{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016 Mr. Thomas A. Vehec Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785
-4352 December 20, 2016 Mr. Thomas A. Vehec Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324
-9785  


==SUBJECT:==
==SUBJECT:==
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS -
- DUANE ARNOLD ENERGY CENTER
DUANE ARNOLD ENERGY CENTER


==Dear Mr. Vehec:==
==Dear Mr. Vehec:==
We have received your letter s NG-1 6-0 145, dated J ul y 1 2, 2016, in response to U.S.
Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016
-09, "Preparation and Scheduling of Operator Licensing Examinations."
In th e letter, you requested that initial operator licensing examination s be scheduled for April 2019 and April 2021. In response
, we have scheduled initial license examinations for the weeks of:
April 8 and 15, 201 9 , with an onsite validation date the week of March 11, 201 9; and  April 5 and 12, 20 2 1 , with an onsite validation date the week of March 8, 20 2 1. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately
, upon discovery
, of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examination s unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for these examination s, the examination s were scheduled for 2 weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 1 50 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program
.
T. Vehec    In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). Sincerely, 
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety


Docket No. 50
We have received your letters NG-16-0145, dated July 12, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested that initial operator licensing examinations be scheduled for April 2019 and April 2021.
-331 License No. DPR-49 cc: Distribution via LISTSERV
In response, we have scheduled initial license examinations for the weeks of:
* April 8 and 15, 2019, with an onsite validation date the week of March 11, 2019; and
* April 5 and 12, 2021, with an onsite validation date the week of March 8, 2021.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for these examinations, the examinations were scheduled for 2 weeks.
Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 150 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.


T. Vehec     In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
T. Vehec                                         In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Roo m). Sincerely,
Sincerely,
/RA/
                                                /RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 cc: Distribution via LISTSERV


Docket No. 50
T. Vehec                                                                  In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-331 License No. DPR-49 cc: Distribution via LISTSERV DISTRIBUTION
Sincerely,
: Jeremy Bowen
                                                                          /RA/
 
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 cc: Distribution via LISTSERV DISTRIBUTION:
RidsNrrDorlLpl3
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML16356A318 Publicly Available                           Non-Publicly Available                     Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                               RIII                                 RIII                           RIII NAME               RKWalton:jw                         ROrlikowski DATE               11/23/16                           12/20/16 OFFICIAL RECORD COPY}}
-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML16356A318 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw ROrlikowski DATE 11/23/16 1 2/20/16   OFFICIAL RECORD COPY}}

Revision as of 10:04, 30 October 2019

Ltr 12/20/16 Scheduling of Initial Operator License Examinations - Duane Arnold Energy Center
ML16356A318
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/20/2016
From: Robert Orlikowski
Operations Branch III
To: Vehec T
NextEra Energy Duane Arnold
References
NG-16-0145
Download: ML16356A318 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016 Mr. Thomas A. Vehec Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS -

DUANE ARNOLD ENERGY CENTER

Dear Mr. Vehec:

We have received your letters NG-16-0145, dated July 12, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested that initial operator licensing examinations be scheduled for April 2019 and April 2021.

In response, we have scheduled initial license examinations for the weeks of:

  • April 8 and 15, 2019, with an onsite validation date the week of March 11, 2019; and
  • April 5 and 12, 2021, with an onsite validation date the week of March 8, 2021.

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for these examinations, the examinations were scheduled for 2 weeks.

Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 150 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

T. Vehec In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 cc: Distribution via LISTSERV

T. Vehec In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 cc: Distribution via LISTSERV DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML16356A318 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw ROrlikowski DATE 11/23/16 12/20/16 OFFICIAL RECORD COPY