{{#Wiki_filter:June 17, 2014 EN-14-023 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION
{{#Wiki_filter:June 17, 2014 EN-14-023 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:       Entergy Operations, Inc.                                     (EA-14-008)
 
Arkansas Nuclear One, Units 1 and 2 Docket: 05-313, 05-368
Licensee: Entergy Operations, Inc.     (EA-14-008) Arkansas Nuclear One, Units 1 and 2 Docket: 05-313, 05-368  


==Subject:==
==Subject:==
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about June 20, 2014, to Entergy Operations, Inc. (Entergy) for a violation associated with a Yellow Significance Determination Process finding for Unit 1 and a Yellow Significance Determination Process finding for Unit 2 identified during an inspection of Arkansas Nuclear One. The Yellow findings representing issues of substantial safety significance will require additional U.S.  
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about June 20, 2014, to Entergy Operations, Inc. (Entergy) for a violation associated with a Yellow Significance Determination Process finding for Unit 1 and a Yellow Significance Determination Process finding for Unit 2 identified during an inspection of Arkansas Nuclear One. The Yellow findings representing issues of substantial safety significance will require additional U.S.
 
Nuclear Regulatory Commission (NRC) inspections. The findings involve the March 31, 2013, Unit 1 stator drop that affected safety-related equipment on both units. Specifically, Entergy approved a design for the temporary hoisting assembly that was not supported by detailed drawings, specifications, evaluations, and/or certifications as required by Entergy Quality Procedure EN-MA-119, Material Handling Program. Entergy failed to identify the load deficiencies in the heavy lift gantry calculation, failed to design the temporary hoisting assembly for at least 125 percent of the projected hook load, and failed to perform a load test in all configurations for which the temporary hoisting assembly would be used. As a result, on March 31, 2013, while lifting and transferring the main generator stator, the temporary overhead crane collapsed causing the 525-ton Unit 1 stator to fall on and extensively damage portions of the plant, including safety-related equipment.
Nuclear Regulatory Commission (NRC) inspections. The findings involve the March 31, 2013, Unit 1 stator drop that affected safety-related equipment on both units. Specifically, Entergy approved a design for the temporary hoisting assembly that was not supported by detailed drawings, specifications, evaluations, and/or certifications as required by Entergy Quality Procedure EN-MA-119, "Material Handling Program.Entergy failed to identify the load deficiencies in the heavy lift gantry calculation, failed to design the temporary hoisting assembly for at least 125 percent of the projected hook load, and failed to perform a load test in all configurations for which the temporary hoisting assembly would be used. As a result, on March 31, 2013, while lifting and transferring the main generator stator, the temporary overhead crane collapsed causing the 525-ton Unit 1 stator to fall on and extensively damage portions of the plant, including safety-related equipment.  
A Notice of Violation is included based on Entergys failure to meet 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures and Drawings, which requires, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings. In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a Yellow finding for Unit 1 and a Yellow finding for Unit 2.
 
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
A Notice of Violation is included based on Entergy's failure to meet 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures and Drawings," which requires, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings. In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a Yellow finding for Unit 1 and a Yellow finding for Unit 2.  
Mailing of Final Significance Determination                             June 20, 2014 Telephone Notification of Licensee                                     June 20, 2014 The state of Arkansas will be notified.
 
CONTACTS: Lauren Casey, OE/EB                                           John Wray, OE/EB (301) 415-1038                                         (301) 415-1288
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:  
 
Mailing of Final Significance Determination June 20, 2014 Telephone Notification of Licensee June 20, 2014  
 
The state of Arkansas will be notified.
CONTACTS: Lauren Casey, OE/EB     John Wray, OE/EB (301) 415-1038     (301) 415-1288 Distribution: EN-14-023, June 17, 2014 OWFN OWFN TWFN Regional Offices Chairman Macfarlane Comm. Svinicki Comm. Apostolakis Comm. Magwood Comm. Ostendorff SECY OCA OPA OIP EDO DEDR DEDMRS OE OGC NRR OI OIG OCFO OIS RES ACRS FSME NRO
 
3WFN NMSS NSIR OPS CENTER
 
RI          RII RIII        RIV
 
MAIL OE Staff  DISTRIBUTION:  NHilton, OE  OE R/F  EN binder


ADAMS Accession Number:
Distribution: EN-14-023, June 17, 2014 OWFN                      OWFN            TWFN              Regional Offices Chairman Macfarlane        EDO            OCFO              RI      RII Comm. Svinicki            DEDR            OIS              RIII    RIV Comm. Apostolakis          DEDMRS          RES Comm. Magwood              OE              ACRS Comm. Ostendorff          OGC            FSME              MAIL SECY                      NRR            NRO              OE Staff OCA                        OI OPA                        OIG            3WFN OIP                                        NMSS NSIR OPS CENTER DISTRIBUTION:
ML14167A490 OFFICE OE/EB: ES OE: Acting BC NAME LCasey /RA by JWray for/ JWray DATE 6/17/2014 6/17/2014 OFFICIAL RECORD COPY}}
NHilton, OE                  OE R/F        EN binder ADAMS Accession Number: ML14167A490 OFFICE               OE/EB: ES           OE: Acting BC NAME         LCasey /RA by JWray for/         JWray DATE                 6/17/2014             6/17/2014 OFFICIAL RECORD COPY}}

Latest revision as of 04:21, 4 November 2019

EN-14-023, Issuance of Final Significance Determination and Notice of Violation (EA-14-008)
ML14167A490
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/17/2014
From: Wray J
NRC/OE
To:
Entergy Operations
Casey L, 415-1038
References
EA-14-008 EN-14-023
Download: ML14167A490 (2)


Text

June 17, 2014 EN-14-023 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Entergy Operations, Inc. (EA-14-008)

Arkansas Nuclear One, Units 1 and 2 Docket: 05-313,05-368

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about June 20, 2014, to Entergy Operations, Inc. (Entergy) for a violation associated with a Yellow Significance Determination Process finding for Unit 1 and a Yellow Significance Determination Process finding for Unit 2 identified during an inspection of Arkansas Nuclear One. The Yellow findings representing issues of substantial safety significance will require additional U.S.

Nuclear Regulatory Commission (NRC) inspections. The findings involve the March 31, 2013, Unit 1 stator drop that affected safety-related equipment on both units. Specifically, Entergy approved a design for the temporary hoisting assembly that was not supported by detailed drawings, specifications, evaluations, and/or certifications as required by Entergy Quality Procedure EN-MA-119, Material Handling Program. Entergy failed to identify the load deficiencies in the heavy lift gantry calculation, failed to design the temporary hoisting assembly for at least 125 percent of the projected hook load, and failed to perform a load test in all configurations for which the temporary hoisting assembly would be used. As a result, on March 31, 2013, while lifting and transferring the main generator stator, the temporary overhead crane collapsed causing the 525-ton Unit 1 stator to fall on and extensively damage portions of the plant, including safety-related equipment.

A Notice of Violation is included based on Entergys failure to meet 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures and Drawings, which requires, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings. In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a Yellow finding for Unit 1 and a Yellow finding for Unit 2.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination June 20, 2014 Telephone Notification of Licensee June 20, 2014 The state of Arkansas will be notified.

CONTACTS: Lauren Casey, OE/EB John Wray, OE/EB (301) 415-1038 (301) 415-1288

Distribution: EN-14-023, June 17, 2014 OWFN OWFN TWFN Regional Offices Chairman Macfarlane EDO OCFO RI RII Comm. Svinicki DEDR OIS RIII RIV Comm. Apostolakis DEDMRS RES Comm. Magwood OE ACRS Comm. Ostendorff OGC FSME MAIL SECY NRR NRO OE Staff OCA OI OPA OIG 3WFN OIP NMSS NSIR OPS CENTER DISTRIBUTION:

NHilton, OE OE R/F EN binder ADAMS Accession Number: ML14167A490 OFFICE OE/EB: ES OE: Acting BC NAME LCasey /RA by JWray for/ JWray DATE 6/17/2014 6/17/2014 OFFICIAL RECORD COPY