{{#Wiki_filter:NUREG/CR-6850 FIRE PRA METHODOLOGYModule 1Internal Event, At
{{#Wiki_filter:NUREG/CR-6850 FIRE PRA METHODOLOGY Module 1 Internal Event, At-Power Probabilistic Risk Assessment Model for SNPP Sample Plant Description Nicholas Melly - Nuclear Regulatory Commission Fire PRA Workshop June 24, 2019 - June 28, 2019 Rockville, MD U.S. NRC HQ
-Power ProbabilisticRisk Assessment Model for SNPPSample Plant DescriptionNicholas Melly  
 
-Nuclear Regulatory CommissionFire PRA WorkshopJune 24, 2019  
Sample Problems / Sample Plant Fire PRA module will involve hands-on exercises Intent: To illustrate key aspects of the methodology through a cohesive set of sample problems All exercises are built around a common sample plant - the Simple Nuclear Power Plant (SNPP)
-June 28, 2019Rockville, MD U.S. NRC HQ Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
The exercises are designed such that taking all modules together presents a fairly complete picture of the FPRA methodology Not every task is covered by the SNPP sample problems Not every aspect of covered tasks are illustrated Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 2
-Power PRA Model for SNPP Slide 2Sample Problems / Sample PlantFire PRA module will involve hands
 
-on exercisesIntent: To illustrate key aspectsof the methodology through a cohesive set of sample problemsAll exercises are built around a common sample plant  
The SNPP: Intent and Approach The SNPP is not intended to reflect either regulatory compliance or good engineering practice It is purely an imaginary construct intended to highlight key aspects of the methodology - Nothing more!
-the Simple Nuclear Power Plant (SNPP)The exercises are designed such that taking all modules together presents a fairly complete picture of the FPRA methodologyNot every task is covered by the SNPP sample problemsNot every aspect of covered tasks are illustrated Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
The SNPP has been kept as simple as possible while still serving the needs of the training modules Aspects of the plant are assumed for purposes of the training exercises, e.g.,:
-Power PRA Model for SNPP Slide 3The SNPP: Intent and ApproachThe SNPP is not intended to reflect either regulatory compliance or good engineering practiceIt is purely an imaginary construct intended to highlight key aspects of the methodology  
BOP equipment not covered in detail Some systems are assumed to remain available Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 3
-Nothing more!The SNPP has been kept as simple as possible while still serving the needs of the training modulesAspects of the plant are assumed for purposes of the training exercises, e.g.,:BOP equipment not covered in detailSome systems are assumed to remain available Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
 
-Power PRA Model for SNPP Slide 4The SNPP: Plant CharacteristicsPWR with one primary coolant loopOne steam generator, one RCP, one pressurizerChemical volume control/high
The SNPP: Plant Characteristics PWR with one primary coolant loop One steam generator, one RCP, one pressurizer Chemical volume control/high-pressure injection system Residual heat removal system Secondary side includes:
-pressure injection systemResidual heat removal systemSecondary side includes:Main steam and feedwater loop for the single steam generator (not modeled)Multiple train auxiliary feedwater system to provide decay heat removalSupport systems includes:CCW (not modeled)Instrument airAC and DC powerInstrumentationSee Chapter 2 for complete plant description Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
Main steam and feedwater loop for the single steam generator (not modeled)
-Power PRA Model for SNPP Slide 5The SNPP: Primary Systems P&ID HPI-A HPI-B MOV-1 MOV-9 RHR HEAT EXCHANGER CV-3 CV-4 LETDOWN HEAT EXCHANGER FO MOV-5 MOV-6 CV-2 MOV-2 OPERATED VIA SOV-2 (AIR)TI-1 FC CCW CCW LI-2 LI-1 SKID MOUNTED AIR COMPRESSOR AIR SUPPLY VCT PZR MOV-13 FC OPERATED VIA SOV-1 WITH N 2 BACKED BY AIR AOV-1 (PORV)PT-1 SG RV MOV-7 MOV-3 MOV-4 MOV-20 LI-3 LI-4 AOV-3 OPERATED VIA SOV (AIR)RHR PUMP MOV-8 RWST 3 5/23/12 A-10 Revision No
Multiple train auxiliary feedwater system to provide decay heat removal Support systems includes:
.: Date: Drawing No
CCW (not modeled)
.: PRIMARY SYSTEM P & I D SNPP RCP-1 Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
Instrument air AC and DC power Instrumentation See Chapter 2 for complete plant description Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 4
-Power PRA Model for SNPP Slide 6 SG MOV-14 MOV-15 MOV-11 MOV-10 MOV-18 MOV-19 MOV-16 MOV-17 MSIV CST AFW-B (STEAM)AFW-A AFW-C (DIESEL DRIVEN
 
)V-11 L.O.GOVERNOR FROM FEEDWATER TO TURBINE CONDENSER ATOMOSPHERE RELIEF VALVE AOV-4 A-1 STEAM TURBINE 2 5/23/12 A-11 Revision No
The SNPP: Primary Systems P&ID SKID MOUNTED AIR COMPRESSOR OPERATED VIA SOV-1 WITH N2                                                                                    AIR BACKED BY AIR                                                                                  SUPPLY FC AOV-1       MOV-13 (PORV)                                                                CCW                                                        LI-1                  LI-2 SG                                                                  TI-1 FC                                              RWST PT-1 PZR                                        LETDOWN HEAT                                         VCT EXCHANGER OPERATED VIA SOV-2 (AIR)
.: Date: Drawing No
MOV-2 MOV-5  MOV-6 FO RV MOV-7                                                              AOV-3 RCP-1                  OPERATED VIA SOV                                                 CV-2 (AIR)                       HPI-A MOV-1 CV-3 MOV-9 MOV-20 HPI-B CV-4 LI-3                LI-4 MOV-3 MOV-4 RHR HEAT EXCHANGER MOV-8 RHR PUMP SNPP CCW                                                                                                      Drawing No.:
.: SECONDARY SYSTEM P & I D SNPP LI-6 LI-5        FCThe SNPP: Secondary Systems P&ID Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
A-10 Date:
-Power PRA Model for SNPP Slide 7 SWGR-1 RCP-1 UAT-1 SWGR-2 Spare COMP-1 SST-1 LC-1 MCC-1 SST-2 LC-2 MCC-2 BC-1 SWGR-A AFW-A HPI-A SUT-1 SST-A LC-A SWGR-B RHR-B HPI-B SST-B LC-B ATS-1 EDG-A EDG-B G MCC-A 1 BC-A MOV-1 MOV-3 MOV-5 MOV-7 MOV-10 MOV-13 MOV-16 (Racked Out
PRIMARY SYSTEM                                                5/23/12 P&ID Revision No.:
)BC-B MCC-B 1 MOV-2 MOV-4 MOV-6 MOV-8 MOV-9 MOV-17 MOV-20 MOV-19 MOV-18 DC BUS-A VITAL-A TI-1 SOV-1 LI-5 LI-3 ANN-1 INV-A BAT-A DC BUS-B VITAL-B LI-2 LI-4 PT-1 INV-B BAT-B SOV-3 SOV-2 SWGR-B SWGR-A EDG-A PNL-A PNL-B MOV-14 MOV-11 MOV-15 Vol Reg DC BUS-1 BAT-1 RCP-1 NON-VITAL DC LOADS SWYD OFF-SITE POWER 4 5/23/12 A-12 Revision No
3 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 5
.: Date: Drawing No
 
.: ELECTRICAL ONE-LINE DIAGRAM SNPP LI-1 LI-6 EDG-B HPI-A AFW-A RHR-B HPI-B AOV-4The SNPP: Electrical One
The SNPP: Secondary Systems P&ID ATOMOSPHERE RELIEF VALVE AOV-4 FC TO TURBINE CONDENSER MSIV SG                                              GOVERNOR STEAM TURBINE MOV-14            MOV-15 CST LI-5        LI-6 MOV-11 AFW-B (STEAM)     A-1              V-11 L.O.
-Line Diagram Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
MOV-10 AFW-A MOV-18 AFW-C (DIESEL DRIVEN)
-Power PRA Model for SNPP Slide 8The SNPP: General Plant Layout  
FROM FEEDWATER MOV-19 MOV-16 MOV-17 SNPP                          Drawing No.:
-Plan SECURITY BLDG.AUX BLDG.DG BLDG.SWITCH YARD INTAKE STRUCTURE TURBINE BLDG
A-11 Date:
.CONTAINMENT RWST AA AA CST DG-B DG-A MAIN TRANSFORMER UAT SUT YARD 14 7 12 8 B 8 A 15 13 BATTERY ROOM 1 1 6/22/09 A-01 Revision No
SECONDARY SYSTEM                                5/23/12 P&ID Revision No.:
.: Date: Drawing No
2 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 6
.: PLANT LAYOUT GENERAL SNPP Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
 
-Power PRA Model for SNPP Slide 9The SNPP: Plant Layout  
The SNPP: Electrical One-Line Diagram SWYD                                                  OFF-SITE POWER G                                                                                                                      EDG-A                                                                                                    EDG-B UAT-1                                                           SUT-1 SWGR-1                                 SWGR-2                                 SWGR-A                                                                                                      SWGR-B RCP-1               Spare                                              HPI-A                    AFW-A                                                  RHR-B                    HPI-B SST-1                                                   SST-2             SST-A                                                                                                                                                SST-B LC-1                                 LC-2                                LC-A                                                                                                                     LC-B COMP-1                                                                           MCC-A1                                                                                  MCC-B1 MCC-1                                  MCC-2 MOV-7 MOV-1   MOV-3   MOV-5                   MOV-10   MOV-13   MOV-16           MOV-2   MOV-4   MOV-6   MOV-8   MOV-9   MOV-17   MOV-20           MOV-18  MOV-19 ATS-1 (Racked Out)
-Elevation Containment and Auxiliary Building MAIN CONTROL ROOM CABLE SPREADING ROOM SWITCHGEAR ROOMS RHR PUMP ROOM CHARGING PUMP ROOM
BC-A                                                                                                                                               BC-B BAT-A                                                BAT-B BC-1 BAT-1                                                             DC BUS-A                                                                                                        DC BUS-B DC BUS-1 Vol Reg INV-A                             PNL-A                                       PNL-B                                                               INV-B             RHR-B HPI-B HPI-A AFW-A MOV-11  MOV-14 NON-VITAL DC MOV-15 LOADS      RCP-1   AOV-4 VITAL-A                                                                                                                                                                VITAL-B SOV-2 SWGR-A                                       SWGR-B EDG-A      SOV-3                        EDG-B LI-1   LI-3  LI-5  SOV-1 TI-1  ANN-1                                                                                                                          PT-1          LI-2    LI-4            LI-6 SNPP                                                       Drawing No.:
+70 FT+55 FT+40 FT+20 FT+0 FT GRADE-20 FT MOV-7 RCP-1 SOV-1 PRESSURIZER AOV-1 MOV-13 PLANT AIR N 2 5 6 9 10 11 2 4 A 4 B 7 1 3 2 7/21/11 A-02 Revision No
A-12 Date:
.: Date: Drawing No
ELECTRICAL                                                                              5/23/12 ONE-LINE DIAGRAM Revision No.:
.: PLANT LAYOUT SECTION AA SNPP Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
4 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 7
-Power PRA Model for SNPP Slide 10The SNPP: Auxiliary Building  
 
-RHR Pump Room NOTES: 1. VERTICAL PIPE PENETRATION TO UPPER ELEVATION
The SNPP: General Plant Layout - Plan INTAKE 14 STRUCTURE AA SECURITY CST                            BLDG.
.2. PENETRATION TO UPPER FLOOR IS SEALED
7 8B DG      DG-B                              CONTAINMENT SWITCH BLDG.
.UP MOV-3 MOV-4 RHR PUMP RHR HX VCBT 10 (NOTE 2)HCBT 0 (NOTE 2)HCBT: HORIZONTAL CABLE TRAY VCBT: VERTICAL CABLE TRAY MOV-8 NOTE 1 MOV-20 4 B 4 A MOV-10 MOV-11 MOV-15 MOV-14 AFW-A AFW-B 2 7/21/11 A-03 Revision No
YARD                       8A              12 DG-A TURBINE BLDG.
.: Date: Drawing No
UAT                                                RWST MAIN                                     AUX BLDG.
.: AUX BLDG EL. - 20 FT SNPP Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
TRANSFORMER SUT BATTERY 15 ROOM 1 AA 13 YARD SNPP Drawing No.:
-Power PRA Model for SNPP Slide 11The SNPP: Auxiliary Building
A-01 Date:
-Charging Pump Room NOTE: 1. VERTICAL PIPE PENETRATING THE FLOOR.UP VCBT 0 A VCBT: VERTICAL CABLE TRAY VCBT 0 B MOV-1 MOV-9 AOV-3 HPI-A HPI-B MOV-6 MOV-5 NOTE 1 MOV-2 VCT AOV-2 RWST LETDOWN HX CV-3 CV-4 CV-2 1 6/22/09 A-04 Revision No
PLANT LAYOUT 6/22/09 GENERAL           Revision No.:
.: Date: Drawing No
1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 8
.: AUX BLDG EL. 0 FT SNPP 2 Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
 
-Power PRA Model for SNPP Slide 12The SNPP: Auxiliary Building  
The SNPP: Plant Layout - Elevation Containment and Auxiliary Building PLANT AIR SOV-1              7 N2 AOV-1 MOV-13 PRESSURIZER
-Switchgear Rooms UP VCBT +20 A VCBT +20 B HCBT +35 A HCBT: HORIZONTAL CABLE TRAY VCBT: VERTICAL CABLE TRAY HCBT +37 A SWITCHGEAR ROOM A SWITCHGEAR ROOM B BATTERY ROOM A BATTERY ROOM B 120 VAC-A MCC-A 120 VAC-B MCC-B SST-A 4 KV BUS-A 4 KV BUS-B 120 V DC-A 120 V DC-B SST-B LC-A LC-B BC-A INV-A PNL-A BC-B INV-B PNL-B SWG ACCESS ROOM 6 5 7 10 11 9 HCBT +37 A 1 6/22/09 A-05 Revision No
                                                                                            +70 FT 1  MAIN CONTROL ROOM
.: Date: Drawing No
                                                                                            +55 FT 3  CABLE SPREADING ROOM
.: AUX BLDG EL. +20 FT SNPP Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
                                                                                            +40 FT SWITCHGEAR ROOMS              5 6 9 10 11 RCP-1                                        +20 FT MOV-7 CHARGING PUMP ROOM              2
-Power PRA Model for SNPP Slide 13The SNPP: Auxiliary Building  
                                                                                            +0 FT GRADE RHR PUMP ROOM              4A 4B
-Cable Spreading Room UP HCBT: HORIZONTAL CABLE TRAY VCBT: VERTICAL CABLE TRAY HCBT +50 B VCBT +40 B VCBT +40 A HCBT +50 A 3 1 6/22/09 A-06 Revision No
                                                                                            -20 FT SNPP                Drawing No.:
.: Date: Drawing No
A-02 PLANT LAYOUT            Date:
.: AUX BLDG EL. +40 FT CABLE SPREADING ROOM SNPP Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
7/21/11 SECTION AA            Revision No.:
-Power PRA Model for SNPP Slide 14The SNPP: Auxiliary Building  
2 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 9
-Main Control Room UP MAIN CONTROL ROOM KITCHEN MCB SHIFT SUPERVIS OR OFFICE CONTROL ROOM ACCESS 7 1 1 6/22/09 A-07 Revision No
 
.: Date: Drawing No
The SNPP: Auxiliary Building -
.: AUX BLDG MAIN CONTROL ROOM SNPP Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
RHR Pump Room MOV-4    MOV-3 MOV-8 MOV-11      MOV-10 RHR PUMP MOV-14 MOV-20 MOV-15 AFW-B       AFW-A RHR                      NOTES:
-Power PRA Model for SNPP Slide 15The SNPP: Turbine Building AOV-4 MOV-16 MOV-19 MOV-17 AFW-C (Diesel Driven
HX
)V-12 CST HCBT +10 A HCBT +10 B 4 KV BUS 1 4 KV BUS 2 SST-1 LC-1 SST-2 LC-2 250 V/DC BUS-1 BC-1 MCC-1 MCC-2 AIR COMPRESSOR 1 MOV-18 ATS BAT-1 BATTERY ROOM 15 12 1 1 6/22/09 A-08 Revision No
: 1. VERTICAL PIPE PENETRATION TO UPPER ELEVATION.
.: Date: Drawing No
: 2. PENETRATION TO UPPER 4A            NOTE 1              FLOOR IS SEALED.
.: TURBINE BLDG EL. 0 FT SNPP Fire PRA Workshop 2019, Rockville, MDModule 1: Internal Event, At
HCBT 0 (NOTE 2)                        4B                                                UP HCBT: HORIZONTAL CABLE TRAY VCBT: VERTICAL CABLE TRAY VCBT 10 (NOTE 2)
-Power PRA Model for SNPP Slide 16The SNPP: Main Control Board Layout ELECTRICAL TURBINE AND MAIN FEED RX CONTROL PRESSURELZER CONTROL AUX. FEEDWATER HPI + RHR SW + CCW DG-A DG-B AOV-1 PT-1 MOV-13 MOV-14 , MOV-15 MOV-17 , MOV-16 , MOV-19 AUX. FEEDWATER PUMP A , PUMP C MOV-11 , MOV-10 , MOV-18 SEE DETAIL BELOW LI-1 LI-2 TI-1 MOV-6 MOV-5 RHR PUMP LI-3 LI-4 MOV-4 MOV-3 MOV-9 MOV-1 AOV-3 PUMP HPI-B PUMP HPI-A MOV-2 AOV-2 MOV-8 MOV-7 DETAIL FROM ABOVE TURBINE MAIN FEED CB-6 CB-4 CB-2 CB-1 CB-3 CB-5 CB-7 AOV-4 MOV-20 1 6/22/09 A-09 Revision No
SNPP                  Drawing No.:
.: Date: Drawing No
A-03 Date:
.: MAIN CONTROL ROOM MAIN CONTROL BOARD SNPP}}
AUX BLDG 7/21/11 EL. - 20FT            Revision No.:
2 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 10
 
The SNPP: Auxiliary Building -
Charging Pump Room MOV-9  MOV-1      AOV-3 MOV-5 CV-3 RWST HPI-B                  MOV-6 HPI-A AOV-2 CV-4          CV-2                    NOTE:
VCT            1. VERTICAL PIPE PENETRATING LETDOWN            NOTE 1          MOV-2                      THE FLOOR.
HX 2
UP VCBT: VERTICAL CABLE TRAY VCBT 0A VCBT 0B SNPP                  Drawing No.:
A-04 Date:
AUX BLDG 6/22/09 EL. 0FT              Revision No.:
1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 11
 
The SNPP: Auxiliary Building -
Switchgear Rooms 7
10                                                        11 BATTERY                                                                                                                        BATTERY 5                                                                                      SWITCHGEAR                                          6 BC-A INV-A PNL-A 120V DC-A 120V DC-B ROOM A                 SWITCHGEAR                                                                                             ROOM B ROOM A                                                     ROOM B SST-A                                                                       SST-B 4KV BUS-B BC-B INV-B PNL-B 4KV BUS-A           LC-A                                                                     LC-B MCC-A                                                                         MCC-B SWG ACCESS                                                                                                                                        HCBT: HORIZONTAL CABLE TRAY ROOM                                                                                                                                            VCBT: VERTICAL CABLE TRAY 120VAC-A                                                                            UP 120VAC-B HCBT +37A 9
HCBT +35A VCBT +20B                                HCBT +37A VCBT +20A SNPP                  Drawing No.:
A-05 Date:
AUX BLDG 6/22/09 EL. +20FT            Revision No.:
1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 12
 
The SNPP: Auxiliary Building -
Cable Spreading Room HCBT +50A                                    VCBT +40B VCBT +40A                                  HCBT +50B 3
HCBT: HORIZONTAL CABLE TRAY VCBT: VERTICAL CABLE TRAY UP SNPP                    Drawing No.:
A-06 AUX BLDG                Date:
6/22/09 EL. +40FT Revision No.:
CABLE SPREADING ROOM 1
Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 13
 
The SNPP: Auxiliary Building -
Main Control Room 7
MCB MAIN CONTROL ROOM 1
SHIFT KITCHEN                        SUPERVIS OR OFFICE CONTROL ROOM ACCESS                   UP SNPP        Drawing No.:
A-07 Date:
AUX BLDG 6/22/09 MAIN CONTROL ROOM Revision No.:
1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 14
 
The SNPP: Turbine Building CST 4KV BUS 1      SST-1      LC-1                                    V-12 AOV-4 4KV BUS 2          SST-2 LC-2 1
MOV-18 AFW-C (Diesel Driven)
MOV-19 MCC-1    MCC-2                                  MOV-17 MOV-16 12 ATS BC-1 250V/DC BUS-1 HCBT +10A HCBT +10B BATTERY ROOM BAT-1   15                  AIR COMPRESSOR 1 SNPP        Drawing No.:
A-08 Date:
TURBINE BLDG 6/22/09 EL. 0FT    Revision No.:
1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 15
 
The SNPP: Main Control Board Layout MOV-14, MOV-15 MOV-17, MOV-16, MOV-19 MOV-13                                                            AUX. FEEDWATER PUMP A, PUMP C AOV-4        AOV-1                                                              MOV-11, MOV-10, MOV-18 TURBINE PT-1                                            SEE DETAIL BELOW MAIN FEED PRESSURELZER DG-A    DG-B AUX.
CONTROL FEEDWATER ELECTRICAL      TURBINE AND MAIN FEED                      RX CONTROL              HPI + RHR      SW +
CB-1                                 CCW CB-7 CB-6         CB-4            CB-2                      CB-3          CB-5 TI-1                RHR PUMP LI-2                    MOV-5 LI-1                        MOV-6 LI-4                                   MOV-3 LI-3                                    MOV-4 PUMP HPI-A                                    MOV-1 PUMP HPI-B                                   MOV-9 AOV-2 MOV-2                                    AOV-3 MOV-20                                              SNPP                  Drawing No.:
A-09 MOV-7             MOV-8 Date:
DETAIL FROM                                                          MAIN CONTROL ROOM 6/22/09 ABOVE MAIN CONTROL BOARD            Revision No.:
1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 16}}

Latest revision as of 17:24, 19 October 2019

01_02 Sample Plant Overview
ML19162A417
Person / Time
Issue date: 06/13/2019
From: Nick Melly
NRC/RES/DRA
To:
T. Rivera
Shared Package
ML19162A411 List:
References
Download: ML19162A417 (16)


Text

NUREG/CR-6850 FIRE PRA METHODOLOGY Module 1 Internal Event, At-Power Probabilistic Risk Assessment Model for SNPP Sample Plant Description Nicholas Melly - Nuclear Regulatory Commission Fire PRA Workshop June 24, 2019 - June 28, 2019 Rockville, MD U.S. NRC HQ

Sample Problems / Sample Plant Fire PRA module will involve hands-on exercises Intent: To illustrate key aspects of the methodology through a cohesive set of sample problems All exercises are built around a common sample plant - the Simple Nuclear Power Plant (SNPP)

The exercises are designed such that taking all modules together presents a fairly complete picture of the FPRA methodology Not every task is covered by the SNPP sample problems Not every aspect of covered tasks are illustrated Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 2

The SNPP: Intent and Approach The SNPP is not intended to reflect either regulatory compliance or good engineering practice It is purely an imaginary construct intended to highlight key aspects of the methodology - Nothing more!

The SNPP has been kept as simple as possible while still serving the needs of the training modules Aspects of the plant are assumed for purposes of the training exercises, e.g.,:

BOP equipment not covered in detail Some systems are assumed to remain available Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 3

The SNPP: Plant Characteristics PWR with one primary coolant loop One steam generator, one RCP, one pressurizer Chemical volume control/high-pressure injection system Residual heat removal system Secondary side includes:

Main steam and feedwater loop for the single steam generator (not modeled)

Multiple train auxiliary feedwater system to provide decay heat removal Support systems includes:

CCW (not modeled)

Instrument air AC and DC power Instrumentation See Chapter 2 for complete plant description Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 4

The SNPP: Primary Systems P&ID SKID MOUNTED AIR COMPRESSOR OPERATED VIA SOV-1 WITH N2 AIR BACKED BY AIR SUPPLY FC AOV-1 MOV-13 (PORV) CCW LI-1 LI-2 SG TI-1 FC RWST PT-1 PZR LETDOWN HEAT VCT EXCHANGER OPERATED VIA SOV-2 (AIR)

MOV-2 MOV-5 MOV-6 FO RV MOV-7 AOV-3 RCP-1 OPERATED VIA SOV CV-2 (AIR) HPI-A MOV-1 CV-3 MOV-9 MOV-20 HPI-B CV-4 LI-3 LI-4 MOV-3 MOV-4 RHR HEAT EXCHANGER MOV-8 RHR PUMP SNPP CCW Drawing No.:

A-10 Date:

PRIMARY SYSTEM 5/23/12 P&ID Revision No.:

3 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 5

The SNPP: Secondary Systems P&ID ATOMOSPHERE RELIEF VALVE AOV-4 FC TO TURBINE CONDENSER MSIV SG GOVERNOR STEAM TURBINE MOV-14 MOV-15 CST LI-5 LI-6 MOV-11 AFW-B (STEAM) A-1 V-11 L.O.

MOV-10 AFW-A MOV-18 AFW-C (DIESEL DRIVEN)

FROM FEEDWATER MOV-19 MOV-16 MOV-17 SNPP Drawing No.:

A-11 Date:

SECONDARY SYSTEM 5/23/12 P&ID Revision No.:

2 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 6

The SNPP: Electrical One-Line Diagram SWYD OFF-SITE POWER G EDG-A EDG-B UAT-1 SUT-1 SWGR-1 SWGR-2 SWGR-A SWGR-B RCP-1 Spare HPI-A AFW-A RHR-B HPI-B SST-1 SST-2 SST-A SST-B LC-1 LC-2 LC-A LC-B COMP-1 MCC-A1 MCC-B1 MCC-1 MCC-2 MOV-7 MOV-1 MOV-3 MOV-5 MOV-10 MOV-13 MOV-16 MOV-2 MOV-4 MOV-6 MOV-8 MOV-9 MOV-17 MOV-20 MOV-18 MOV-19 ATS-1 (Racked Out)

BC-A BC-B BAT-A BAT-B BC-1 BAT-1 DC BUS-A DC BUS-B DC BUS-1 Vol Reg INV-A PNL-A PNL-B INV-B RHR-B HPI-B HPI-A AFW-A MOV-11 MOV-14 NON-VITAL DC MOV-15 LOADS RCP-1 AOV-4 VITAL-A VITAL-B SOV-2 SWGR-A SWGR-B EDG-A SOV-3 EDG-B LI-1 LI-3 LI-5 SOV-1 TI-1 ANN-1 PT-1 LI-2 LI-4 LI-6 SNPP Drawing No.:

A-12 Date:

ELECTRICAL 5/23/12 ONE-LINE DIAGRAM Revision No.:

4 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 7

The SNPP: General Plant Layout - Plan INTAKE 14 STRUCTURE AA SECURITY CST BLDG.

7 8B DG DG-B CONTAINMENT SWITCH BLDG.

YARD 8A 12 DG-A TURBINE BLDG.

UAT RWST MAIN AUX BLDG.

TRANSFORMER SUT BATTERY 15 ROOM 1 AA 13 YARD SNPP Drawing No.:

A-01 Date:

PLANT LAYOUT 6/22/09 GENERAL Revision No.:

1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 8

The SNPP: Plant Layout - Elevation Containment and Auxiliary Building PLANT AIR SOV-1 7 N2 AOV-1 MOV-13 PRESSURIZER

+70 FT 1 MAIN CONTROL ROOM

+55 FT 3 CABLE SPREADING ROOM

+40 FT SWITCHGEAR ROOMS 5 6 9 10 11 RCP-1 +20 FT MOV-7 CHARGING PUMP ROOM 2

+0 FT GRADE RHR PUMP ROOM 4A 4B

-20 FT SNPP Drawing No.:

A-02 PLANT LAYOUT Date:

7/21/11 SECTION AA Revision No.:

2 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 9

The SNPP: Auxiliary Building -

RHR Pump Room MOV-4 MOV-3 MOV-8 MOV-11 MOV-10 RHR PUMP MOV-14 MOV-20 MOV-15 AFW-B AFW-A RHR NOTES:

HX

1. VERTICAL PIPE PENETRATION TO UPPER ELEVATION.
2. PENETRATION TO UPPER 4A NOTE 1 FLOOR IS SEALED.

HCBT 0 (NOTE 2) 4B UP HCBT: HORIZONTAL CABLE TRAY VCBT: VERTICAL CABLE TRAY VCBT 10 (NOTE 2)

SNPP Drawing No.:

A-03 Date:

AUX BLDG 7/21/11 EL. - 20FT Revision No.:

2 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 10

The SNPP: Auxiliary Building -

Charging Pump Room MOV-9 MOV-1 AOV-3 MOV-5 CV-3 RWST HPI-B MOV-6 HPI-A AOV-2 CV-4 CV-2 NOTE:

VCT 1. VERTICAL PIPE PENETRATING LETDOWN NOTE 1 MOV-2 THE FLOOR.

HX 2

UP VCBT: VERTICAL CABLE TRAY VCBT 0A VCBT 0B SNPP Drawing No.:

A-04 Date:

AUX BLDG 6/22/09 EL. 0FT Revision No.:

1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 11

The SNPP: Auxiliary Building -

Switchgear Rooms 7

10 11 BATTERY BATTERY 5 SWITCHGEAR 6 BC-A INV-A PNL-A 120V DC-A 120V DC-B ROOM A SWITCHGEAR ROOM B ROOM A ROOM B SST-A SST-B 4KV BUS-B BC-B INV-B PNL-B 4KV BUS-A LC-A LC-B MCC-A MCC-B SWG ACCESS HCBT: HORIZONTAL CABLE TRAY ROOM VCBT: VERTICAL CABLE TRAY 120VAC-A UP 120VAC-B HCBT +37A 9

HCBT +35A VCBT +20B HCBT +37A VCBT +20A SNPP Drawing No.:

A-05 Date:

AUX BLDG 6/22/09 EL. +20FT Revision No.:

1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 12

The SNPP: Auxiliary Building -

Cable Spreading Room HCBT +50A VCBT +40B VCBT +40A HCBT +50B 3

HCBT: HORIZONTAL CABLE TRAY VCBT: VERTICAL CABLE TRAY UP SNPP Drawing No.:

A-06 AUX BLDG Date:

6/22/09 EL. +40FT Revision No.:

CABLE SPREADING ROOM 1

Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 13

The SNPP: Auxiliary Building -

Main Control Room 7

MCB MAIN CONTROL ROOM 1

SHIFT KITCHEN SUPERVIS OR OFFICE CONTROL ROOM ACCESS UP SNPP Drawing No.:

A-07 Date:

AUX BLDG 6/22/09 MAIN CONTROL ROOM Revision No.:

1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 14

The SNPP: Turbine Building CST 4KV BUS 1 SST-1 LC-1 V-12 AOV-4 4KV BUS 2 SST-2 LC-2 1

MOV-18 AFW-C (Diesel Driven)

MOV-19 MCC-1 MCC-2 MOV-17 MOV-16 12 ATS BC-1 250V/DC BUS-1 HCBT +10A HCBT +10B BATTERY ROOM BAT-1 15 AIR COMPRESSOR 1 SNPP Drawing No.:

A-08 Date:

TURBINE BLDG 6/22/09 EL. 0FT Revision No.:

1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 15

The SNPP: Main Control Board Layout MOV-14, MOV-15 MOV-17, MOV-16, MOV-19 MOV-13 AUX. FEEDWATER PUMP A, PUMP C AOV-4 AOV-1 MOV-11, MOV-10, MOV-18 TURBINE PT-1 SEE DETAIL BELOW MAIN FEED PRESSURELZER DG-A DG-B AUX.

CONTROL FEEDWATER ELECTRICAL TURBINE AND MAIN FEED RX CONTROL HPI + RHR SW +

CB-1 CCW CB-7 CB-6 CB-4 CB-2 CB-3 CB-5 TI-1 RHR PUMP LI-2 MOV-5 LI-1 MOV-6 LI-4 MOV-3 LI-3 MOV-4 PUMP HPI-A MOV-1 PUMP HPI-B MOV-9 AOV-2 MOV-2 AOV-3 MOV-20 SNPP Drawing No.:

A-09 MOV-7 MOV-8 Date:

DETAIL FROM MAIN CONTROL ROOM 6/22/09 ABOVE MAIN CONTROL BOARD Revision No.:

1 Fire PRA Workshop 2019, Rockville, MD Module 1: Internal Event, At-Power PRA Model for SNPP Slide 16