{{#Wiki_filter:August 2 3, 201 9  UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of
{{#Wiki_filter:August 23, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                 )
)        
                                                )
  )  TENNESSEE VALLEY AUTHORITY
TENNESSEE VALLEY AUTHORITY                       )           Docket No. 52-047-ESP
) Docket No. 52
                                                )
-047-ESP                    
(Clinch River Nuclear Site Early                 )
  ) (Clinch River Nuclear Site Early  
Site Permit Application)                        )
) Site Permit Application)
JOINT TRANSCRIPT CORRECTIONS Pursuant to the Commissions Order (Setting Deadline for Proposed Transcript Corrections) of August 19, 2019, the Tennessee Valley Authority and the staff of the U.S.
JOINT TRANSCRIPT CORRECTIONS Pursuant to the Commission's "Order (Setting Deadline for Proposed Transcript Corrections
Nuclear Regulatory Commission hereby provide joint transcript corrections for the August 14, 2019, hearing on the early site permit application for the Clinch River Nuclear Site.
)" of August 19, 2019, t he Tennessee Valley Authority and the staff of the U.S. Nuclear Regulatory Commission hereby provide joint transcript corrections for the August 14, 2019, hearing on the early site permit application for the Clinch River Nuclear Site.         Respectfully submitted, /Signed (electronically) by/
Respectfully submitted,
Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
                                            /Signed (electronically) by/
-14 A44 Washington, DC 20555
Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-14 A44 Washington, DC 20555-0001 Telephone: (301) 287-9115 Michael.Spencer@nrc.gov
-0001 Telephone: (301) 287-9115 Michael.Spencer@nrc.gov
                                            /Executed in accord with 10 CFR 2.304(d)/
  /Executed in accord with 10 CFR 2.304(d)/
Ryan C. Dreke, Esq.
Ryan C. Dreke, Esq.
Counsel for Tennessee Valley Authority Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902 Telephone: (865) 632
Counsel for Tennessee Valley Authority Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902 Telephone: (865) 632-8960 Fax: 865-632-6147 rcdreke@tva.gov Dated at Rockville, Maryland, this 23rd day of August 2019
-8960 Fax: 865-632-6147 rcdreke@tva.gov Dated at Rockville, Maryland
, this 23rd day of August 2019 ATTACHMENT Joint Transcript Corrections for the Clinch River ESP Mandatory Hearing Page(s) Line (s) Change  3 9 Insert "WALTER LEE, Director, Nuclear Emergency Preparedness, TVA" under "ALSO PRESENT."
5 4 Delete line (Tamsen Dozier is not TVA staff) 5 5 Delete line (Kenneth Erwin is not TVA staff) 5 7 Change "168" to "153" 5 new After line 7
, add a new line stating "Kenneth Erwin ---- 159" 13 8 Change "Phillip" to "Philip" 14 1 9 Change "Mr. Spencer" to "Mr. Dreke" 19 12 Change "-293 acres-" to "-293,000 acres-"
19 15 Change "-maintains-" to "-maintain-" 21 14 Change "-and analyzing-" to "-and analysis of-"
23 16-17 Change "-site mandatory requirements-"to "-site boundary requirements-"
26 2 Change "-regulator-" to "-regulatory
-" 26 10-11 Change "The application was originally submitted
- was originally submitted had-" to "The application as originally submitted had-" 27 5-6 Change "-application supplements issues had been resolved." to "-application supplements, issues had been resolved."
33 3 Change "-environmental aspects. Was effective-"
to "environmental aspects, and was effective-"
40 19 Change "efforts or" to "efforts of" 42 15  Change "ESP and" to "ESP, and" 43 12 Change "before" to "be for" 44 24 Change "perimeter" to "parameter" 45 4 Change "designed" to "design" 45 11 Change "perimeter" to "parameter"


Page(s) Line (s) Change 48 1 3 Change "locality" to "inimicality" 48 19 Change "test" to "tests,"
ATTACHMENT Joint Transcript Corrections for the Clinch River ESP Mandatory Hearing Page(s) Line(s)     Change 3         9      Insert WALTER LEE, Director, Nuclear Emergency Preparedness, TVA under ALSO PRESENT.
49 16 Change "construction operation" to "construction and operation" 50 16 Change "federal" to "federally" 51 25 Change "as" to "was" 53 12 Change "1022A" to "102(2)(A)"
5        4      Delete line (Tamsen Dozier is not TVA staff) 5        5      Delete line (Kenneth Erwin is not TVA staff) 5        7      Change 168 to 153 5        new    After line 7, add a new line stating Kenneth Erwin  159 13        8      Change Phillip to Philip 14        19    Change Mr. Spencer to Mr. Dreke 19        12    Change 293 acres to 293,000 acres 19        15    Change maintains to maintain 21        14    Change and analyzing to and analysis of 23      16-17    Change site mandatory requirementsto site boundary requirements 26        2      Change regulator to regulatory 26      10-11    Change The application was originally submitted - was originally submitted had to The application as originally submitted had 27        5-6    Change application supplements issues had been resolved. to application supplements, issues had been resolved.
53 13 Change "uses systematic" to "uses a systematic" 53 17 Change "1022C" to "102(2)(C)"
33        3      Change environmental aspects. Was effective to environmental aspects, and was effective 40        19    Change efforts or to efforts of 42        15    Change ESP and to ESP, and 43        12    Change before to be for 44        24    Change perimeter to parameter 45        4      Change designed to design 45        11    Change perimeter to parameter
53 20 Change "affects" to "effects" 5 4 4 Change "1022C" to 102(2)(C)"
5 4 7 Change "1022E" to "102(2)(E)"
57 20 Change "COL states" to "the COL stage" 59 16 Change "chief level and" to "chief level in" 61 12 Change "prospectus" to "perspective" 62 9 Change "CPL applicant" to "CP applicant" 64 4 Delete "I'm" that precedes the word "TVA
." 64 7 Change "-ESP-" to "-ESPA-"
64 12 Change "-in-" to "-and-"
64 22 Change "-only major features emergency plan, with-" to "only a major features emergency plan with-" 64 23 Change "-the ESP development have-" to "ESPA development has-" 66 16 Change "-dose base-" to "-dose
-based-" 68 2 Change "-planned-" to "-land-"
68 3 Change "It-" to "If-"


Page(s) Line (s) Change 68 12 Change "-recognize a formal offsite plants-" to "-recognize that a formal offsite plan-"
2 Page(s) Line(s) Change 48      13  Change locality to inimicality 48      19  Change test to tests, 49      16   Change construction operation to construction and operation 50      16  Change federal to federally 51      25   Change as to was 53      12  Change 1022A to 102(2)(A) 53      13   Change uses systematic to uses a systematic 53      17  Change 1022C to 102(2)(C) 53      20  Change affects to effects 54      4    Change 1022C to 102(2)(C) 54      7   Change 1022E to 102(2)(E) 57      20  Change COL states to the COL stage 59      16  Change chief level and to chief level in 61      12  Change prospectus to perspective 62      9   Change CPL applicant to CP applicant 64      4    Delete Im that precedes the word TVA.
69 17-18 Change "-have several magnitudes reduced, likelihood of-" to "-have several magnitudes reduced likelihood of accidents-"
64      7    Change ESP to ESPA 64      12  Change in to and 64      22   Change only major features emergency plan, with to only a major features emergency plan with 64      23  Change the ESP development have to ESPA development has 66      16  Change dose base to dose-based 68      2    Change planned to land 68      3    Change It to If
70 15-16 Change "The first refer to as Criteria Alpha. Is that the EPZ-" to "The first, referred to as Criteria Alpha, is that the EPZ-"
70 19 Add the acronym ("PAG") in parentheses after the word "guide" 70 20-21 Change "-referred to as Criteria B, -" to "-referred to as Criteria Bravo,  -" 70 25 Change "-main-" to "-mean-"
71 10 Change "-main-to "-mean-"
71 13 Change "-insurance-" to "-assurance-"
72 12-13 Change "-in the Chapter 2 of the site safety analysis report. In that, in a future application-" to "-in Chapter 2 of the Site Safety Analysis Report in that, in a future application-"
75 2 Remove comma before and after "plume exposure pathway" 7 5 3 Change "exemption request" to "exemption requests" 7 5 1 1 Change "site. Where" to "site, where"  7 5 1 3 Change "core. And" to "core, and
" 7 6 2 Change "information. The four SMR designs are indicated" to "information from the four SMR designs indicated" 77 8 Change "combined license construction permit" to "combined license or construction permit" 77 9 Change "EPS" to "ESP" 77 13 Change "excavation and safety" to "excavation of safety" 77 22 Change "content" to "context" 78 4 Change "security to" to "security or to" 78 6 Change "cited" to "sited"


Page(s) Line (s) Change 78 8 Change "following" to "falling" and change "site." to "site,"
3 Page(s) Line(s) Change 68      12  Change recognize a formal offsite plants to recognize that a formal offsite plan 69    17-18  Change have several magnitudes reduced, likelihood of to have several magnitudes reduced likelihood of accidents 70    15-16  Change The first refer to as Criteria Alpha. Is that the EPZ to The first, referred to as Criteria Alpha, is that the EPZ 70      19  Add the acronym (PAG) in parentheses after the word guide Change referred to as Criteria B, to referred to as Criteria 70    20-21 Bravo,
78 9 Change "following" to "falling" 78 10 Change "site. And" to "site, and" 78 14 Change "planning, the plume exposure path rate, EPZ size and" to "planning plume exposure pathway EPZ sizing" 78 15 Change "associate" to "associated" 78 21 Change "planning. In" to "planning in" 78 22 Change "explosion path for" to "exposure pathway" 78 24 Change "TVA is" to "TVA's" 79 5 Change "were used in" to "will use the" 79 6 Change "explosion" to "exposure" 79 10 Change "explosion" to "exposure" 80 9 Delete "and" 80 10 Change "plans. Both of which consists of limit aspects" to "plans, both of which consist of limited aspects" 80 19 Change "or ETE." to "or ETE,"
80 20 Change "Which" to "which" 80 24 Change "plans. The" to "plans, the" 81 1 Change "applicants" to "applicant's" 81 7 Change "features and emergency" to "features emergency" 81 16 Change "EPA" to "EP" 81 18 Change "major feature" to "major features" 81 21 Change "EPA" to "EP" 8 3 13 Change "methodologies" to "methodology's" 8 4 3 Change "SECY 110152" to "SECY 0152" 5 Page(s) Line (s) Change 8 4 4-5 Change "SECY 150077" to "SECY 0077" 8 4 8 Change "to the adapt of an approach" to "to adapt an approach" 8 4 12 Change "use" to "used" 84 16 Change "pathway, EPZ," to "pathway EPZ" 8 4 1 8 Change "environment" to "environmental" 84 24 Change "pathway, EPZ," to "pathway EPZ" 85 3 Change "pathway, EPZ," to "pathway EPZ" 8 5 5 Change "and early" to "in early" 8 6 1 Change "exclusionary" to "exclusion area" 8 6 8 Change "intake" to "intact" 8 6 25 Change "into" to "and to" 8 7 1 4 Change "verified" to "verify" 87 24 Change "NUREG
-0396. Which" to "NUREG
-0396, which" 88 13 Change "pathway, EPZ," to "pathway EPZ" 88 15 Change "site. In" to "site, in" 88 16-17 Change "public. That" to "public, that" 8 9 4 Change "permit, applicants" to "permit applicant's" 89 5 Change "planning and exemptions" to "planning exemptions" 89 7 Delete "to" 89 24 Change "ESP. Unless" to "ESP, unless" 90 15 Change "the request exemptions" to "the requested exemptions" 90 22 Change "protection that" to "protection, that" 91 18 Change "protection that is dose savings" to "protection, that is dose savings," 91 25 Change "present in all" to "present and all"


6  Page(s) Line (s) Change 92 13 Change "Staffs" to "Staff's" 92 16 Change "52.18. And" to "52.18, and" 93 2 Change "major features of emergency" to "major features emergency" 93 7 Change "approach ed" to "approach" 93 14 Change" plan" to "plans" 93 20 Change "plans. Including" to "plans, including" 94 13 Change "28th
70      25  Change main to mean 71      10  Change main to mean 71      13   Change insurance to assurance 72    12-13  Change in the Chapter 2 of the site safety analysis report. In that, in a future application to in Chapter 2 of the Site Safety Analysis Report in that, in a future application 75      2   Remove comma before and after plume exposure pathway 75      3   Change exemption request to exemption requests 75      11  Change site. Where to site, where 75      13  Change core. And to core, and 76      2    Change information. The four SMR designs are indicated to information from the four SMR designs indicated 77      8    Change combined license construction permit to combined license or construction permit 77      9    Change EPS to ESP 77      13  Change excavation and safety to excavation of safety 77      22  Change content to context 78      4    Change security to to security or to 78      6    Change cited to sited
" to "2018" 9 8 7 Change "EPS" to "ESP" 98 13 Change "encourage" to "encouraged" 98 15 Change "a conference" to "the conference
" 98 25 Change "EPS" to "ESP" 99 2 Change "pathway for EPZ" to "pathway EPZ" 99 3 Change "request" to "requested" 99 6 Change "license of" to "license or" 99 8 Change "the implementation" to "that implementation" and change "pathway for" to "pathway" 99 10 Change "technology supports" to "technology, supports" 99 11 Change "EPZ. And" to "EPZ and" 99 15 Change "combined license of" to "combined license or" 99 19 Change "combined license of" to "combined license or" 99 24 Change "path for" to "pathway" 100 2 Change "pathway for" to "pathway" 100 10 Change "request" to "requests" 104 14 Change "from based" to "is based" 108 13 Change "about 80 feet about" to "about 80 feet above"


Page(s) Line (s) Change 10 9 20 Change "SEC" to "SE" 10 9 23 Change "permanent" to "permit" 110 22 Change "management and management" to "management
4 Page(s) Line(s) Change 78      8    Change following to falling and change site. to site, 78      9   Change following to falling 78      10  Change site. And to site, and 78      14  Change planning, the plume exposure path rate, EPZ size and to planning plume exposure pathway EPZ sizing 78      15  Change associate to associated 78      21   Change planning. In to planning in 78      22  Change explosion path for to exposure pathway 78      24  Change TVA is to TVAs 79      5   Change were used in to will use the 79      6    Change explosion to exposure 79      10   Change explosion to exposure 80      9    Delete and 80      10  Change plans. Both of which consists of limit aspects to plans, both of which consist of limited aspects 80      19  Change or ETE. to or ETE, 80      20   Change Which to which 80      24  Change plans. The to plans, the 81      1   Change applicants to applicants 81      7   Change features and emergency to features emergency 81      16   Change EPA to EP 81      18  Change major feature to major features 81      21  Change EPA to EP 83      13  Change methodologies to methodologys 84      3    Change SECY 110152 to SECY-11-0152
-and management
-" 110 23 Change "conditions and permit conditions" to "conditions
-permit conditions
-" 110 24 Change "Some of the management" to "Some of them, management" 111 13 Change "de novo" to "the novel" 111 22 Change "meet their" to "meet the" 114 9 Change "-past precedence-" to "-past precedents-"
115 17 Change "There is-" to "There are-"
117 13 Change "ask you a" to "answer your" 119 25 Change "EPS" to "ESP" 120 1 Change "Not two
-miles from outside boundary, nothing" to "Not two
-miles or site boundary, nothing" 120 15-16 Change "dose distance" to "dose at distance" 123 25 Change "then" to "than" 12 8 21  Change "EPA" to "EPZ" 128 22 Change "Staff sees a little difference" to "Staff sees little difference" 130 23-34 Change "boundary EPZ. The situation" to "boundary EPZ, in that situation" 131 10 Change "context" to "contexts" 132 21 Change "MR. SCOTT:" to "COMMISSIONER BARAN:"
133 17-18 Change "here. They" to "here, they" and change "uniqueness" to "uniqueness in" 133 23 Change "to NUREG
-0396" to "in NUREG
-0396" 13 5 2 Change "MS. HART:" to "
M S. MILLIGAN:"
8  Page(s) Line (s) Change  13 9 1 Change "an RAI" to "in an RAI" 141 20 Change "use" to "used" 141 21 Change "a parameters" to "parameters" 146 9-10 Change "Today Ruth Horton and I, TVA Program Manager for Environmental Support and I-" to "Today Ruth Horton, TVA Program Manager for Environmental Support, and I-"
146 23 Change "-Tennessee River Water Shed-" to "-Tennessee River Watershed-"
147 2 Change "-construction and operation of an SMR. And is based on-" to "construction and operation of an SMR, and is based on-"
147 11 Change "NRC's final environment impact statement-" to "NRC's Final Environmental Impact Statement-"
147 15-16 Change "-we have performed-" to "-we would perform-"
150 14-15 Change "-with state
-- with the state-" to "-with the state-"
152 3-5 Change "...which included site visits, public meetings, a readiness review, an environmental audit, were critical to the-" to "...which included site visits, public meetings, a readiness review, and an environmental audit, were critical to the-"
155 8 Change "staff and their" to "staff in their" 156 13 Change "acres. And" to "acres and" 156 20-21 Change "redressed. And" to "redressed and" 158 5 Change "analysis" to "analyses" 158 12 Change "sites. And" to "sites and" 161 4 Change "which as" to "such as" 161 1 3 Change "sites. And" to "sites and" 162 5 Change "SRP" to "E
-SRP" 163 15 Change "postulated acts and impacts" to "postulated accident impacts" 164 7 Change "including" to "including:
"
9  Page(s) Line (s) Change 166 14 Change "wouldn't be subject to" to "would be subject to" 168 7-8 Change "comparable. And" to "comparable and" 169 10 Change "areas. And" to "areas and" 170 16-17 Change "-and this programmatic agreement arrangement-" to "-and with this programmatic agreement-"
171 20 Change "PD." to "PPE."
174 10 Change "Phillip" to "Philip" 17 6 24-25 Change "and g-water, and the excavation" to "and dewatering the excavation" 17 7 11 Change: "they can do monitoring" to "they committed to do monitoring" 178 25 Change "-addressed properly-" to "-addressed promptly-"
183 1 6 Change "talk about" to "talked about" 18 6 13 Change "framework" to "frameworks" 186 19 Change "framework" to "frameworks"


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of
5 Page(s) Line(s) Change 84      4-5  Change SECY 150077 to SECY-15-0077 84        8  Change to the adapt of an approach to to adapt an approach 84      12  Change use to used 84      16  Change pathway, EPZ, to pathway EPZ 84      18  Change environment to environmental 84      24  Change pathway, EPZ, to pathway EPZ 85        3  Change pathway, EPZ, to pathway EPZ 85        5  Change and early to in early 86        1  Change exclusionary to exclusion area 86        8  Change intake to intact 86      25  Change into to and to 87      14  Change verified to verify 87      24  Change NUREG-0396. Which to NUREG-0396, which 88      13  Change pathway, EPZ, to pathway EPZ 88      15  Change site. In to site, in 88    16-17  Change public. That to public, that 89        4  Change permit, applicants to permit applicants 89        5  Change planning and exemptions to planning exemptions 89        7  Delete to 89      24  Change ESP. Unless to ESP, unless 90      15  Change the request exemptions to the requested exemptions 90      22  Change protection that to protection, that 91      18  Change protection that is dose savings to protection, that is dose savings, 91      25  Change present in all to present and all
)        
 
  )  TENNESSEE VALLEY AUTHORITY
6 Page(s) Line(s) Change 92      13  Change Staffs to Staffs 92      16  Change 52.18. And to 52.18, and 93      2    Change major features of emergency to major features emergency 93      7    Change approached to approach 93      14  Change plan to plans 93      20  Change plans. Including to plans, including 94      13  Change 28th to 2018 98      7    Change EPS to ESP 98      13  Change encourage to encouraged 98      15  Change a conference to the conference 98      25  Change EPS to ESP 99      2    Change pathway for EPZ to pathway EPZ 99      3    Change request to requested 99      6    Change license of to license or 99      8    Change the implementation to that implementation and change pathway for to pathway 99      10  Change technology supports to technology, supports 99      11  Change EPZ. And to EPZ and 99      15  Change combined license of to combined license or 99      19  Change combined license of to combined license or 99      24  Change path for to pathway 100      2    Change pathway for to pathway 100      10  Change request to requests 104      14  Change from based to is based 108      13  Change about 80 feet about to about 80 feet above
) Docket No. 52
 
-047-ESP                    
7 Page(s) Line(s) Change 109      20  Change SEC to SE 109      23  Change permanent to permit 110      22  Change management and management to managementand management" 110      23  Change conditions and permit conditions to conditionspermit conditions 110      24  Change Some of the management to Some of them, management 111      13  Change de novo to the novel 111      22  Change meet their to meet the 114      9    Change past precedence to past precedents 115      17  Change There is to There are 117      13  Change ask you a to answer your 119      25  Change EPS to ESP 120      1    Change Not two-miles from outside boundary, nothing to Not two-miles or site boundary, nothing 120    15-16  Change dose distance to dose at distance 123      25  Change then to than 128      21  Change EPA to EPZ 128      22  Change Staff sees a little difference to Staff sees little difference 130    23-34  Change boundary EPZ. The situation to boundary EPZ, in that situation 131      10  Change context to contexts 132      21  Change MR. SCOTT: to COMMISSIONER BARAN:
  ) (Clinch River Nuclear Site Early  
133    17-18  Change here. They to here, they and change uniqueness to uniqueness in 133      23  Change to NUREG-0396 to in NUREG-0396 135      2    Change MS. HART: to MS. MILLIGAN:
) Site Permit Application)
 
CERTIFICATE OF SERVICE I hereby certify that the "Joint Transcript Corrections
8 Page(s) Line(s) Change 139      1  Change an RAI to in an RAI 141      20  Change use to used 141      21  Change a parameters to parameters 146    9-10  Change Today Ruth Horton and I, TVA Program Manager for Environmental Support and I to Today Ruth Horton, TVA Program Manager for Environmental Support, and I 146      23  Change Tennessee River Water Shed to Tennessee River Watershed 147      2  Change construction and operation of an SMR. And is based on to construction and operation of an SMR, and is based on 147      11  Change NRCs final environment impact statement to NRCs Final Environmental Impact Statement 147    15-16  Change we have performed to we would perform 150    14-15  Change with state -- with the state" to with the state 152      3-5  Change ...which included site visits, public meetings, a readiness review, an environmental audit, were critical to the to ...which included site visits, public meetings, a readiness review, and an environmental audit, were critical to the 155      8  Change staff and their to staff in their 156      13  Change acres. And to acres and 156    20-21  Change redressed. And to redressed and 158      5  Change analysis to analyses 158      12  Change sites. And to sites and 161      4  Change which as to such as 161      13  Change sites. And to sites and 162      5  Change SRP to E-SRP 163      15  Change postulated acts and impacts to postulated accident impacts 164      7  Change including to including:
" have been filed through the E
 
-Filing system this 23rd day of August 201 9. /Signed (electronically) by/
9 Page(s) Line(s) Change 166      14  Change wouldn't be subject to to would be subject to 168      7-8  Change comparable. And to comparable and 169      10  Change areas. And to areas and 170    16-17  Change and this programmatic agreement arrangement to and with this programmatic agreement 171      20  Change PD. to PPE.
Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
174      10  Change Phillip to Philip 176    24-25  Change and g-water, and the excavation to and dewatering the excavation 177      11  Change: they can do monitoring to they committed to do monitoring 178      25  Change addressed properly to addressed promptly 183      16  Change talk about to talked about 186      13  Change framework to frameworks 186      19  Change framework to frameworks
-14 A44 Washington, DC 20555
 
-0001 (301) 287-9115 Michael.Spencer@nrc.gov}}
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                   )
                                                  )
TENNESSEE VALLEY AUTHORITY                         )         Docket No. 52-047-ESP
                                                  )
(Clinch River Nuclear Site Early                   )
Site Permit Application)                          )
CERTIFICATE OF SERVICE I hereby certify that the Joint Transcript Corrections have been filed through the E-Filing system this 23rd day of August 2019.
                                              /Signed (electronically) by/
Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-14 A44 Washington, DC 20555-0001 (301) 287-9115 Michael.Spencer@nrc.gov}}

Revision as of 23:00, 7 October 2019

TVA and Staff Joint Transcript Corrections
ML19235A269
Person / Time
Site: Clinch River
Issue date: 08/23/2019
From: Dreke R, Mary Spencer
NRC/OGC, Tennessee Valley Authority
To:
NRC/OCM
SECY RAS
References
52-047-ESP, ASLBP 17-954-01-ESP-BD02, RAS 55196
Download: ML19235A269 (11)


Text

August 23, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 52-047-ESP

)

(Clinch River Nuclear Site Early )

Site Permit Application) )

JOINT TRANSCRIPT CORRECTIONS Pursuant to the Commissions Order (Setting Deadline for Proposed Transcript Corrections) of August 19, 2019, the Tennessee Valley Authority and the staff of the U.S.

Nuclear Regulatory Commission hereby provide joint transcript corrections for the August 14, 2019, hearing on the early site permit application for the Clinch River Nuclear Site.

Respectfully submitted,

/Signed (electronically) by/

Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-14 A44 Washington, DC 20555-0001 Telephone: (301) 287-9115 Michael.Spencer@nrc.gov

/Executed in accord with 10 CFR 2.304(d)/

Ryan C. Dreke, Esq.

Counsel for Tennessee Valley Authority Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902 Telephone: (865) 632-8960 Fax: 865-632-6147 rcdreke@tva.gov Dated at Rockville, Maryland, this 23rd day of August 2019

ATTACHMENT Joint Transcript Corrections for the Clinch River ESP Mandatory Hearing Page(s) Line(s) Change 3 9 Insert WALTER LEE, Director, Nuclear Emergency Preparedness, TVA under ALSO PRESENT.

5 4 Delete line (Tamsen Dozier is not TVA staff) 5 5 Delete line (Kenneth Erwin is not TVA staff) 5 7 Change 168 to 153 5 new After line 7, add a new line stating Kenneth Erwin 159 13 8 Change Phillip to Philip 14 19 Change Mr. Spencer to Mr. Dreke 19 12 Change 293 acres to 293,000 acres 19 15 Change maintains to maintain 21 14 Change and analyzing to and analysis of 23 16-17 Change site mandatory requirementsto site boundary requirements 26 2 Change regulator to regulatory 26 10-11 Change The application was originally submitted - was originally submitted had to The application as originally submitted had 27 5-6 Change application supplements issues had been resolved. to application supplements, issues had been resolved.

33 3 Change environmental aspects. Was effective to environmental aspects, and was effective 40 19 Change efforts or to efforts of 42 15 Change ESP and to ESP, and 43 12 Change before to be for 44 24 Change perimeter to parameter 45 4 Change designed to design 45 11 Change perimeter to parameter

2 Page(s) Line(s) Change 48 13 Change locality to inimicality 48 19 Change test to tests, 49 16 Change construction operation to construction and operation 50 16 Change federal to federally 51 25 Change as to was 53 12 Change 1022A to 102(2)(A) 53 13 Change uses systematic to uses a systematic 53 17 Change 1022C to 102(2)(C) 53 20 Change affects to effects 54 4 Change 1022C to 102(2)(C) 54 7 Change 1022E to 102(2)(E) 57 20 Change COL states to the COL stage 59 16 Change chief level and to chief level in 61 12 Change prospectus to perspective 62 9 Change CPL applicant to CP applicant 64 4 Delete Im that precedes the word TVA.

64 7 Change ESP to ESPA 64 12 Change in to and 64 22 Change only major features emergency plan, with to only a major features emergency plan with 64 23 Change the ESP development have to ESPA development has 66 16 Change dose base to dose-based 68 2 Change planned to land 68 3 Change It to If

3 Page(s) Line(s) Change 68 12 Change recognize a formal offsite plants to recognize that a formal offsite plan 69 17-18 Change have several magnitudes reduced, likelihood of to have several magnitudes reduced likelihood of accidents 70 15-16 Change The first refer to as Criteria Alpha. Is that the EPZ to The first, referred to as Criteria Alpha, is that the EPZ 70 19 Add the acronym (PAG) in parentheses after the word guide Change referred to as Criteria B, to referred to as Criteria 70 20-21 Bravo,

70 25 Change main to mean 71 10 Change main to mean 71 13 Change insurance to assurance 72 12-13 Change in the Chapter 2 of the site safety analysis report. In that, in a future application to in Chapter 2 of the Site Safety Analysis Report in that, in a future application 75 2 Remove comma before and after plume exposure pathway 75 3 Change exemption request to exemption requests 75 11 Change site. Where to site, where 75 13 Change core. And to core, and 76 2 Change information. The four SMR designs are indicated to information from the four SMR designs indicated 77 8 Change combined license construction permit to combined license or construction permit 77 9 Change EPS to ESP 77 13 Change excavation and safety to excavation of safety 77 22 Change content to context 78 4 Change security to to security or to 78 6 Change cited to sited

4 Page(s) Line(s) Change 78 8 Change following to falling and change site. to site, 78 9 Change following to falling 78 10 Change site. And to site, and 78 14 Change planning, the plume exposure path rate, EPZ size and to planning plume exposure pathway EPZ sizing 78 15 Change associate to associated 78 21 Change planning. In to planning in 78 22 Change explosion path for to exposure pathway 78 24 Change TVA is to TVAs 79 5 Change were used in to will use the 79 6 Change explosion to exposure 79 10 Change explosion to exposure 80 9 Delete and 80 10 Change plans. Both of which consists of limit aspects to plans, both of which consist of limited aspects 80 19 Change or ETE. to or ETE, 80 20 Change Which to which 80 24 Change plans. The to plans, the 81 1 Change applicants to applicants 81 7 Change features and emergency to features emergency 81 16 Change EPA to EP 81 18 Change major feature to major features 81 21 Change EPA to EP 83 13 Change methodologies to methodologys 84 3 Change SECY 110152 to SECY-11-0152

5 Page(s) Line(s) Change 84 4-5 Change SECY 150077 to SECY-15-0077 84 8 Change to the adapt of an approach to to adapt an approach 84 12 Change use to used 84 16 Change pathway, EPZ, to pathway EPZ 84 18 Change environment to environmental 84 24 Change pathway, EPZ, to pathway EPZ 85 3 Change pathway, EPZ, to pathway EPZ 85 5 Change and early to in early 86 1 Change exclusionary to exclusion area 86 8 Change intake to intact 86 25 Change into to and to 87 14 Change verified to verify 87 24 Change NUREG-0396. Which to NUREG-0396, which 88 13 Change pathway, EPZ, to pathway EPZ 88 15 Change site. In to site, in 88 16-17 Change public. That to public, that 89 4 Change permit, applicants to permit applicants 89 5 Change planning and exemptions to planning exemptions 89 7 Delete to 89 24 Change ESP. Unless to ESP, unless 90 15 Change the request exemptions to the requested exemptions 90 22 Change protection that to protection, that 91 18 Change protection that is dose savings to protection, that is dose savings, 91 25 Change present in all to present and all

6 Page(s) Line(s) Change 92 13 Change Staffs to Staffs 92 16 Change 52.18. And to 52.18, and 93 2 Change major features of emergency to major features emergency 93 7 Change approached to approach 93 14 Change plan to plans 93 20 Change plans. Including to plans, including 94 13 Change 28th to 2018 98 7 Change EPS to ESP 98 13 Change encourage to encouraged 98 15 Change a conference to the conference 98 25 Change EPS to ESP 99 2 Change pathway for EPZ to pathway EPZ 99 3 Change request to requested 99 6 Change license of to license or 99 8 Change the implementation to that implementation and change pathway for to pathway 99 10 Change technology supports to technology, supports 99 11 Change EPZ. And to EPZ and 99 15 Change combined license of to combined license or 99 19 Change combined license of to combined license or 99 24 Change path for to pathway 100 2 Change pathway for to pathway 100 10 Change request to requests 104 14 Change from based to is based 108 13 Change about 80 feet about to about 80 feet above

7 Page(s) Line(s) Change 109 20 Change SEC to SE 109 23 Change permanent to permit 110 22 Change management and management to managementand management" 110 23 Change conditions and permit conditions to conditionspermit conditions 110 24 Change Some of the management to Some of them, management 111 13 Change de novo to the novel 111 22 Change meet their to meet the 114 9 Change past precedence to past precedents 115 17 Change There is to There are 117 13 Change ask you a to answer your 119 25 Change EPS to ESP 120 1 Change Not two-miles from outside boundary, nothing to Not two-miles or site boundary, nothing 120 15-16 Change dose distance to dose at distance 123 25 Change then to than 128 21 Change EPA to EPZ 128 22 Change Staff sees a little difference to Staff sees little difference 130 23-34 Change boundary EPZ. The situation to boundary EPZ, in that situation 131 10 Change context to contexts 132 21 Change MR. SCOTT: to COMMISSIONER BARAN:

133 17-18 Change here. They to here, they and change uniqueness to uniqueness in 133 23 Change to NUREG-0396 to in NUREG-0396 135 2 Change MS. HART: to MS. MILLIGAN:

8 Page(s) Line(s) Change 139 1 Change an RAI to in an RAI 141 20 Change use to used 141 21 Change a parameters to parameters 146 9-10 Change Today Ruth Horton and I, TVA Program Manager for Environmental Support and I to Today Ruth Horton, TVA Program Manager for Environmental Support, and I 146 23 Change Tennessee River Water Shed to Tennessee River Watershed 147 2 Change construction and operation of an SMR. And is based on to construction and operation of an SMR, and is based on 147 11 Change NRCs final environment impact statement to NRCs Final Environmental Impact Statement 147 15-16 Change we have performed to we would perform 150 14-15 Change with state -- with the state" to with the state 152 3-5 Change ...which included site visits, public meetings, a readiness review, an environmental audit, were critical to the to ...which included site visits, public meetings, a readiness review, and an environmental audit, were critical to the 155 8 Change staff and their to staff in their 156 13 Change acres. And to acres and 156 20-21 Change redressed. And to redressed and 158 5 Change analysis to analyses 158 12 Change sites. And to sites and 161 4 Change which as to such as 161 13 Change sites. And to sites and 162 5 Change SRP to E-SRP 163 15 Change postulated acts and impacts to postulated accident impacts 164 7 Change including to including:

9 Page(s) Line(s) Change 166 14 Change wouldn't be subject to to would be subject to 168 7-8 Change comparable. And to comparable and 169 10 Change areas. And to areas and 170 16-17 Change and this programmatic agreement arrangement to and with this programmatic agreement 171 20 Change PD. to PPE.

174 10 Change Phillip to Philip 176 24-25 Change and g-water, and the excavation to and dewatering the excavation 177 11 Change: they can do monitoring to they committed to do monitoring 178 25 Change addressed properly to addressed promptly 183 16 Change talk about to talked about 186 13 Change framework to frameworks 186 19 Change framework to frameworks

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 52-047-ESP

)

(Clinch River Nuclear Site Early )

Site Permit Application) )

CERTIFICATE OF SERVICE I hereby certify that the Joint Transcript Corrections have been filed through the E-Filing system this 23rd day of August 2019.

/Signed (electronically) by/

Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-14 A44 Washington, DC 20555-0001 (301) 287-9115 Michael.Spencer@nrc.gov