aDeommisionng tatus (cont.)Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs areaFSS of ISFSI scheduled for this monthGroundwater Activities Four new wells installed Two more new wells scheduled for this monthWill demolish wells to be affected by slurry wallinstallation this month 72O 2OO2 Exemptio Shipments Third request included water shipments to USEcologyLast discharge to liquid radwaste canal this monthMajor water shipping campaign will be when the spentfuel pool is drainedBased on in-leakage to the caisson during the rainyseason, some water shipment could occur as earlyas the first quarter of 2014}}
 
3 D~ecom         iso       igSau Progress to Date
  -Turbine building to grade
  -Waste processing to U S Ecology, Energy Solutions, and WCS.
  -Suppression pool downcomers removed
  -Off gas tunnel, LRW tunnel, and stack systems removed
  -GTCC placed in the ISFSI
  -CRDM removal in progress
  -Vessel internals segmentation complete
  -Support staff relocated to College of Redwoods
  -Contract in place with CB&I - in planning phase
 
a                                  4
* LTP Review Status Any progress report from NRC
    -% complete?
    -Anticipated date for approval?
    -General feedback
    -RAI discussion
* Decommissioning Status (cont.)
Next Year Activities
      -Reactor pressure vessel segmentation
      -Slurry wall pre-trenching
      -Spent fuel pool liner removal
      -Discharge canal remediation
      -Liquid radwaste building to grade (early 2015)
      -Complete valve gallery systems removal
      -Complete access shaft systems removal
 
a
* Deommisionng              tatus (cont.)
Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs area FSS of ISFSI scheduled for this month Groundwater Activities Four new wells installed Two more new wells scheduled for this month Will demolish wells to be affected by slurry wall installation this month
 
7
* 2O 2OO2 Exemptio                 Shipments Third request included water shipments to US Ecology Last discharge to liquid radwaste canal this month Major water shipping campaign will be when the spent fuel pool is drained Based on in-leakage to the caisson during the rainy season, some water shipment could occur as early as the first quarter of 2014}}

Latest revision as of 11:03, 4 November 2019

Presentation Slides from NRC / PG&E December 5, 2013, Public Meeting on Humboldt Bay Power Plant License Termination Plan
ML13353A588
Person / Time
Site: Humboldt Bay
Issue date: 12/05/2013
From:
PG&E Corp
To:
NRC/FSME
References
Download: ML13353A588 (7)


Text

Irv-

-I/P & PulcI

2 Decommissioning Status

-Progress License Termination Plan Review Update and RAI Discussion Decommissioning Status

-Next year activities 20.2002 Exemption Shipments

-3rd exemption water shipments

3 D~ecom iso igSau Progress to Date

-Turbine building to grade

-Waste processing to U S Ecology, Energy Solutions, and WCS.

-Suppression pool downcomers removed

-Off gas tunnel, LRW tunnel, and stack systems removed

-GTCC placed in the ISFSI

-CRDM removal in progress

-Vessel internals segmentation complete

-Support staff relocated to College of Redwoods

-Contract in place with CB&I - in planning phase

a 4

  • LTP Review Status Any progress report from NRC

-% complete?

-Anticipated date for approval?

-General feedback

-RAI discussion

  • Decommissioning Status (cont.)

Next Year Activities

-Reactor pressure vessel segmentation

-Slurry wall pre-trenching

-Spent fuel pool liner removal

-Discharge canal remediation

-Liquid radwaste building to grade (early 2015)

-Complete valve gallery systems removal

-Complete access shaft systems removal

a

  • Deommisionng tatus (cont.)

Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs area FSS of ISFSI scheduled for this month Groundwater Activities Four new wells installed Two more new wells scheduled for this month Will demolish wells to be affected by slurry wall installation this month

7

  • 2O 2OO2 Exemptio Shipments Third request included water shipments to US Ecology Last discharge to liquid radwaste canal this month Major water shipping campaign will be when the spent fuel pool is drained Based on in-leakage to the caisson during the rainy season, some water shipment could occur as early as the first quarter of 2014