| number = ML17363A442
| number = ML17363A442
| issue date = 12/21/2017
| issue date = 12/21/2017
| title = Dresden Nuclear Power Station - Supplemental Request for Information for 50.59 Inspection (DRS-A.Shaikh)
| title = Supplemental Request for Information for 50.59 Inspection (DRS-A.Shaikh)
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ADAMS Accession Number ML17363A442 December 21, 2017 NRC Supplement to NRC Letter - IN FORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 BASELINE INSPECTION DATED November 17, 2017 (Hereafter Items ref erred to are from this NRC Letter).
{{#Wiki_filter:December 21, 2017 NRC Supplement to NRC Letter - INFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 BASELINE INSPECTION DATED November 17, 2017 (Hereafter Items referred to are from this NRC Letter).
NRC Supplemental Information Requests for - Dresden Station  
NRC Supplemental Information Requests for - Dresden Station The following Evaluations, Screenings, and Applicability Determinations are requested:
Evaluations:
ESSENTIAL SERVICES BUS UFSAR AND TECHNICAL SPECIFICATION BASES 2016-04-001          EC 405313        UPDATE UTILIZE MSIV 2A SWITCH AS THE RPS 2016-03-002          TCCP 405013      SIGNAL FOR FAILED 1B CONTACT EC 380008, 383022, UFSAR              On-Line Noble Metals Chemical (OLNC) 2016-03-001          Change 16-002    Injection for Unit 2 and Unit 3 2016-10-001            EC 391644        Reactor and Diesel Building Flood Barriers UFSAR tracking          Revise references within UFSAR Section 2016-05-001          number 15-019    9.6.4.1.5 2016-03-002          TCCP 405013      Reactor and Diesel Building Flood Barriers Screenings:
2017-                                        FAILURE OF UNIT 2 125 VDC POWER 13085    212        DOA 6900-02        Procedure      SUPPLY 2017-                        Facility      Basis for Declassification of Power Supplies for 13058    187        EC 402740          Change        RWCU Leak Detection Panels to Non-EQ INSTALL TEMPORARY 120V FEED FROM 2016-                        Facility      UNIT 2 SBO UPS TO UNIT 3 SBO ENGINE 12751    228        EC 406198          Change        CONTROL CIRCUIT 405048,405049, 405050,405051, 2016-      405052,405053,    Facility      UTILIZE 2A SWITCH AS THE RPS SIGNAL 12566    059        405054            Change        FOR THE FAILED 1A and 1B CONTACT ADAMS Accession Number ML17363A442


The following Evaluations, Screenings, and Applicability Determinations are requested:
2015-    TRM Change 12475 356      15-014                  Revise TRM Sections 3.3.e, and Section 3.7.k 2015-                    Facility  Temporary Installation of Emergency Lighting 12242 144      EC 402314      Change    Units (ELU) for the 903-39 Panels MR90 CONNECT BATTERY CHARGER 3-2017-                    Facility  8350-3B DIRECTLY TO CHARGE NEW U3 12993 123      MR90 618106    Change    BOP 250VDC BATTERY 2017-    DOS 6620-08              SBO 2(3) DIESEL GENERATOR 12970 101      Rev 03        Procedure OVERSPEED TRIP TEST 2017-    DOP 6900-06 12908 041      Rev 39        Procedure 125 VDC GROUND DETECTION UNIT 2 Jumper Cell 3 and Cell 110 on 250 VDC 12836 2016-51  EC 407161      Facility  Station Battery 2017-                    Facility 13061 190      EC 618606      Change    Unit 1 Fuel Oil Transfer System Replacement 2017-    DOP 3200-09, 13031 160      rev 27        Procedure ZINC INJECTION SYSTEM OPERATION 2017-13018 147      DGA-12 rev76  Procedure LOSS OF OFFSITE POWER 2017-    DSSP 0200-S 12995 125      rev 17        Procedure SDC COLD SHUTDOWN METHOD 2017-                    Facility  Largest Single Load For Emergency Diesel 12890 023      17-002        Change    Generators Facility  NUCLEAR FUEL TRANSITION TO AREVA 12789 2016-46  EC 393280      Change    ATRIUM 10XM 2015-    DGP 04-01 Rev 12269 169      32            Procedure FUEL MOVES AND REFUELING 2015-    DOP 5750-02 12193 093      Rev 44        Procedure REACTOR BUILDING VENTILATION 2015-    DOP 0220-01 12233 135      Rev 12        Procedure RPV HEAD COOLING 2015-                    Facility  RWCU HELB CALC IN EQ ZONE 28/
12491 372      EC 402480      Change    REVISION 1 OF CALC.DR-067-M-001 ADAMS Accession Number ML17363A442


Evaluations: 2016-04-001 EC 405313 ESSENTIAL SERVICES BUS UFSAR AND TECHNICAL SPECIFICATION BASES UPDATE 2016-03-002 TCCP 405013 UTILIZE MSIV 2A SWITCH AS THE RPS SIGNAL FOR FAILED 1B CONTACT 2016-03-001 EC 380008, 383022, UFSAR Change 16-002 On-Line Noble Metals Chemical (OLNC) Injection for Unit 2 and Unit 3  2016-10-001  EC 391644  Reactor and Diesel Building Flood Barriers 2016-05-001 UFSAR tracking number 15-019 Revise references within UFSAR Section 9.6.4.1.5 2016-03-002 TCCP 405013 Reactor and Diesel Building Flood Barriers Screenings:
2015-                     Facility 12214 116           EC 399633       Change   FW Check Valve Test Taps "A" Line - U2 2015-                     Facility Installation of New 2-1201-1 Valve During 12283 182          WO 1312947-01  Change    D2R24 2016-                     Facility 12587 080           UFSAR 5.4.6.3   Change   Revision to UFSAR section 5.4.6.3 2015-     DAN 902(3)-3 D-12261 161          4 Rev13         Procedure ISOL CONDR LVL HI/LO 2015-     DOP 1300-02     Procedur AUTOMATIC OPERATION OF ISOLATION 12262 162          Rev 27          e        CONDENSER 2015-     DOP 1300-03               MANUAL OPERATION OF THE ISOLATION 12263 163          Rev 36          Procedure CONDENSER 2015-                     Facility Hardened Containment Vent System -
13085 2017-212 DOA 6900-02 Procedure FAILURE OF UNIT 2 125 VDC POWER SUPPLY 13058 2017-187 EC 402740 Facility Change Basis for Declassification of Power Supplies for RWCU Leak Detection Panels to Non-EQ 12751 2016-228 EC 406198 Facility Change INSTALL TEMPORARY 120V FEED FROM UNIT 2 SBO UPS TO UNIT 3 SBO ENGINE CONTROL CIRCUIT 12566 2016-059 405048,405049, 405050,405051, 405052,405053, 405054 Facility Change UTILIZE 2A SWITCH AS THE RPS SIGNAL FOR THE FAILED 1A and 1B CONTACT ADAMS Accession Number ML17363A442 12475 2015-356 TRM Change 15-014  Revise TRM Sections 3.3.e,  and  Section 3.7.k 12242 2015-144 EC 402314 Facility Change Temporary Installation of  Emergency Lighting Units (ELU) for the 903-39 Panels 12993 2017-123 MR90 618106 Facility Change MR90 CONNECT BATTERY CHARGER 3-8350-3B DIRECTLY TO CHARGE NEW U3
12404 289          EC 400578      Change    Modification - U3 Online 2016-     DOP 6620-21 12510 005          Rev 08         Procedure UNIT 2(3) SBO VENTILATION 2016-     DOP 0010-13 12539 033          Rev 07         Procedure SEISMIC EVENT RETRIEVAL/EVALUATION 2016-                     Facility MOV 2-3906 TO BE CHANGED TO 12593 083          EC 404969      Change    MANUALLY OPERATED VALVE 2016-                               TORUS WATER COOLING MODE OF LOW 12570 167           DOP 1500-02     Procedure PRESSURE COOLANT INJECTION SYSTEM 2016-     UFSAR Change             Appendix R Elevated Temperature and HPCI 12723 205          No. 16-012     Procedure Operation DISPOSITION OF 175 FT-LBF FOR THE 2017-                      Facility  MOUNTING BOLTS ON U3 MSIVS LIMIT 12912 045          EC 618693      Change    SWITCH MOUNTING PLATES Applicability Determinations:
 
0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT BREAKER TRIP SETTING CHANGE AT MCC 2-7826-1F3 FOR MOTOR FOR 2A REACTOR FEED PUMP DISCHARGE VALVE 0000622072 20171115 MOV 2-3201-A 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT ADAMS Accession Number ML17363A442
BOP 250VDC BATTERY 12970 2017-101 DOS 6620-08 Rev 03 Procedure SBO 2(3) DIESEL GENERATOR OVERSPEED TRIP TEST 12908 2017-041 DOP 6900-06 Rev 39 Procedure 125 VDC GROUND DETECTION  UNIT 2 12836 2016-51 EC 407161 Facility Jumper Cell 3 and Cell 110 on 250 VDC Station Battery 13061 2017-190 EC 618606 Facility Change Unit 1 Fuel Oil Transfer System Replacement 13031 2017-160 DOP 3200-09, rev 27 ProcedureZINC INJECTION SYSTEM OPERATION 13018 2017-147 DGA-12 rev76 ProcedureLOSS OF OFFSITE POWER 12995 2017-125 DSSP 0200-S rev 17 ProcedureSDC COLD SHUTDOWN METHOD 12890 2017-023 17-002 Facility Change Largest Single Load For Emergency Diesel Generators 12789 2016-46 EC 393280 Facility Change NUCLEAR FUEL TRANSITION TO AREVA ATRIUM 10XM 12269 2015-169 DGP 04-01 Rev 32 ProcedureFUEL MOVES AND REFUELING 12193 2015-093 DOP 5750-02 Rev 44 ProcedureREACTOR BUILDING VENTILATION 12233 2015-135 DOP 0220-01 Rev 12 ProcedureRPV HEAD COOLING 12491 2015-372 EC 402480 Facility Change RWCU HELB CALC IN EQ ZONE 28/ REVISION 1 OF CALC.DR-067-M-001 ADAMS Accession Number ML17363A442 12214 2015-116 EC 399633 Facility Change FW Check Valve Test Taps "A" Line - U2 12283 2015-182 WO 1312947-01 Facility Change Installation of New 2-1201-1 Valve During D2R24 12587 2016-080 UFSAR 5.4.6.3 Facility Change Revision to UFSAR section 5.4.6.3 12261  2015-161 DAN 902(3)-3 D-4 Rev13 ProcedureISOL CONDR LVL HI/LO 12262 2015-162 DOP 1300-02 Rev 27  Procedur e AUTOMATIC OPERATION OF ISOLATION CONDENSER 12263 2015-163 DOP 1300-03 Rev 36 ProcedureMANUAL OPERATION OF THE ISOLATION CONDENSER 12404 2015-289 EC 400578 Facility Change Hardened Containment Vent System -Modification - U3 Online 12510 2016-005 DOP 6620-21 Rev 08 ProcedureUNIT 2(3) SBO VENTILATION 12539 2016-033 DOP 0010-13 Rev 07 ProcedureSEISMIC EVENT RETRIEVAL/EVALUATION 12593 2016-083 EC 404969 Facility Change MOV 2-3906 TO BE CHANGED TO MANUALLY OPERATED VALVE 12570 2016-167 DOP 1500-02 ProcedureTORUS WATER COOLING MODE OF LOW PRESSURE COOLANT INJECTION SYSTEM 12723 2016-205 UFSAR Change No. 16-012 ProcedureAppendix R Elevated Temperature and HPCI Operation 12912 2017-045 EC 618693 Facility Change DISPOSITION OF 175 FT-LBF FOR THE MOUNTING BOLTS ON U3 MSIVS LIMIT SWITCH MOUNTING PLATES Applicability Determinations: 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT 0000622072 20171115 BREAKER TRIP SETTING CHANGE AT MCC 2-7826-1F3                   FOR MOTOR FOR 2A REACTOR FEED PUMP DISCHARGE VALVE  
 
MOV 2-3201-A 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT  


ADAMS Accession Number ML17363A442}}
ADAMS Accession Number ML17363A442}}

Latest revision as of 07:37, 22 October 2019

Supplemental Request for Information for 50.59 Inspection (DRS-A.Shaikh)
ML17363A442
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/21/2017
From:
NRC/RGN-III
To:
References
Download: ML17363A442 (4)


Text

December 21, 2017 NRC Supplement to NRC Letter - INFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 BASELINE INSPECTION DATED November 17, 2017 (Hereafter Items referred to are from this NRC Letter).

NRC Supplemental Information Requests for - Dresden Station The following Evaluations, Screenings, and Applicability Determinations are requested:

Evaluations:

ESSENTIAL SERVICES BUS UFSAR AND TECHNICAL SPECIFICATION BASES 2016-04-001 EC 405313 UPDATE UTILIZE MSIV 2A SWITCH AS THE RPS 2016-03-002 TCCP 405013 SIGNAL FOR FAILED 1B CONTACT EC 380008, 383022, UFSAR On-Line Noble Metals Chemical (OLNC) 2016-03-001 Change 16-002 Injection for Unit 2 and Unit 3 2016-10-001 EC 391644 Reactor and Diesel Building Flood Barriers UFSAR tracking Revise references within UFSAR Section 2016-05-001 number 15-019 9.6.4.1.5 2016-03-002 TCCP 405013 Reactor and Diesel Building Flood Barriers Screenings:

2017- FAILURE OF UNIT 2 125 VDC POWER 13085 212 DOA 6900-02 Procedure SUPPLY 2017- Facility Basis for Declassification of Power Supplies for 13058 187 EC 402740 Change RWCU Leak Detection Panels to Non-EQ INSTALL TEMPORARY 120V FEED FROM 2016- Facility UNIT 2 SBO UPS TO UNIT 3 SBO ENGINE 12751 228 EC 406198 Change CONTROL CIRCUIT 405048,405049, 405050,405051, 2016- 405052,405053, Facility UTILIZE 2A SWITCH AS THE RPS SIGNAL 12566 059 405054 Change FOR THE FAILED 1A and 1B CONTACT ADAMS Accession Number ML17363A442

2015- TRM Change 12475 356 15-014 Revise TRM Sections 3.3.e, and Section 3.7.k 2015- Facility Temporary Installation of Emergency Lighting 12242 144 EC 402314 Change Units (ELU) for the 903-39 Panels MR90 CONNECT BATTERY CHARGER 3-2017- Facility 8350-3B DIRECTLY TO CHARGE NEW U3 12993 123 MR90 618106 Change BOP 250VDC BATTERY 2017- DOS 6620-08 SBO 2(3) DIESEL GENERATOR 12970 101 Rev 03 Procedure OVERSPEED TRIP TEST 2017- DOP 6900-06 12908 041 Rev 39 Procedure 125 VDC GROUND DETECTION UNIT 2 Jumper Cell 3 and Cell 110 on 250 VDC 12836 2016-51 EC 407161 Facility Station Battery 2017- Facility 13061 190 EC 618606 Change Unit 1 Fuel Oil Transfer System Replacement 2017- DOP 3200-09, 13031 160 rev 27 Procedure ZINC INJECTION SYSTEM OPERATION 2017-13018 147 DGA-12 rev76 Procedure LOSS OF OFFSITE POWER 2017- DSSP 0200-S 12995 125 rev 17 Procedure SDC COLD SHUTDOWN METHOD 2017- Facility Largest Single Load For Emergency Diesel 12890 023 17-002 Change Generators Facility NUCLEAR FUEL TRANSITION TO AREVA 12789 2016-46 EC 393280 Change ATRIUM 10XM 2015- DGP 04-01 Rev 12269 169 32 Procedure FUEL MOVES AND REFUELING 2015- DOP 5750-02 12193 093 Rev 44 Procedure REACTOR BUILDING VENTILATION 2015- DOP 0220-01 12233 135 Rev 12 Procedure RPV HEAD COOLING 2015- Facility RWCU HELB CALC IN EQ ZONE 28/

12491 372 EC 402480 Change REVISION 1 OF CALC.DR-067-M-001 ADAMS Accession Number ML17363A442

2015- Facility 12214 116 EC 399633 Change FW Check Valve Test Taps "A" Line - U2 2015- Facility Installation of New 2-1201-1 Valve During 12283 182 WO 1312947-01 Change D2R24 2016- Facility 12587 080 UFSAR 5.4.6.3 Change Revision to UFSAR section 5.4.6.3 2015- DAN 902(3)-3 D-12261 161 4 Rev13 Procedure ISOL CONDR LVL HI/LO 2015- DOP 1300-02 Procedur AUTOMATIC OPERATION OF ISOLATION 12262 162 Rev 27 e CONDENSER 2015- DOP 1300-03 MANUAL OPERATION OF THE ISOLATION 12263 163 Rev 36 Procedure CONDENSER 2015- Facility Hardened Containment Vent System -

12404 289 EC 400578 Change Modification - U3 Online 2016- DOP 6620-21 12510 005 Rev 08 Procedure UNIT 2(3) SBO VENTILATION 2016- DOP 0010-13 12539 033 Rev 07 Procedure SEISMIC EVENT RETRIEVAL/EVALUATION 2016- Facility MOV 2-3906 TO BE CHANGED TO 12593 083 EC 404969 Change MANUALLY OPERATED VALVE 2016- TORUS WATER COOLING MODE OF LOW 12570 167 DOP 1500-02 Procedure PRESSURE COOLANT INJECTION SYSTEM 2016- UFSAR Change Appendix R Elevated Temperature and HPCI 12723 205 No.16-012 Procedure Operation DISPOSITION OF 175 FT-LBF FOR THE 2017- Facility MOUNTING BOLTS ON U3 MSIVS LIMIT 12912 045 EC 618693 Change SWITCH MOUNTING PLATES Applicability Determinations:

0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT BREAKER TRIP SETTING CHANGE AT MCC 2-7826-1F3 FOR MOTOR FOR 2A REACTOR FEED PUMP DISCHARGE VALVE 0000622072 20171115 MOV 2-3201-A 0000388891 20171130 2013: UNIT 2 SR 480V MCC BUCKET REPLACEMENT PROJECT ADAMS Accession Number ML17363A442