| issue date = 03/05/2014 | | issue date = 03/05/2014 | ||
| title = Independent Spent Fuel Storage Installation: Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications | | title = Independent Spent Fuel Storage Installation: Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications | ||
| author name = Krainik A | | author name = Krainik A | ||
| author affiliation = Arizona Public Service Co | | author affiliation = Arizona Public Service Co | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:I -10 CFR 50, Appendix E 10 CFR 50.54(q)naps Palo Verde Nuclear Generating Station P.O. Box 52034 102-06845-AKK Phoenix, AZ 85072 March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 | {{#Wiki_filter:I - v1* | ||
10 CFR 50, Appendix E 10 CFR 50.54(q) naps Palo Verde Nuclear Generating Station P.O. Box 52034 102-06845-AKK Phoenix, AZ 85072 March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 | |||
==Reference:== | ==Reference:== | ||
APS letter number 102-06806, Transmittal of Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications,dated December 6, 2013 | |||
APS letter number 102-06806, Transmittal of Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications, dated December 6, 2013 | |||
==Dear Sirs:== | ==Dear Sirs:== | ||
==Subject:== | ==Subject:== | ||
Palo Verde Nuclear Generation Station (PVNGS)Units 1, 2, and 3 and Independent Spent Fuel Storage Installation Docket Nos. 50-528, 50-529, 50-530 and 72-44 License Nos. NPF-41, NPF-51 and NPF-74 Correction | Palo Verde Nuclear Generation Station (PVNGS) | ||
-Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications On December 6, 2013, Arizona Public Service Company (APS) submitted letter number 102-06806, pursuant to 10 CFR 50.54(q) and 10 CFR 50, Appendix E, Section V, that transmitted a copy of Revision 4 to Emergency Plan Implementing Procedure, EP-0901, Classifications, and a summary of the 10 CFR 50.54(q) analysis for the procedure revision.It was discovered that the cover letter incorrectly referenced the procedure effective date as August 16, 2013. The correct effective date was November 1, 2013, which was properly Indicated in Enclosure 1, of the letter, entitled, Emergency Plan Implementing Procedure EP-0901, Revision 04, Classifications. | Units 1, 2, and 3 and Independent Spent Fuel Storage Installation Docket Nos. 50-528, 50-529, 50-530 and 72-44 License Nos. NPF-41, NPF-51 and NPF-74 Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications On December 6, 2013, Arizona Public Service Company (APS) submitted letter number 102-06806, pursuant to 10 CFR 50.54(q) and 10 CFR 50, Appendix E, Section V, that transmitted a copy of Revision 4 to Emergency Plan Implementing Procedure, EP-0901, Classifications,and a summary of the 10 CFR 50.54(q) analysis for the procedure revision. | ||
This discrepancy has been entered into the Corrective Action Program.No commitments are being made to the NRC by this letter.Should you have any question regarding this submittal, please contact me at (623) 393-5045.Sincerely, Digitally signed by Krainik, Angela | It was discovered that the cover letter incorrectly referenced the procedure effective date as August 16, 2013. The correct effective date was November 1, 2013, which was properly Indicated in Enclosure 1, of the letter, entitled, Emergency Plan Implementing Procedure EP-0901, Revision 04, Classifications.This discrepancy has been entered into the Corrective Action Program. | ||
No commitments are being made to the NRC by this letter. | |||
Should you have any question regarding this submittal, please contact me at (623) 393-5045. | |||
Sincerely, Krainik, Angela Digitally eind signed by Krainik, Angela DN:cn--Krainik, Angela KN21680) | |||
K(V21680) Reason: | |||
: o. Iam approving this Date 2014.03.S 08&03"38 -0700' Angela K. Krainik Emergency Preparedness Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway | |||
* Comanche Peak | * Comanche Peak | ||
* Diablo Canyon | * Diablo Canyon | ||
* Palo Verde e Wolf Creek 102-06845-AKK March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications Page 2 AKK/sw cc: , M. A. Brown | * Palo Verde e Wolf Creek | ||
102-06845-AKK March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications Page 2 AKK/sw cc:, M. A. Brown NRC Senior Resident Inspector for PVNGS J. K. Rankin NRC NRR Project Manager for PVNGS G. L. Guerra NRC Region IV}} |
Latest revision as of 08:12, 4 November 2019
ML14066A104 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 03/05/2014 |
From: | Krainik A Arizona Public Service Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
References | |
102-06845-AKK | |
Download: ML14066A104 (2) | |
Text
I - v1*
10 CFR 50, Appendix E 10 CFR 50.54(q) naps Palo Verde Nuclear Generating Station P.O. Box 52034 102-06845-AKK Phoenix, AZ 85072 March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Reference:
APS letter number 102-06806, Transmittal of Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications,dated December 6, 2013
Dear Sirs:
Subject:
Palo Verde Nuclear Generation Station (PVNGS)
Units 1, 2, and 3 and Independent Spent Fuel Storage Installation Docket Nos. 50-528, 50-529, 50-530 and 72-44 License Nos. NPF-41, NPF-51 and NPF-74 Correction - Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications On December 6, 2013, Arizona Public Service Company (APS) submitted letter number 102-06806, pursuant to 10 CFR 50.54(q) and 10 CFR 50, Appendix E, Section V, that transmitted a copy of Revision 4 to Emergency Plan Implementing Procedure, EP-0901, Classifications,and a summary of the 10 CFR 50.54(q) analysis for the procedure revision.
It was discovered that the cover letter incorrectly referenced the procedure effective date as August 16, 2013. The correct effective date was November 1, 2013, which was properly Indicated in Enclosure 1, of the letter, entitled, Emergency Plan Implementing Procedure EP-0901, Revision 04, Classifications.This discrepancy has been entered into the Corrective Action Program.
No commitments are being made to the NRC by this letter.
Should you have any question regarding this submittal, please contact me at (623) 393-5045.
Sincerely, Krainik, Angela Digitally eind signed by Krainik, Angela DN:cn--Krainik, Angela KN21680)
K(V21680) Reason:
- o. Iam approving this Date 2014.03.S 08&03"38 -0700' Angela K. Krainik Emergency Preparedness Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde e Wolf Creek
102-06845-AKK March 05, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Revision 4 to Emergency Plan Implementing Procedure EP-0901, Classifications Page 2 AKK/sw cc:, M. A. Brown NRC Senior Resident Inspector for PVNGS J. K. Rankin NRC NRR Project Manager for PVNGS G. L. Guerra NRC Region IV