ML14160A814: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14160A814
| number = ML14160A814
| issue date = 06/06/2014
| issue date = 06/06/2014
| title = Palo Verde Nuclear Generating Station, Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations
| title = Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations
| author name = Weber T N
| author name = Weber T
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:RIS 2014-05Qaps102-06882-TNW/DJH June 6, 2014Palo VerdeNuclear Generating StationP.O. Box 52034Phoenix, AZ 85072Mail Station 7636Tel: 623-363-4972 ATTN: Document Control DeskU. S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:RIS 2014-05 Qaps Palo Verde Nuclear Generating Station 102-06882-TNW/DJH                                                             P.O. Box 52034 June 6, 2014                                                                  Phoenix, AZ 85072 Mail Station 7636 Tel: 623-363-4972 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sir:==
==Dear Sir:==


==Subject:==
==Subject:==
 
Palo Verde Nuclear Generating Station (PVNGS)
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3Docket Nos. STN 50/528/529/530 Response to Regulatory Issue Summary (RIS) 2014-05,Preparation and Scheduling of Operator Licensing Examinations This letter provides the Arizona Public Service Company voluntary responseto RIS 2014-05, Preparation and Scheduling of Operator Licensing Examinations.
Units 1, 2 and 3 Docket Nos. STN 50/528/529/530 Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations This letter provides the Arizona Public Service Company voluntary response to RIS 2014-05, Preparation and Scheduling of Operator Licensing Examinations. Enclosed with this letter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2016 through 2019.
Enclosed with this letter is NRC Form 536, which provides theproposed schedule of operator licensing examinations at PVNGS for calendaryears 2016 through 2019.There are no commitments made to the NRC by this letter.If you have any questions or require additional information, please contactMark McGhee, Regulatory Affairs Department Leader, at (623) 393-4972.
There are no commitments made to the NRC by this letter.
Sincerely, Thomas N. WeberDepartment Leader, Regulatory AffairsTNW/DJH
If you have any questions or require additional information, please contact Mark McGhee, Regulatory Affairs Department Leader, at (623) 393-4972.
Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/DJH


==Enclosure:==
==Enclosure:==
 
NRC Form 536, Operator Licensing Examination Data cc:   w/enclosure M. L. Dapas            NRC  Region IV, Regional Administrator V. G. Gaddy            NRC  Region IV, Chief, Operations Branch L. A. Hurley          NRC  Region IV, Licensing Assistant J. K. Rankin          NRC  NRR Project Manager PVNGS M. A. Brown            NRC  Senior Resident Inspector PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance P  o-01 Callaway
NRC Form 536, Operator Licensing Examination Datacc: w/enclosure M. L. DapasV. G. GaddyL. A. HurleyJ. K. RankinM. A. BrownNRCNRCNRCNRCNRCRegion IV, Regional Administrator Region IV, Chief, Operations BranchRegion IV, Licensing Assistant NRR Project Manager PVNGSSenior Resident Inspector PVNGSP o-01A member of the STARS (Strategic Teaming and Resource Sharing)
AllianceCallaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* Wolf Creek Enclosure NRC Form 536Operator Licensing Examination Data NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES:
* Wolf Creek
0913012014 (09-2011)
 
Estimated burden per response to comply with this voluntary information collection request:
Enclosure NRC Form 536 Operator Licensing Examination Data
1hour. This information collection is used to plan budgets and resources for operatorexaminations.
 
Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory
NRC FORM 536                 U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                                   EXPIRES: 0913012014 (09-2011)                                                         Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING                         (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA                         mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
: Affairs, NEOB-10202, (3150-0131),
FACILITY                                                                                                             NRC REGION Palo Verde Nuclear Generating Station                                                                                 IV 50-528, 50-529, 50-530 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                       CY 2016           CY 2017                                 CY 2018                           CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED                   1                 0                                         1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                       CY 2016           CY 2017                                 CY 2018                         CY 2019 NUMBER OF REACTOR                 12                                                        12                               12 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                 6                                                          6                                 6 NUMBER OF SENIOR REACTOR                 6                                                         6                                 6 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE               10/31/2016                                           04/16/2018                         10/14/2019 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016                                                           CY 2017 PROPOSED                        ____                                 .________________
Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.
NUMBER             MARCH         JUNE     SEPTEMBER DECEMBER           MARCH                     JUNE       SEPTEMBER DECEMBER ESTIMATED NUMBER OF           25                                                      25 CANDIDATES NRC FORM 536 (09-2011)}}
FACILITY NRC REGIONPalo Verde Nuclear Generating Station IV50-528, 50-529, 50-530A. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019ESTIMATED NUMBER OFLICENSEE-PREPARED 1 0 1 1EXAMINATIONS ESTIMATED NUMBER OFNRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019NUMBER OF REACTOR 12 12 12OPERATORS NUMBER OF SENIOR REACTOROPERATORS
-INSTANT 6 6 6NUMBER OF SENIOR REACTOR 6 6 6OPERATORS
-UPGRADENUMBER OF SENIOR REACTOROPERATORS
-LIMITEDPROPOSED DATESPRIMARY DATE 10/31/2016 04/16/2018 10/14/2019 ALTERNATE DATEC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2016 CY 2017PROPOSED
____ .________________
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATED NUMBER OF 25 25CANDIDATES NRC FORM 536 (09-2011)}}

Latest revision as of 04:40, 4 November 2019

Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations
ML14160A814
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/06/2014
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06882-TNW/DJH, RIS-14-005
Download: ML14160A814 (3)


Text

RIS 2014-05 Qaps Palo Verde Nuclear Generating Station 102-06882-TNW/DJH P.O. Box 52034 June 6, 2014 Phoenix, AZ 85072 Mail Station 7636 Tel: 623-363-4972 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket Nos. STN 50/528/529/530 Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations This letter provides the Arizona Public Service Company voluntary response to RIS 2014-05, Preparation and Scheduling of Operator Licensing Examinations. Enclosed with this letter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2016 through 2019.

There are no commitments made to the NRC by this letter.

If you have any questions or require additional information, please contact Mark McGhee, Regulatory Affairs Department Leader, at (623) 393-4972.

Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/DJH

Enclosure:

NRC Form 536, Operator Licensing Examination Data cc: w/enclosure M. L. Dapas NRC Region IV, Regional Administrator V. G. Gaddy NRC Region IV, Chief, Operations Branch L. A. Hurley NRC Region IV, Licensing Assistant J. K. Rankin NRC NRR Project Manager PVNGS M. A. Brown NRC Senior Resident Inspector PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance P o-01 Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure NRC Form 536 Operator Licensing Examination Data

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Palo Verde Nuclear Generating Station IV 50-528, 50-529, 50-530 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR 12 12 12 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 6 6 NUMBER OF SENIOR REACTOR 6 6 6 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/31/2016 04/16/2018 10/14/2019 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED ____ .________________

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 25 25 CANDIDATES NRC FORM 536 (09-2011)