| {{#Wiki_filter:Irv--I/P & PulcI 2Decommissioning Status-Progress License Termination Plan Review Update and RAIDiscussion Decommissioning Status-Next year activities 20.2002 Exemption Shipments | | {{#Wiki_filter:Irv- |
| -3rd exemption water shipments 3D~ecom iso igSauProgress to Date-Turbine building to grade-Waste processing to U S Ecology, EnergySolutions, and WCS.-Suppression pool downcomers removed-Off gas tunnel, LRW tunnel, and stack systemsremoved-GTCC placed in the ISFSI-CRDM removal in progress-Vessel internals segmentation complete-Support staff relocated to College of Redwoods-Contract in place with CB&I -in planning phase a4LTP Review StatusAny progress report from NRC-% complete? | | -I/P & PulcI |
| -Anticipated date for approval? | | |
| -General feedback-RAI discussion Decommissioning Status (cont.)Next Year Activities | | 2 Decommissioning Status |
| -Reactor pressure vessel segmentation | | -Progress License Termination Plan Review Update and RAI Discussion Decommissioning Status |
| -Slurry wall pre-trenching | | -Next year activities 20.2002 Exemption Shipments |
| -Spent fuel pool liner removal-Discharge canal remediation | | -3rd exemption water shipments |
| -Liquid radwaste building to grade (early 2015)-Complete valve gallery systems removal-Complete access shaft systems removal aDeommisionng tatus (cont.)Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs areaFSS of ISFSI scheduled for this monthGroundwater Activities Four new wells installed Two more new wells scheduled for this monthWill demolish wells to be affected by slurry wallinstallation this month 72O 2OO2 Exemptio Shipments Third request included water shipments to USEcologyLast discharge to liquid radwaste canal this monthMajor water shipping campaign will be when the spentfuel pool is drainedBased on in-leakage to the caisson during the rainyseason, some water shipment could occur as earlyas the first quarter of 2014}} | | |
| | 3 D~ecom iso igSau Progress to Date |
| | -Turbine building to grade |
| | -Waste processing to U S Ecology, Energy Solutions, and WCS. |
| | -Suppression pool downcomers removed |
| | -Off gas tunnel, LRW tunnel, and stack systems removed |
| | -GTCC placed in the ISFSI |
| | -CRDM removal in progress |
| | -Vessel internals segmentation complete |
| | -Support staff relocated to College of Redwoods |
| | -Contract in place with CB&I - in planning phase |
| | |
| | a 4 |
| | * LTP Review Status Any progress report from NRC |
| | -% complete? |
| | -Anticipated date for approval? |
| | -General feedback |
| | -RAI discussion |
| | * Decommissioning Status (cont.) |
| | Next Year Activities |
| | -Reactor pressure vessel segmentation |
| | -Slurry wall pre-trenching |
| | -Spent fuel pool liner removal |
| | -Discharge canal remediation |
| | -Liquid radwaste building to grade (early 2015) |
| | -Complete valve gallery systems removal |
| | -Complete access shaft systems removal |
| | |
| | a |
| | * Deommisionng tatus (cont.) |
| | Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs area FSS of ISFSI scheduled for this month Groundwater Activities Four new wells installed Two more new wells scheduled for this month Will demolish wells to be affected by slurry wall installation this month |
| | |
| | 7 |
| | * 2O 2OO2 Exemptio Shipments Third request included water shipments to US Ecology Last discharge to liquid radwaste canal this month Major water shipping campaign will be when the spent fuel pool is drained Based on in-leakage to the caisson during the rainy season, some water shipment could occur as early as the first quarter of 2014}} |
Latest revision as of 11:03, 4 November 2019
Presentation Slides from NRC / PG&E December 5, 2013, Public Meeting on Humboldt Bay Power Plant License Termination PlanML13353A588 |
Person / Time |
---|
Site: |
Humboldt Bay |
---|
Issue date: |
12/05/2013 |
---|
From: |
PG&E Corp |
---|
To: |
NRC/FSME |
---|
References |
---|
Download: ML13353A588 (7) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML21281A1672021-10-0808 October 2021 ISFSI Pre-Application Meeting Presentation by Pacific Gas & Electric for License Amendment Request to Revise the License and Technical Specifications (Final) ML19268A1802019-08-26026 August 2019 Shoreline Erosion at the Humboldt Bay Power Plant, Handout Used by Aldaron Laird at the Public Hearing on the Nuclear Energy Innovation and Modernization Act, Held in Eureka California, on August 26, 2019 ML13353A5882013-12-0505 December 2013 Presentation Slides from NRC / PG&E December 5, 2013, Public Meeting on Humboldt Bay Power Plant License Termination Plan ML13353A5912013-12-0505 December 2013 Presentation Slides from Nrc/Pg&E December 5, 2013, Public Meeting on Humboldt Bay Power Plant Emergency Plan ML13267A1432013-08-20020 August 2013 Presentation Slides from August 20, 2013 Public Meeting on the Humboldt Bay Power Plant License Termination Plan ML1021803722010-07-29029 July 2010 Presentation Slides from July 29, 2010, Meeting with Humboldt Bay Power Plant ML0705403902007-02-21021 February 2007 Slides from Nrc/Pg&E Meeting Regarding the Humboldt Bay Power Plant, Impact of New Generation Plant on License Termination ML0526602452005-09-23023 September 2005 Summary of the Category 1 Public Meeting Held on September 15, 2005, to Discuss the Findings of the Special Inspection Into the Loss of Special Nuclear Material at Humboldt Bay Power Plant ML0516505052005-06-13013 June 2005 Presentation Slides from June 13, 2005, NRC / PG&E Meeting on Humboldt Bay Power Plant Special Nuclear Material Control & Accountability Project ML0320605412003-04-0303 April 2003 Attachment 2 (Handouts) to 07/24/03 Meeting with Pacific Gas and Electric Company Regarding a Proposed Independent Spent Fuel Storage Installation at Humboldt Bay 72-27 (TAC L23589) 2021-10-08
[Table view] Category:Slides and Viewgraphs
MONTHYEARML21281A1672021-10-0808 October 2021 ISFSI Pre-Application Meeting Presentation by Pacific Gas & Electric for License Amendment Request to Revise the License and Technical Specifications (Final) ML21271A1392021-09-28028 September 2021 ISFSI Pre-Application Meeting Presentation by Pacific Gas & Electric for License Amendment Request to Revise the License and Technical Specifications ML19268A1802019-08-26026 August 2019 Shoreline Erosion at the Humboldt Bay Power Plant, Handout Used by Aldaron Laird at the Public Hearing on the Nuclear Energy Innovation and Modernization Act, Held in Eureka California, on August 26, 2019 ML19233A0862019-08-26026 August 2019 NEIMA Meeting Slides Public ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) ML17160A0842014-11-19019 November 2014 Slides from Nrc/Pg&E Public Meeting on Humboldt Bay Plant Decommissioning and License Termination Dated November 19, 2014 ML13353A5882013-12-0505 December 2013 Presentation Slides from NRC / PG&E December 5, 2013, Public Meeting on Humboldt Bay Power Plant License Termination Plan ML13353A5912013-12-0505 December 2013 Presentation Slides from Nrc/Pg&E December 5, 2013, Public Meeting on Humboldt Bay Power Plant Emergency Plan ML13267A1432013-08-20020 August 2013 Presentation Slides from August 20, 2013 Public Meeting on the Humboldt Bay Power Plant License Termination Plan ML13227A1102013-08-13013 August 2013 8/13/13 Michael F. Weber, Deputy Executive Director for Materials, Waste, Research, State, Tribal, and Compliance Programs Testimony on: the U.S. Nrc'S Power Reactor Decommissioning Process ML1106705272011-03-0707 March 2011 Presentation Slides from March 7, 2011, Meeting with Humboldt Bay Power Plant Unit 3, on Decommissioning, License Termination, & Alternate Disposal Exemption Request ML1021803722010-07-29029 July 2010 Presentation Slides from July 29, 2010, Meeting with Humboldt Bay Power Plant ML0729803222007-10-23023 October 2007 Meeting Slides, Humboldt Bay Power Plant, Decommissioning Plans Schedule and Issues Meeting ML0705403902007-02-21021 February 2007 Slides from Nrc/Pg&E Meeting Regarding the Humboldt Bay Power Plant, Impact of New Generation Plant on License Termination ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0516505052005-06-13013 June 2005 Presentation Slides from June 13, 2005, NRC / PG&E Meeting on Humboldt Bay Power Plant Special Nuclear Material Control & Accountability Project ML0502102642005-01-19019 January 2005 Presentation Slides from 1/19/05 Meeting with Pacific Gas and Electric on Humboldt Bay Power Plant Special Nuclear Material Control and Accountability Project ML0411901422004-04-29029 April 2004 Slides from Meeting with Pacific Gas & Electric and Holtec Regarding Plans Related to the Installation of a Single-Failure-Proof Crane at Humboldt Bay ML0320605412003-04-0303 April 2003 Attachment 2 (Handouts) to 07/24/03 Meeting with Pacific Gas and Electric Company Regarding a Proposed Independent Spent Fuel Storage Installation at Humboldt Bay 72-27 (TAC L23589) ML0037739982000-11-30030 November 2000 Memo to S. Shankman from: T.J. Kobetz Subject: Summary of the November 17, 2000, Meeting Between the NRC and Pacific Gas and Electric Co. Attachments: 1.) Attendance List; 2.) Pge Slides 2021-09-28
[Table view] |
Text
Irv-
-I/P & PulcI
2 Decommissioning Status
-Progress License Termination Plan Review Update and RAI Discussion Decommissioning Status
-Next year activities 20.2002 Exemption Shipments
-3rd exemption water shipments
3 D~ecom iso igSau Progress to Date
-Turbine building to grade
-Waste processing to U S Ecology, Energy Solutions, and WCS.
-Suppression pool downcomers removed
-Off gas tunnel, LRW tunnel, and stack systems removed
-GTCC placed in the ISFSI
-CRDM removal in progress
-Vessel internals segmentation complete
-Support staff relocated to College of Redwoods
-Contract in place with CB&I - in planning phase
a 4
- LTP Review Status Any progress report from NRC
-% complete?
-Anticipated date for approval?
-General feedback
-RAI discussion
- Decommissioning Status (cont.)
Next Year Activities
-Reactor pressure vessel segmentation
-Slurry wall pre-trenching
-Spent fuel pool liner removal
-Discharge canal remediation
-Liquid radwaste building to grade (early 2015)
-Complete valve gallery systems removal
-Complete access shaft systems removal
a
- Deommisionng tatus (cont.)
Final Status Survey Activities Completed FSS of upgraded switchyard Completed FSS of MEPPs area FSS of ISFSI scheduled for this month Groundwater Activities Four new wells installed Two more new wells scheduled for this month Will demolish wells to be affected by slurry wall installation this month
7
- 2O 2OO2 Exemptio Shipments Third request included water shipments to US Ecology Last discharge to liquid radwaste canal this month Major water shipping campaign will be when the spent fuel pool is drained Based on in-leakage to the caisson during the rainy season, some water shipment could occur as early as the first quarter of 2014