ML17331B048: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 07/31/1993 | | issue date = 07/31/1993 | ||
| title = Rev 1 to Monthly Operating Rept for Jul 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date | | title = Rev 1 to Monthly Operating Rept for Jul 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date | ||
| author name = | | author name = Janisse J, Turner D | ||
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG | | author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG | ||
| addressee name = | | addressee name = | ||
Revision as of 14:13, 18 June 2019
| ML17331B048 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/31/1993 |
| From: | Janisse J, Doreen Turner INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17331B046 | List: |
| References | |
| NUDOCS 9311160039 | |
| Download: ML17331B048 (2) | |
Text
N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 1 2.Reporting Period July 93 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 notes Rev.1 Corrected the Gross Generation YTD 22/Oct/93 DG Turner 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.
If Any (Net MWe)10.Reasons For Restrictions.
If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None This Mo.Yr.to Date 744.0 5087.0 744.0 5087.0 0'0.0 744.0 5087.0 0.0 0.0 2408039 16317784 774020 5295110 746796 5109331 100.0 100.0 100.0 100.0 100.4 100.4 98.4 98.5 0.0 0.0 Months (Type, Date,and Cumm.162887.0 121981.4 463.0 119935.6 321'351760107 114238470 109871696 74.6 74 6 67~1 65.4 6.2 Duration):
25.If Shut Down At End of Report: Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):
Forcast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved (9311160039 931105 PDR ADOCK 05000315.R P,DR P~I t L U vf V