|
|
(7 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17030A177 | | | number = ML17030A177 |
| | issue date = 02/07/2017 | | | issue date = 02/07/2017 |
| | title = AQUATIC RESOURCES-RAI AR-6 Request to DEQ Regarding 316(b) Permit Modification | | | title = Aquatic RESOURCES-RAI AR-6 Request to DEQ Regarding 316(b) Permit Modification |
| | author name = | | | author name = |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
| | addressee name = Keegan E M | | | addressee name = Keegan E |
| | addressee affiliation = NRC/NRR/DLR | | | addressee affiliation = NRC/NRR/DLR |
| | docket = 05000382 | | | docket = 05000382 |
Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:* Entergy c:=* |
| | Entergy Operations, Inc Waterford 3 SES |
| | ~ 7265 River Road Killona, lJ\ 70057 Tel 504 139 6650 W3B0-2007-0013 A4.06 PR CERTIFIED MAIL NO. 7004 2890 0003 6925 2526 RETURN RECEIPT REQUESTED April 9, 2007 Mrs. Yvonne Baker Louisiana Department of Environmental Quality Office of Environmental Services Permit Compliance Unit P. 0. Box 4312 Baton Rouge, LA 70821-4312 |
| | |
| | ==Subject:== |
| | Permit Modification for Section 316(b) Phase II Rule Compliance Waterford Steam Electric Station - Unit Number 3 Agency Interest Number 35260 LPDES Permit Number LA0007374 |
| | |
| | ==Dear Ms. Baker:== |
| | |
| | Our current LPDES permit requires Waterford 3 to initiate compliance with the Section 316(b) Phase II Rule requirements and applicable state regulations for cooling water intake structures. Part II, Section X of our permit requires the submission of a Comprehensive Demonstration Study (CDS) and other information as required by 40 CFR 125.95 as expeditiously as practicable, but no later than January 7, 2008. |
| | Entergy respectfully request the 316(b) language located in Part II, Section X of our permit be removed or modified due to the remanding of major portions of the rule on January 25, 2007 by the Second U.S. Circuit Court of Appeals. (See Riverlceeper, Inc. |
| | : v. EPA, 475 F. 3d 83 (2°'1 Cir. 2007)). Further litigation on this matter and EPA's redevelopment of this Rule after remand may significantly alter Waterford 3's strategy for compliance as outlined in our Proposal for Information Collections (PIC) submitted on December 22, 2005. In addition, as a result of so many portions of the Phase II rule affected by the remand, the United States Environmental Protection Agency issued a memorandum on March 20, 2007 stating that the rule should be considered suspended until further action by the agency. |
| | Entergy believes a permit modification is required that clearly defines compliance with those aspects of the 316(b) rule that LDEQ considers still applicable or enforceable. |
| | Please note that Entergy's comments on the draft permit requested that this deadline not be included in the permit due to the high probability of a change in the regulatory deadline through the Rule litigation. |
| | |
| | Mrs. Yvonne Baker Permit Modification W3B0-2007-0013 April 9, 2007 Page 2 of 2 Entergy requests that LDEQ consider this modification urgent due to the compliance schedule listed in the permit. |
| | Should you have any questions or comments, please contact Mr. Mark J. Louque at (504) 464-3267. |
| | Sincerely, I |
| | Kevin T. Walsh Vice President-Operations Waterford 3 KTW/MJUmjl cc: M. J. Louque W-MSB4-238 K. T. Walsh W-GSB-300 R. A. Dodds W-MSB4-300 Waterford 3 Records ecc: G.M.VonBodungen L-LITG-4 R.N. Buckley M-ECH-595 J.M. Amato W-MSB4-238 C. M. Zeringue W-MSB4-238 C. Barlow M-ELEC-6B}} |
|
---|
Category:Response to Request for Additional Information (RAI)
MONTHYEARW3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2022-04-25025 April 2022 Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt W3F1-2021-0060, Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-09-30030 September 2021 Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual W3F1-2021-0041, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System2021-06-0202 June 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L W3F1-2020-0062, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 62020-12-15015 December 2020 Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 W3F1-2020-0043, Response to NRC Request for Additional Information Regarding License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2020-07-0606 July 2020 Response to NRC Request for Additional Information Regarding License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2020-0033, (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4.8.1, A.C. Sources Operating2020-05-29029 May 2020 (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4.8.1, A.C. Sources Operating CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary W3F1-2019-0056, Revision to Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-12019-07-31031 July 2019 Revision to Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1 W3F1-2019-0054, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-12019-07-22022 July 2019 Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1 W3F1-2019-0040, Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side2019-07-11011 July 2019 Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Intern W3F1-2019-0039, (Waterford 3) - Response to Request for Additional Information Regarding Relief Request W3-ISI-0322019-07-0808 July 2019 (Waterford 3) - Response to Request for Additional Information Regarding Relief Request W3-ISI-032 W3F1-2019-0005, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update2019-02-15015 February 2019 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update W3F1-2019-0011, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding Relief Request WF3-RR-19-1 for Application of Dissimilar Metal Weld Full Structural Weld Overlay2019-02-0404 February 2019 Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding Relief Request WF3-RR-19-1 for Application of Dissimilar Metal Weld Full Structural Weld Overlay W3F1-2019-0002, (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across2019-01-19019 January 2019 (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across W3F1-2018-0067, Response to NRC Request for Alternative to ASME Code Case N-770-2, Successive Examinations, Relief Request W3-ISI-0312018-11-19019 November 2018 Response to NRC Request for Alternative to ASME Code Case N-770-2, Successive Examinations, Relief Request W3-ISI-031 W3F1-2018-0059, (Waterford 3) - Response to NRC Request for Additional Information Regarding License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position ...2018-10-18018 October 2018 (Waterford 3) - Response to NRC Request for Additional Information Regarding License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position ... CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station W3F1-2018-0020, Responses to Request for Additional Information Set 18 Regarding the License Renewal Application2018-04-23023 April 2018 Responses to Request for Additional Information Set 18 Regarding the License Renewal Application ML18101A0962018-04-10010 April 2018 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2018007) and Request for Information W3F1-2017-0039, Responses to Request for Additional Information Set 17 Regarding the License Renewal Application2017-05-12012 May 2017 Responses to Request for Additional Information Set 17 Regarding the License Renewal Application W3F1-2017-0027, Responses to Request for Additional Information Set 16 Regarding the License Renewal Application2017-05-0202 May 2017 Responses to Request for Additional Information Set 16 Regarding the License Renewal Application ML17114A4322017-04-21021 April 2017 Responses to Request for Additional Information for the Environmental Review (SAMA Round 2) Regarding the License Renewal Application W3F1-2017-0026, Responses to Request for Additional Information Set 15 Regarding the License Renewal Application2017-04-11011 April 2017 Responses to Request for Additional Information Set 15 Regarding the License Renewal Application W3F1-2017-0023, Responses to Request for Additional Information Set 14 Regarding the License Renewal Application2017-03-30030 March 2017 Responses to Request for Additional Information Set 14 Regarding the License Renewal Application W3F1-2017-0015, Responses to Request for Additional Information Set 13 Regarding the License Renewal Application2017-03-16016 March 2017 Responses to Request for Additional Information Set 13 Regarding the License Renewal Application W3F1-2017-0018, Supplement to Response to RAI on License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System Subgroup Relays to Surveillance.2017-02-27027 February 2017 Supplement to Response to RAI on License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System Subgroup Relays to Surveillance. ML17054D2392017-02-23023 February 2017 Responses to Request for Additional Information Set 12 Regarding the License Renewal Application ML17037D0552017-02-0707 February 2017 Groundwater Resources (Gw) RAI GW-1 WF3 Groundwater Monitoring Program_Five-Year Review ML17038A2642017-02-0707 February 2017 Surface Water Resources (Sw)Rai SW-11 Usace NNOD-SP (Mississippi River) 796 Permit ML17034A3232017-02-0707 February 2017 Aquatic Resources (AR)- RAI AR-7 Ensr 2005_W1&2 PIC ML17030A1872017-02-0707 February 2017 Aquatic RESOURCES-RAI AR-6 LPDES Permit Modification_2008 ML17038A2772017-02-0707 February 2017 Surface Water Resources (SW) RAI SW-11 Ldwf Letter of No Objection ML17037C9972017-02-0707 February 2017 Aquatic Resources (AR) RAI AR-7 WF3 1998_WF3 LPDES Fact Sheet and Rationale for Draft LPDES Permit ML17024A2392017-02-0707 February 2017 Alternatives RAI-AL-3 Lanning 2014_Correspondence Lanning-Entergy to Buckley-Entergy ML17037D0362017-02-0707 February 2017 Cumultive Impacts (Cu) RAI CU-1 Reasonably Foreseeable Future Projects within WF3 Area ML17038A4362017-02-0707 February 2017 Responses to Request for Additional Information for the Environmental Review ML17024A1702017-02-0707 February 2017 Alternatives RAI AL-1 Power Replacement Suitable Sites ML17037D2822017-02-0707 February 2017 Surface Water Resources (Sw)Rai SW-1 WF3 Surface Water Withdrawals_Discharges_2011-2015 ML17024A1932017-02-0707 February 2017 Alternatives RAI AL-3 - Enercon 2015b_Calc Supporting Section 07_01 Alternatives ML17024A2472017-02-0707 February 2017 Aquatic Resources RAI AR-4 -Entergy 2005_WF3 316(b) Proposal for Information Collection 2024-09-24
[Table view] |
Text
Entergy Operations, Inc Waterford 3 SES
~ 7265 River Road Killona, lJ\ 70057 Tel 504 139 6650 W3B0-2007-0013 A4.06 PR CERTIFIED MAIL NO. 7004 2890 0003 6925 2526 RETURN RECEIPT REQUESTED April 9, 2007 Mrs. Yvonne Baker Louisiana Department of Environmental Quality Office of Environmental Services Permit Compliance Unit P. 0. Box 4312 Baton Rouge, LA 70821-4312
Subject:
Permit Modification for Section 316(b) Phase II Rule Compliance Waterford Steam Electric Station - Unit Number 3 Agency Interest Number 35260 LPDES Permit Number LA0007374
Dear Ms. Baker:
Our current LPDES permit requires Waterford 3 to initiate compliance with the Section 316(b) Phase II Rule requirements and applicable state regulations for cooling water intake structures. Part II,Section X of our permit requires the submission of a Comprehensive Demonstration Study (CDS) and other information as required by 40 CFR 125.95 as expeditiously as practicable, but no later than January 7, 2008.
Entergy respectfully request the 316(b) language located in Part II,Section X of our permit be removed or modified due to the remanding of major portions of the rule on January 25, 2007 by the Second U.S. Circuit Court of Appeals. (See Riverlceeper, Inc.
- v. EPA, 475 F. 3d 83 (2°'1 Cir. 2007)). Further litigation on this matter and EPA's redevelopment of this Rule after remand may significantly alter Waterford 3's strategy for compliance as outlined in our Proposal for Information Collections (PIC) submitted on December 22, 2005. In addition, as a result of so many portions of the Phase II rule affected by the remand, the United States Environmental Protection Agency issued a memorandum on March 20, 2007 stating that the rule should be considered suspended until further action by the agency.
Entergy believes a permit modification is required that clearly defines compliance with those aspects of the 316(b) rule that LDEQ considers still applicable or enforceable.
Please note that Entergy's comments on the draft permit requested that this deadline not be included in the permit due to the high probability of a change in the regulatory deadline through the Rule litigation.
Mrs. Yvonne Baker Permit Modification W3B0-2007-0013 April 9, 2007 Page 2 of 2 Entergy requests that LDEQ consider this modification urgent due to the compliance schedule listed in the permit.
Should you have any questions or comments, please contact Mr. Mark J. Louque at (504) 464-3267.
Sincerely, I
Kevin T. Walsh Vice President-Operations Waterford 3 KTW/MJUmjl cc: M. J. Louque W-MSB4-238 K. T. Walsh W-GSB-300 R. A. Dodds W-MSB4-300 Waterford 3 Records ecc: G.M.VonBodungen L-LITG-4 R.N. Buckley M-ECH-595 J.M. Amato W-MSB4-238 C. M. Zeringue W-MSB4-238 C. Barlow M-ELEC-6B