Line 9: Line 9:
| docket = PROJ0753
| docket = PROJ0753
| license number =  
| license number =  
| contact person = Honcharik M C, NRR/DSS, 301-415-1774
| contact person = Honcharik M, NRR/DSS, 301-415-1774
| package number = ML19028A288
| package number = ML19028A288
| document type = Safety Evaluation
| document type = Safety Evaluation

Revision as of 16:48, 14 June 2019

Final Model SE of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Enclosure 2)
ML19028A286
Person / Time
Site: Technical Specifications Task Force
Issue date: 02/21/2019
From: Victor Cusumano
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik M, NRR/DSS, 301-415-1774
Shared Package
ML19028A288 List:
References
Download: ML19028A286 (8)


Text

General Directions: This Model safety evaluation (SE) provides the format and content to be used when preparing the plant-specific SE of a license amendment request to adopt TSTF-566, Revision 0. The bolded bracketed information shows text that should be filled in for the specific amendment; individual licensees would furnish site-specific nomenclature or values for these bracketed items. The italicized wording provides guidance on what should be included in each section and should not be included in the SE.

Federal Register

{NOTE: Technical reviewers and/or the project manager should verify that the RHR shutdown cooling system description is applicable to this plant and revise this section if necessary.}

{NOTE: Technical reviewers and/or the project manager are to assess the adequacy of any variations from the approved traveler and document their acceptability. Choose the applicable paragraphs based on information provided in the LAR.}

Code of Federal Regulations

{NOTE: Choose applicable STS}

{This section is to be prepared by the plant project manager.}

{This section is to be prepared by the plant project manager in accordance with current procedures.}

{This section is to be prepared by the plant project manager.}

{Optional section to be prepared by the PM and primary reviewers. If document is publicly available, the ADAMS Accession No. should be listed.}

{NOTE: These are the principal contributors for the model SE of the traveler. Replace these names with those who prepared the plant-specific SE.}