ML14066A104: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14066A104
| number = ML14066A104
| issue date = 03/05/2014
| issue date = 03/05/2014
| title = Palo Verde, Units 1, 2 and 3 and Independent Spent Fuel Storage Installation: Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications
| title = Independent Spent Fuel Storage Installation: Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications
| author name = Krainik A K
| author name = Krainik A
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:I - v1*
10 CFR 50, Appendix E 10 CFR 50.54(q) naps                                                                                      Palo Verde Nuclear Generating Station P.O. Box 52034 102-06845-AKK                                                                        Phoenix, AZ 85072 March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
==Reference:==
APS letter number 102-06806, Transmittal of Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications,dated December 6, 2013
==Dear Sirs:==
==Subject:==
Palo Verde Nuclear Generation Station (PVNGS)
Units 1, 2, and 3 and Independent Spent Fuel Storage Installation Docket Nos. 50-528, 50-529, 50-530 and 72-44 License Nos. NPF-41, NPF-51 and NPF-74 Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications On December 6, 2013, Arizona Public Service Company (APS) submitted letter number 102-06806, pursuant to 10 CFR 50.54(q) and 10 CFR 50, Appendix E, Section V, that transmitted a copy of Revision 4 to Emergency Plan Implementing Procedure, EP-0901, Classifications,and a summary of the 10 CFR 50.54(q) analysis for the procedure revision.
It was discovered that the cover letter incorrectly referenced the procedure effective date as August 16, 2013. The correct effective date was November 1, 2013, which was properly Indicated in Enclosure 1, of the letter, entitled, Emergency Plan Implementing Procedure EP-0901, Revision 04, Classifications.This discrepancy has been entered into the Corrective Action Program.
No commitments are being made to the NRC by this letter.
Should you have any question regarding this submittal, please contact me at (623) 393-5045.
Sincerely, Krainik, Angela Digitally eind  signed by Krainik, Angela DN:cn--Krainik, Angela KN21680)
K(V21680)            Reason:
: o. Iam approving this Date 2014.03.S 08&03"38  -0700' Angela K. Krainik Emergency Preparedness Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak
* Diablo Canyon
* Palo Verde e Wolf Creek
102-06845-AKK March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications Page 2 AKK/sw cc:,    M. A. Brown        NRC Senior Resident Inspector for PVNGS J. K. Rankin        NRC NRR Project Manager for PVNGS G. L. Guerra        NRC Region IV}}

Latest revision as of 08:12, 4 November 2019

Independent Spent Fuel Storage Installation: Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications
ML14066A104
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/05/2014
From: Krainik A
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
102-06845-AKK
Download: ML14066A104 (2)


Text

I - v1*

10 CFR 50, Appendix E 10 CFR 50.54(q) naps Palo Verde Nuclear Generating Station P.O. Box 52034 102-06845-AKK Phoenix, AZ 85072 March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852

Reference:

APS letter number 102-06806, Transmittal of Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications,dated December 6, 2013

Dear Sirs:

Subject:

Palo Verde Nuclear Generation Station (PVNGS)

Units 1, 2, and 3 and Independent Spent Fuel Storage Installation Docket Nos. 50-528, 50-529, 50-530 and 72-44 License Nos. NPF-41, NPF-51 and NPF-74 Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications On December 6, 2013, Arizona Public Service Company (APS) submitted letter number 102-06806, pursuant to 10 CFR 50.54(q) and 10 CFR 50, Appendix E, Section V, that transmitted a copy of Revision 4 to Emergency Plan Implementing Procedure, EP-0901, Classifications,and a summary of the 10 CFR 50.54(q) analysis for the procedure revision.

It was discovered that the cover letter incorrectly referenced the procedure effective date as August 16, 2013. The correct effective date was November 1, 2013, which was properly Indicated in Enclosure 1, of the letter, entitled, Emergency Plan Implementing Procedure EP-0901, Revision 04, Classifications.This discrepancy has been entered into the Corrective Action Program.

No commitments are being made to the NRC by this letter.

Should you have any question regarding this submittal, please contact me at (623) 393-5045.

Sincerely, Krainik, Angela Digitally eind signed by Krainik, Angela DN:cn--Krainik, Angela KN21680)

K(V21680) Reason:

o. Iam approving this Date 2014.03.S 08&03"38 -0700' Angela K. Krainik Emergency Preparedness Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
  • Comanche Peak
  • Diablo Canyon
  • Palo Verde e Wolf Creek

102-06845-AKK March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications Page 2 AKK/sw cc:, M. A. Brown NRC Senior Resident Inspector for PVNGS J. K. Rankin NRC NRR Project Manager for PVNGS G. L. Guerra NRC Region IV