After Action Report AFTER ACTION REPORT Harris Nuclear Plant (HNP) Exercise REP Program Exercise  
After Action Report AFTER ACTION REPORT Harris Nuclear Plant (HNP) Exercise REP Program Exercise  


[FINAL]  November 29, 2011 Radiological Emergency Prep aredness (REP) Program Published March 1, 2012
[FINAL]  November 29, 2011 Radiological Emergency Prep aredness (REP) Program Published March 1, 2012


Homeland Security Exercise and Evaluation Program (HSEEP) After Action Report (AAR) 2011 HNP REP Exercise 2011 HNP REP Exercise
Homeland Security Exercise and Evaluation Program (HSEEP) After Action Report (AAR) 2011 HNP REP Exercise 2011 HNP REP Exercise
Line 27: Line 27:
Homeland Security Exercise and Evaluation Program (HSEEP)
Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Table of Contents 2011 HNP REP Exercise 1 Table of Contents Page  Table of Contents .............................................................................................................................1 Administrative Handling Instructions ..............................................................................................3 Executive Summary .........................................................................................................................5 Section 1:  Exercise Overview .................................................................................................
AAR 2011 Harris Nuclear Plant REP Exercise Table of Contents 2011 HNP REP Exercise 1 Table of Contents Page  Table of Contents .............................................................................................................................1 Administrative Handling Instructions ..............................................................................................3 Executive Summary .........................................................................................................................5 Section 1:  Exercise Overview .................................................................................................
........7  1.1 Exercise Details .............................................................................................................7
........7  1.1 Exercise Details .............................................................................................................7 1.2 Exercise Planning Team Leadership ..............................................................................8 1.3 Participating Organizations ............................................................................................8 Section 2:  Exercise Design Summary ...........................................................................................
11 2.1 Exercise Purpose and Design .......................................................................................11 2.2 FEMA Exercise Objectives and Capabilities ...............................................................12 2.3 Scenario Summary .......................................................................................................15 Section 3:  Analysis of Capabilities ..........................................................................................
.....17 3.1 Exercise Evaluation and Results ..................................................................................17 3.2 Evaluation Summaries .................................................................................................17


===1.2 Exercise===
3.2.1 State Of North Carolina ...................................................................................17
Planning Team Leadership ..............................................................................8
 
===1.3 Participating===
Organizations ............................................................................................8 Section 2:  Exercise Design Summary ...........................................................................................
11 
 
===2.1 Exercise===
Purpose and Design .......................................................................................11 2.2 FEMA Exercise Objectives and Capabilities ...............................................................12
 
===2.3 Scenario===
Summary .......................................................................................................15 Section 3:  Analysis of Capabilities ..........................................................................................
.....17 
 
===3.1 Exercise===
Evaluation and Results ..................................................................................17
 
===3.2 Evaluation===
Summaries .................................................................................................17
 
====3.2.1 State====
Of North Carolina ...................................................................................17


3.2.1.1 State Emergency Operations Center ..............................................17 3.2.1.2 Central Branch Office ....................................................................18 3.2.1.3 Dose Assessment ...........................................................................18 3.2.1.4 Fixed Laboratory ............................................................................19
3.2.1.1 State Emergency Operations Center ..............................................17 3.2.1.2 Central Branch Office ....................................................................18 3.2.1.3 Dose Assessment ...........................................................................18 3.2.1.4 Fixed Laboratory ............................................................................19


====3.2.2 Joint====
3.2.2 Joint Operations ...............................................................................................21
Operations ...............................................................................................21


3.2.2.1 Emergency Operations Facility......................................................21 3.2.2.2 Joint Information Center ................................................................21
3.2.2.1 Emergency Operations Facility......................................................21 3.2.2.2 Joint Information Center ................................................................21
Line 80: Line 60:


Homeland Security Exercise and Evaluation Program (HSEEP)
Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Handling Instructions 2011 HNP REP Exercise 3 Administrative Handling Instructions  
AAR 2011 Harris Nuclear Plant REP Exercise Handling Instructions 2011 HNP REP Exercise 3 Administrative Handling Instructions
: 1. This After Action Report (AAR) for the 2011 Harris Nuclear Plant (HNP) Radiological Emergency Preparedness, Full Plume Phase Emergency Planning Zone (EPZ) Exercise is considered a public document.  
: 1. This After Action Report (AAR) for the 2011 Harris Nuclear Plant (HNP) Radiological Emergency Preparedness, Full Plume Phase Emergency Planning Zone (EPZ) Exercise is considered a public document.
: 2. Points of Contact:
: 2. Points of Contact:
Federal:  State of North Carolina:
Federal:  State of North Carolina:
Line 115: Line 95:


Homeland Security Exercise and Evaluation Program (HSEEP)
Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Section 1:  Exercise Overview 2011 HNP REP Exercise 7 Section 1:  Exercise Overview  
AAR 2011 Harris Nuclear Plant REP Exercise Section 1:  Exercise Overview 2011 HNP REP Exercise 7 Section 1:  Exercise Overview 1.1 Exercise Details Exercise Name 2011 Harris Nuclear Power Plant REP Evaluated Exercise Type of Exercise Full-Scale Exercise Exercise Out of Sequence/Off Scenario Dates October 11-13, 2011 and October 26, 2011 Exercise Date November 29, 2011 Locations See Appendix F for a complete listing of lo cations of supported exercise activities.
 
===1.1 Exercise===
Details Exercise Name 2011 Harris Nuclear Power Plant REP Evaluated Exercise Type of Exercise Full-Scale Exercise Exercise Out of Sequence/Off Scenario Dates October 11-13, 2011 and October 26, 2011 Exercise Date November 29, 2011 Locations See Appendix F for a complete listing of lo cations of supported exercise activities.
Sponsors North Carolina Emergency Management Progress Energy 116 West Jones Street Harris Nuclear Plant 4713 Mail Service Center 3932 New Hill-Holleman Road Raleigh, North Carolina 27699  New Hill, North Carolina 28217  
Sponsors North Carolina Emergency Management Progress Energy 116 West Jones Street Harris Nuclear Plant 4713 Mail Service Center 3932 New Hill-Holleman Road Raleigh, North Carolina 27699  New Hill, North Carolina 28217  


Line 126: Line 103:
AAR 2011 Harris Nuclear Plant REP Exercise Section 1:  Exercise Overview 2011 HNP REP Exercise 8 1.2 Exercise Planning Team Leadership See App. G for a listing of the members of the exercise planning team leadership.  
AAR 2011 Harris Nuclear Plant REP Exercise Section 1:  Exercise Overview 2011 HNP REP Exercise 8 1.2 Exercise Planning Team Leadership See App. G for a listing of the members of the exercise planning team leadership.  


===1.3 Participating===
1.3 Participating Organizations  
Organizations  


The following agencies, organizations and units of government partic ipated in the 2011 HNP REP Exercise.   
The following agencies, organizations and units of government partic ipated in the 2011 HNP REP Exercise.   
Line 180: Line 156:


This Page Is Intentionally Blank Homeland Security Exercise and Evaluation Program (HSEEP)
This Page Is Intentionally Blank Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Section 2:  Exercise Design Summary 2011 HNP REP Exercise 11 Section 2:  Exercise Design Summary  
AAR 2011 Harris Nuclear Plant REP Exercise Section 2:  Exercise Design Summary 2011 HNP REP Exercise 11 Section 2:  Exercise Design Summary 2.1 Exercise Purpose and Design DHS/FEMA administers the REP Program pursuan t to the regulations found in Title 44 Code of Federal Regulation (CFR) part s 350, 351 and 352. 44 CFR 350 codifies 16 planning standards that form the basis for radiological emergency response planning for licensee, State, tribal and local governments impacted by the EPZs established for each nuclear power plant site in the United States. 44 CFR 350 sets forth the mechanisms for the formal review and approval of State, Tribal and local government RERPs and procedures by DHS/FEMA. One of the REP program cornerstones established by these regulations is the biennial exercise of offsite response capabilities. During these exercises State, Tribal and local governments demonstrate their abilities to implement their plans and procedures to pr otect the health and safety of the public in the event of a radiological emergency at the nuclear plant.   
 
===2.1 Exercise===
Purpose and Design DHS/FEMA administers the REP Program pursuan t to the regulations found in Title 44 Code of Federal Regulation (CFR) part s 350, 351 and 352. 44 CFR 350 codifies 16 planning standards that form the basis for radiological emergency response planning for licensee, State, tribal and local governments impacted by the EPZs established for each nuclear power plant site in the United States. 44 CFR 350 sets forth the mechanisms for the formal review and approval of State, Tribal and local government RERPs and procedures by DHS/FEMA. One of the REP program cornerstones established by these regulations is the biennial exercise of offsite response capabilities. During these exercises State, Tribal and local governments demonstrate their abilities to implement their plans and procedures to pr otect the health and safety of the public in the event of a radiological emergency at the nuclear plant.   


The results of this exercise together with review of the RERPs and procedures and verification of the periodic requirements set forth in NUREG-0654/FEMA-REP-1 through the Annual Letter of Ce rtification and staff assistan ce visit enables FEMA to provide a statement with the transmission of this final AAR to the NRC that State, Tribal and local plans and preparedness are (1) adequate to protect the health and safety of the public living in the vicinity of the nucl ear power facility by providing reasonable assurance that appropriate protective measures can be taken offsite in the event of a radiological emergency; and (2) capable of being implemented.
The results of this exercise together with review of the RERPs and procedures and verification of the periodic requirements set forth in NUREG-0654/FEMA-REP-1 through the Annual Letter of Ce rtification and staff assistan ce visit enables FEMA to provide a statement with the transmission of this final AAR to the NRC that State, Tribal and local plans and preparedness are (1) adequate to protect the health and safety of the public living in the vicinity of the nucl ear power facility by providing reasonable assurance that appropriate protective measures can be taken offsite in the event of a radiological emergency; and (2) capable of being implemented.
Line 233: Line 206:
AAR 2011 Harris Nuclear Plant REP Exercise Section 2:  Exercise Design Summary 2011 HNP REP Exercise 15 Conduct JIC Operations; Issue Public Information, Alerts/Warnings, and Notifications; Conduct Media Relations; and Provide Public Rumor Control.
AAR 2011 Harris Nuclear Plant REP Exercise Section 2:  Exercise Design Summary 2011 HNP REP Exercise 15 Conduct JIC Operations; Issue Public Information, Alerts/Warnings, and Notifications; Conduct Media Relations; and Provide Public Rumor Control.
* Objective 6:  Demonstrate the ability to conduct independent dose assessment, management of field teams, and mobile or fixed laboratory analys is in response to a radiological release. Capability:  Hazardous Materials Response and Decontamination -
* Objective 6:  Demonstrate the ability to conduct independent dose assessment, management of field teams, and mobile or fixed laboratory analys is in response to a radiological release. Capability:  Hazardous Materials Response and Decontamination -
Direct Hazardous Material Response and Decontamination Tactical Operations; Activate Hazardous Material Response and Decontamination; Assess Hazard and Evaluate Risk; and Conduct Decontamination a nd Clean-up /Recovery Operations  Capability:  Public Health Laboratory Testing - Obtain and Direct Laboratory Testing, Surveillance, rapid detection, confirmatory testing, data reporting, investigative support, and laboratory networ king to address potential exposure, or known exposure to in all matrices including clinical specimens, food and environmental samples, (e.g., water, air, soil).  
Direct Hazardous Material Response and Decontamination Tactical Operations; Activate Hazardous Material Response and Decontamination; Assess Hazard and Evaluate Risk; and Conduct Decontamination a nd Clean-up /Recovery Operations  Capability:  Public Health Laboratory Testing - Obtain and Direct Laboratory Testing, Surveillance, rapid detection, confirmatory testing, data reporting, investigative support, and laboratory networ king to address potential exposure, or known exposure to in all matrices including clinical specimens, food and environmental samples, (e.g., water, air, soil).
 
2.3 Scenario Summary  
===2.3 Scenario===
Summary  


0740 All four Turbine Governor Valves go shut. Reactor trip signal on 2/3  coincidence. Reactor Trip Breakers DO NOT open; Reactor IS able to be tripped from SECOND control switch.   
0740 All four Turbine Governor Valves go shut. Reactor trip signal on 2/3  coincidence. Reactor Trip Breakers DO NOT open; Reactor IS able to be tripped from SECOND control switch.   
Line 267: Line 238:
1600 Drill termination.
1600 Drill termination.
Homeland Security Exercise and Evaluation Program (HSEEP)
Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Section 3:  Analysis of Capabilities 2011 HNP REP Exercise17 Section 3:  Analysis of Capabilities  
AAR 2011 Harris Nuclear Plant REP Exercise Section 3:  Analysis of Capabilities 2011 HNP REP Exercise17 Section 3:  Analysis of Capabilities 3.1 Exercise Evaluation and Results  
 
===3.1 Exercise===
Evaluation and Results  


This section contains the resu lts and findings of the evalua tion of all jurisdictions and functional entities that participated in the November 29, 2011 plume exercise and OOS interviews and demonstrations of Octobe r 11-13, and 26, 2011. Exercise criteria are listed by number and the demonstration status of those criteria are indicated by the use of the following terms:
This section contains the resu lts and findings of the evalua tion of all jurisdictions and functional entities that participated in the November 29, 2011 plume exercise and OOS interviews and demonstrations of Octobe r 11-13, and 26, 2011. Exercise criteria are listed by number and the demonstration status of those criteria are indicated by the use of the following terms:
Line 277: Line 245:
* Deficiency assessed
* Deficiency assessed
* Plan Issues
* Plan Issues
* Not Demonstrated  
* Not Demonstrated 3.2 Evaluation Summaries 


===3.2 Evaluation===
3.2.1 State of North Carolina 3.2.1.1 State Emergency Operations Center Emergency Operations Center Man agement Capability Summary:
Summaries 
 
====3.2.1 State====
of North Carolina 3.2.1.1 State Emergency Operations Center Emergency Operations Center Man agement Capability Summary:
This capability was successfully demonstrated by the State Emergency Response Team (SERT) at the State Emergency Operations Ce nter (SEOC) and the Central Branch Office (CBO) Regional Coordination Center (RCC).  
This capability was successfully demonstrated by the State Emergency Response Team (SERT) at the State Emergency Operations Ce nter (SEOC) and the Central Branch Office (CBO) Regional Coordination Center (RCC).  


Line 542: Line 506:
The Fuquay- Varina Police Officer representative stated that they and Wake County have adequate personnel and vehicles to man identified TCPs. If additional personnel were needed, he would request mutual aid from surrounding areas. Necessary equipment including trucks, barricades, etc from Public Works who would also transport barricades to TCP locations. Unmet needs would be requested from the Area Command Post.  
The Fuquay- Varina Police Officer representative stated that they and Wake County have adequate personnel and vehicles to man identified TCPs. If additional personnel were needed, he would request mutual aid from surrounding areas. Necessary equipment including trucks, barricades, etc from Public Works who would also transport barricades to TCP locations. Unmet needs would be requested from the Area Command Post.  


For this capability the following REP criteria were met:  1.d.1, 1.e.1, 3.a.1, 3.b.1,  
For this capability the following REP criteria were met:  1.d.1, 1.e.1, 3.a.1, 3.b.1,
: 3. d.1 and 3.d.2   
: 3. d.1 and 3.d.2   


Line 617: Line 581:
AAR 2011 Harris Nuclear Plant REP Exercise Appendix C:  Exercise Evaluators and Assignments 2011 HNP REP Exercise 43 Appendix C:  Exercise E valuators and Assignments Location Evaluation Team Capability and  Activity North Carolina Joint Operations Emergency Operations Facility (EOF)  Bob Trojanowski (NRC) Capability:  EOC Management Activity 1:  Support and Coordinate Response Joint Information Center (JIC)
AAR 2011 Harris Nuclear Plant REP Exercise Appendix C:  Exercise Evaluators and Assignments 2011 HNP REP Exercise 43 Appendix C:  Exercise E valuators and Assignments Location Evaluation Team Capability and  Activity North Carolina Joint Operations Emergency Operations Facility (EOF)  Bob Trojanowski (NRC) Capability:  EOC Management Activity 1:  Support and Coordinate Response Joint Information Center (JIC)
Robert Spencer (FEMA)
Robert Spencer (FEMA)
JT Ackerman (FEMA) Capability:  Emergency Public Information and Warning Activity 1:  Activate Emergency Public Information, Alert/Warning, and Notification Plans  
JT Ackerman (FEMA) Capability:  Emergency Public Information and Warning Activity 1:  Activate Emergency Public Information, Alert/Warning, and Notification Plans
: 2. Capability:  Emergency Public Information and Warning Activity 2:  Manage Emergency Public Information and Warnings Observer Kevin Keyes (FEMA) None State Emergency Operations Center (SEOC)
: 2. Capability:  Emergency Public Information and Warning Activity 2:  Manage Emergency Public Information and Warnings Observer Kevin Keyes (FEMA) None State Emergency Operations Center (SEOC)
John Fill (FEMA)
John Fill (FEMA)
Line 627: Line 591:
Robert Nash (FEMA) Gerald Mclemore (FEMA) Robert Spence (FEMA)
Robert Nash (FEMA) Gerald Mclemore (FEMA) Robert Spence (FEMA)
Odis Spencer (FEMA) 1. Capability:  Hazardous Materials Response & Decontamination Activity 1:  Site Management and Control Activity 2:  Decontamination and Clean-Up/Recovery Operations Homeland Security Exercise and Evaluation Program (HSEEP)
Odis Spencer (FEMA) 1. Capability:  Hazardous Materials Response & Decontamination Activity 1:  Site Management and Control Activity 2:  Decontamination and Clean-Up/Recovery Operations Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Appendix C:  Exercise Evaluators and Assignments 2011 HNP REP Exercise 45 Location Evaluation Team Capability and  Activity  
AAR 2011 Harris Nuclear Plant REP Exercise Appendix C:  Exercise Evaluators and Assignments 2011 HNP REP Exercise 45 Location Evaluation Team Capability and  Activity
: 2. Capability:  Mass Care (Sheltering, Feeding, and Related Services) Activity 1:  Establish Shelter Operations Harnett County/Director:  Mr. Gary Pope Emergency Operations Center (EOC) Gerald Mclemore (FEMA) Lisa Rink(FEMA) Quintin Ivy (FEMA) 1. Capability:  EOC Management Activity 1:  Activate EOC Activity 2:  Provide EOC Connectivity Activity 3:  Direct EOC Operations Activity 4:  Support and Coordinate Response  2. Capability:  Emergency Public Information and Warning Activity 1:  Issue Emergency Warnings Activity 2:  Provide Public Inquiry Control Traffic Control Points Quintin Ivy (FEMA) Capability:  Public Safety and Security Response Activity 1:  Activate Public Safety and Security Response Activity 2:  Command and Control Public Safety and Security Response Operations Activity 3:  Control Traffic, Crowd, and Scene Backup Route Alerting  
: 2. Capability:  Mass Care (Sheltering, Feeding, and Related Services) Activity 1:  Establish Shelter Operations Harnett County/Director:  Mr. Gary Pope Emergency Operations Center (EOC) Gerald Mclemore (FEMA) Lisa Rink(FEMA) Quintin Ivy (FEMA) 1. Capability:  EOC Management Activity 1:  Activate EOC Activity 2:  Provide EOC Connectivity Activity 3:  Direct EOC Operations Activity 4:  Support and Coordinate Response  2. Capability:  Emergency Public Information and Warning Activity 1:  Issue Emergency Warnings Activity 2:  Provide Public Inquiry Control Traffic Control Points Quintin Ivy (FEMA) Capability:  Public Safety and Security Response Activity 1:  Activate Public Safety and Security Response Activity 2:  Command and Control Public Safety and Security Response Operations Activity 3:  Control Traffic, Crowd, and Scene Backup Route Alerting  


Line 691: Line 655:


Homeland Security Exercise and Evaluation Program (HSEEP)
Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Appendix D:  Extent of Play Agreement 2011 HNP REP Exercise 51 Date & Time: 11:00 a.m. Thursday, December 1, 2011  
AAR 2011 Harris Nuclear Plant REP Exercise Appendix D:  Extent of Play Agreement 2011 HNP REP Exercise 51 Date & Time: 11:00 a.m. Thursday, December 1, 2011
: 1. EMERGENCY OPERATIONS MANAGEMENT  
: 1. EMERGENCY OPERATIONS MANAGEMENT
: 1. a. - Mobilization  
: 1. a. - Mobilization  


Line 702: Line 666:
Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
* State and local response personnel may not be pre-positioned.
* State and local response personnel may not be pre-positioned.
* Notification rosters will be available to FEMA evaluators upon request. Emergency management personnel will discuss alert notification procedures with the evaluator.  
* Notification rosters will be available to FEMA evaluators upon request. Emergency management personnel will discuss alert notification procedures with the evaluator.
: 1. b. - Facilities  
: 1. b. - Facilities  


Line 715: Line 679:
* State, Chatham and Wake Counties EOC facilities baseline for this exercise evaluation criterion was established in 2002.
* State, Chatham and Wake Counties EOC facilities baseline for this exercise evaluation criterion was established in 2002.
* Lee County EOC's baseline was established in 2009.
* Lee County EOC's baseline was established in 2009.
* Harnett County EOC is a new facility and requires evaluation of facility and support system adequacy.  
* Harnett County EOC is a new facility and requires evaluation of facility and support system adequacy.
: 1. c - Direction and Control:  
: 1. c - Direction and Control:  


Line 721: Line 685:


Homeland Security Exercise and Evaluation Program (HSEEP)
Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Appendix D:  Extent of Play Agreement 2011 HNP REP Exercise 52 Key personnel with leadership roles for the ORO provide Direction and Control to that part of the overall response effort for which they are responsible.  
AAR 2011 Harris Nuclear Plant REP Exercise Appendix D:  Extent of Play Agreement 2011 HNP REP Exercise 52 Key personnel with leadership roles for the ORO provide Direction and Control to that part of the overall response effort for which they are responsible.
(NUREG-0654, A.1.d.,2.a.,b.)  
(NUREG-0654, A.1.d.,2.a.,b.)  


EXTENT OF PLAY:
EXTENT OF PLAY:
Line 740: Line 704:
Equipment, maps, displays, dosimeters, potassium iodide (KI) and other supplies  
Equipment, maps, displays, dosimeters, potassium iodide (KI) and other supplies  


are sufficient to support emergency operations.  
are sufficient to support emergency operations.
(NUREG-0654, H., J.10.a.b.e.f.j.k., 11, K.3.a.)  
(NUREG-0654, H., J.10.a.b.e.f.j.k., 11, K.3.a.)  


Participants: Chatham, Harnett, Lee & Wake Counties
Participants: Chatham, Harnett, Lee & Wake Counties
Line 752: Line 716:
* Staff Assistance Visit will take place off-scenario, on July 27, 2011 at 9:00 a.m. at the Harnett County EOC, 1005 Edwards Drive, Lillington, NC Lee County:
* Staff Assistance Visit will take place off-scenario, on July 27, 2011 at 9:00 a.m. at the Harnett County EOC, 1005 Edwards Drive, Lillington, NC Lee County:
* Staff Assistance Visit will take place off-scenario, July 28, 2011 at 1:00 p.m. at the Lee County Emergency Management Offices at, 225 Steele Street, Sanford, NC 27330  Wake County:
* Staff Assistance Visit will take place off-scenario, July 28, 2011 at 1:00 p.m. at the Lee County Emergency Management Offices at, 225 Steele Street, Sanford, NC 27330  Wake County:
* Staff Assistance Visit will take place off-scenario, July 25, 2011 at 2:00 p.m. at the Wake County Emergency Management Offices at 331 S. McDowell Street, Raleigh, NC., 27601  
* Staff Assistance Visit will take place off-scenario, July 25, 2011 at 2:00 p.m. at the Wake County Emergency Management Offices at 331 S. McDowell Street, Raleigh, NC., 27601
: 2. PROTECTIVE ACTION DECISION MAKING  
: 2. PROTECTIVE ACTION DECISION MAKING  


Line 761: Line 725:
OROs use a decision making process, considering relevant factors and appropriate  
OROs use a decision making process, considering relevant factors and appropriate  


coordination, to insure that an exposure cont rol system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.  
coordination, to insure that an exposure cont rol system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.
(NUREG-0654, K.4).  
(NUREG-0654, K.4).  


Line 774: Line 738:


Appropriate protective acti on recommendations are based on available information on plant conditions, field-monitoring dat a, and licensee and ORO dose projections, as well as knowledge of on-site and off-site environmental conditions.
Appropriate protective acti on recommendations are based on available information on plant conditions, field-monitoring dat a, and licensee and ORO dose projections, as well as knowledge of on-site and off-site environmental conditions.
    (NUREG-0654, I.8.,10.,11.  & Supplement 3.)  
(NUREG-0654, I.8.,10.,11.  & Supplement 3.)  


EXTENT OF PLAY:
EXTENT OF PLAY:
Line 783: Line 747:
Criterion 2.b.2:   
Criterion 2.b.2:   


A decision-making process involving consideration of appropriate factors and necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).  
A decision-making process involving consideration of appropriate factors and necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).
(NUREG-0654, J.9.,10.m.)
(NUREG-0654, J.9.,10.m.)
EXTENT OF PLAY:
EXTENT OF PLAY:
Line 798: Line 762:
Criterion 2.c.1:   
Criterion 2.c.1:   


Protective action decisions are made, as a ppropriate, for special population groups.  
Protective action decisions are made, as a ppropriate, for special population groups.
(NUREG-0654, J.9.,10.c.d.e.g.)
(NUREG-0654, J.9.,10.c.d.e.g.)
* Participants:  Chatham, Harnett, Lee & Wake Counties
* Participants:  Chatham, Harnett, Lee & Wake Counties
* Counties will demonstrate their procedures through discussion with the Federal Evaluator, by using a special populations list.
* Counties will demonstrate their procedures through discussion with the Federal Evaluator, by using a special populations list.
Line 822: Line 786:
Criterion 3.b.1:   
Criterion 3.b.1:   


KI and appropriate instructions are available should a decision to recommend Use of KI be made. Appropriate record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained.  
KI and appropriate instructions are available should a decision to recommend Use of KI be made. Appropriate record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained.
(NUREG-0654, E.7., J.10. e, f.)
(NUREG-0654, E.7., J.10. e, f.)
EXTENT OF PLAY:
EXTENT OF PLAY:
* Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
* Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
Line 833: Line 797:
Criterion 3.c.1:   
Criterion 3.c.1:   


Protective action decisions are implemented for special population groups within areas subject to protective actions.  
Protective action decisions are implemented for special population groups within areas subject to protective actions.
(NUREG-0654, E.7.,J.9.,10.c.d.e.g.)
(NUREG-0654, E.7.,J.9.,10.c.d.e.g.)
EXTENT OF PLAY:
EXTENT OF PLAY:
Line 901: Line 865:
EXTENT OF PLAY:
EXTENT OF PLAY:
* Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
* Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
* During the interview process, as schedul ed in 3.d.1 above, officers will identify impediments to evacuation based on a simulated set of circumstances and questions posed by the federal evaluator.  
* During the interview process, as schedul ed in 3.d.1 above, officers will identify impediments to evacuation based on a simulated set of circumstances and questions posed by the federal evaluator.
: 4. FIELD MEASUREMENT AND ANALYSIS 4.a - Plume Phase Field Measurement & Analysis Criterion 4.a.1:   
: 4. FIELD MEASUREMENT AND ANALYSIS 4.a - Plume Phase Field Measurement & Analysis Criterion 4.a.1:   


Line 913: Line 877:
Criterion 4.a.2:   
Criterion 4.a.2:   


Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure.  
Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure.
(NUREG-0654, I.8., 11., J.10.a).  
(NUREG-0654, I.8., 11., J.10.a).  


Line 926: Line 890:
Criterion 4.a.3:   
Criterion 4.a.3:   


Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples a re collected. Teams must move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivit y has been collected on the sampling media.  
Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples a re collected. Teams must move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivit y has been collected on the sampling media.
(NUREG-0654, I.8., 9., 11.)  
(NUREG-0654, I.8., 9., 11.)  


EXTENT OF PLAY:
EXTENT OF PLAY:
Line 933: Line 897:
NC SERT, Radiation Protection
NC SERT, Radiation Protection
* Radiation Protection will demonstrate this criterion using two field survey teams.
* Radiation Protection will demonstrate this criterion using two field survey teams.
* This criterion will be demonstrated for "Training Only" as part of the joint federal/state partnership agreement.  
* This criterion will be demonstrated for "Training Only" as part of the joint federal/state partnership agreement.
: 4. c - Laboratory Operations  
: 4. c - Laboratory Operations  


Line 940: Line 904:
The laboratory is capable of performing required radiological analyses to support protective action decisions.  
The laboratory is capable of performing required radiological analyses to support protective action decisions.  


(NUREG-0654, C.3,I.8.,9.,J.11)  
(NUREG-0654, C.3,I.8.,9.,J.11)  


EXTENT OF PLAY:   
EXTENT OF PLAY:   


Participants:  NC Radiation Protection Fixed Laboratory  
Participants:  NC Radiation Protection Fixed Laboratory
: 5. EMERGENCY NOTIFICATION AND PUBLIC INFORMATION 5.a - Activation of the Prompt Alert and Notification System:  
: 5. EMERGENCY NOTIFICATION AND PUBLIC INFORMATION 5.a - Activation of the Prompt Alert and Notification System:  


Line 987: Line 951:
Criterion 5.b.1:
Criterion 5.b.1:
OROs provide accurate emergency informat ion and instructions to the public and the news media in a timely manner.
OROs provide accurate emergency informat ion and instructions to the public and the news media in a timely manner.
  (NUREG-0654, E.5.,7.,  G.3.a., G.4.a.,b.,c.)  
(NUREG-0654, E.5.,7.,  G.3.a., G.4.a.,b.,c.)  


EXTENT OF PLAY:
EXTENT OF PLAY:
Line 997: Line 961:
Homeland Security Exercise and Evaluation Program (HSEEP)
Homeland Security Exercise and Evaluation Program (HSEEP)
AAR 2011 Harris Nuclear Plant REP Exercise Appendix D:  Extent of Play Agreement 2011 HNP REP Exercise 63
AAR 2011 Harris Nuclear Plant REP Exercise Appendix D:  Extent of Play Agreement 2011 HNP REP Exercise 63
* State will relocate the news writers to the SEOC. This is a physical re-assignment of people, but does not change the duties or coordination. This will be demonstrated for Training Only.  
* State will relocate the news writers to the SEOC. This is a physical re-assignment of people, but does not change the duties or coordination. This will be demonstrated for Training Only.
: 6. SUPPORT OPERATION/FACILITIES 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees   
: 6. SUPPORT OPERATION/FACILITIES 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees   


Line 1,003: Line 967:


The reception center/emergency worker facility has adequate space, resources and trained personnel to provide monitorin g, decontamination and registration of  emergency workers and evacuees.
The reception center/emergency worker facility has adequate space, resources and trained personnel to provide monitorin g, decontamination and registration of  emergency workers and evacuees.
(NUREG-0654, J.10.h; K.5.b.)
(NUREG-0654, J.10.h; K.5.b.)
EXTENT OF PLAY:
EXTENT OF PLAY:
* Participants:  Chatham and Wake Counties
* Participants:  Chatham and Wake Counties
Line 1,039: Line 1,003:
6.b - Monitoring and Decontamination of Emergency Worker Equipment:
6.b - Monitoring and Decontamination of Emergency Worker Equipment:
Criterion 6.b.1:
Criterion 6.b.1:
The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment including vehicles.  
The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment including vehicles.
(NUREG-0654, K.5.b.)  
(NUREG-0654, K.5.b.)  


EXTENT OF PLAY:  
EXTENT OF PLAY:  
Line 1,058: Line 1,022:
Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross  
Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross  


planning guidelines. Managers demonstrate the procedures to assure that evacuees have been monitored for contaminatio n and have been decontaminated as appropriate prior to entering congregate care facilities.  
planning guidelines. Managers demonstrate the procedures to assure that evacuees have been monitored for contaminatio n and have been decontaminated as appropriate prior to entering congregate care facilities.
  (NUREG-0654, J.10.h.,12.)
(NUREG-0654, J.10.h.,12.)
EXTENT OF PLAY:
EXTENT OF PLAY:
* Participants: Chatham and Wake Counties Six individuals per monitoring site will be demonstrated.  
* Participants: Chatham and Wake Counties Six individuals per monitoring site will be demonstrated.  

Revision as of 02:39, 30 April 2019

FEMA Harris Nuclear Plant, Final Exercise Report, Exercise Date - November 29, 2011
ML12101A365
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/01/2012
From:
Federal Emergency Management Agency
To:
Office of Nuclear Security and Incident Response
Cecere, Bethany NSIR/DPR 415-6754
References
Download: ML12101A365 (73)


Text

Homeland Security Exercise and Evaluation Program (HSEEP) After Action Report (AAR) 2011 HNP REP Exercise 2011 HNP REP Exercise

After Action Report AFTER ACTION REPORT Harris Nuclear Plant (HNP) Exercise REP Program Exercise

[FINAL] November 29, 2011 Radiological Emergency Prep aredness (REP) Program Published March 1, 2012

Homeland Security Exercise and Evaluation Program (HSEEP) After Action Report (AAR) 2011 HNP REP Exercise 2011 HNP REP Exercise

This Page Is Intentionally Blank

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Table of Contents 2011 HNP REP Exercise 1 Table of Contents Page Table of Contents .............................................................................................................................1 Administrative Handling Instructions ..............................................................................................3 Executive Summary .........................................................................................................................5 Section 1: Exercise Overview .................................................................................................

........7 1.1 Exercise Details .............................................................................................................7 1.2 Exercise Planning Team Leadership ..............................................................................8 1.3 Participating Organizations ............................................................................................8 Section 2: Exercise Design Summary ...........................................................................................

11 2.1 Exercise Purpose and Design .......................................................................................11 2.2 FEMA Exercise Objectives and Capabilities ...............................................................12 2.3 Scenario Summary .......................................................................................................15 Section 3: Analysis of Capabilities ..........................................................................................

.....17 3.1 Exercise Evaluation and Results ..................................................................................17 3.2 Evaluation Summaries .................................................................................................17

3.2.1 State Of North Carolina ...................................................................................17

3.2.1.1 State Emergency Operations Center ..............................................17 3.2.1.2 Central Branch Office ....................................................................18 3.2.1.3 Dose Assessment ...........................................................................18 3.2.1.4 Fixed Laboratory ............................................................................19

3.2.2 Joint Operations ...............................................................................................21

3.2.2.1 Emergency Operations Facility......................................................21 3.2.2.2 Joint Information Center ................................................................21

3.2.3 Risk Jurisdictions .............................................................................................22

3.2.3.1 Chatham County, North Carolina ..................................................22

3.2.3.1.1 Emergency Operations Center .......................................22 3.2.3.1.2 Traffic Control Points ....................................................23 3.2.3.1.3 Backup Route Alerting ..................................................23

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Table of Contents 2011 HNP REP Exercise 2 3.2.3.1.4 Emergency Worker & Vehicle Monitoring & Decon ....24 3.2.3.1.5 Reception and Congregate Care Center .........................24 3.2.3.2 Harnett County, North Carolina .....................................................26

3.2.3.2.1 Emergency Operations Center .......................................26 3.2.3.2.2 Traffic Control Points ....................................................27 3.2.3.2.3 Backup Route Alerting ..................................................27

3.2.3.3 Lee County, North Carolina ...........................................................28

3.2.3.3.1 Emergency Operations Center .......................................28 3.2.3.3.2 Traffic Control Points ....................................................29 3.2.3.3.3 Backup Route Alerting ..................................................30

3.2.3.4 Wake County, North Carolina .......................................................30

3.2.3.4.1 Emergency Operations Center .......................................30 3.2.3.4.2 Traffic Control Points ....................................................32 3.2.3.4.3 Backup Route Alerting ..................................................32 3.2.3.4.4 Protective Actions for Schools.......................................33 3.2.3.4.5 Medical Services Drill ...................................................33 3.2.3.4.6 Reception and Congregate Care Center .........................34 Section 4: Conclusion ........................................................................................................

...........37 List of Appendices Appendix A: Exercise Timeline (Table 1) ....................................................................................39 Appendix B: REP Criterion Evaluation Result Summary (Table 2) ............................................41 Appendix C: Exercise Evaluators and Assignments .....................................................................43 Appendix D: Extent of Play Agreement .......................................................................................49 Appendix E: Acronyms .................................................................................................................67

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Handling Instructions 2011 HNP REP Exercise 3 Administrative Handling Instructions

1. This After Action Report (AAR) for the 2011 Harris Nuclear Plant (HNP) Radiological Emergency Preparedness, Full Plume Phase Emergency Planning Zone (EPZ) Exercise is considered a public document.
2. Points of Contact:

Federal: State of North Carolina:

Mr. Kevin Keyes Mr. Doug Hoell North Section Chief Director FEMA Region IV Emergency Management 3003 Chamblee-Tucker 4713 Mail Service Center Atlanta, Georgia 30341-4122 Raleigh, North Carolina 27699-4713 770/220-5378 910/369-0835 kevin.keyes@dhs.gov DHoell@ncem.org State of North Carolina:

Mr. Stephen Payne Mr. Lee Cox, Section Chief NCEM NC Department of Health & Human REP Program Manager Services 4713 Mail Service Center Radiation Protection Section (RPS)

Raleigh, North Carolina 276991645 Mail Service Center 919/715-0170 Raleigh, North Carolina 27699-1645 spayne@ncem.org Chatham County EOC: Ms. Carolyn Freitag Mr. Tony Tucker NCEM Director State Exercise Officer 297 West Street 4713 Mail Service Center Pittsboro, North Carolina 27312 Raleigh, North Carolina 27699 919/545-8160 919/715-9213 Tony.Tucker@chathamnc.org cfreitag@ncem.org

Wake County:

Harnett County Emergency Mgmt:

Mr. Joshua Creighton Mr. Gary Pope Emergency Services Coordinator Director 337 South Salisbury Street Emergency Services Raleigh, North Carolina 27601-1728 1005 Edwards Drive 919/856-6480 Lillington, North Carolina 27546 joshua.creighton@co.wake.nc.us 910/893-7580 Gpope@harnett.org Progress Energy

Mr. John Southerly Lee County: Emergency Preparedness Manager Mr. Shane Seagrove Emergency Preparedness Unit Supervisor Director 160 Rush Street Emergency Management Raleigh, North Carolina 27603-3594 225 South Steele Street sseagroves@leecountync.gov Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise 2011 HNP REP Exercise 4

This Page Is Intentionally Blank Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Executive Summary 2011 HNP REP Exercise 5 Executive Summary On November 29, 2011, the Department of Homeland Security, Federal Emergency Management Agency (FEMA), Region IV, Radiological Emergency Preparedness (REP) Program staff evaluated a plume exposure pathway exercise in the emergency planning zone (EPZ) around the Shearon Harris Nuclear Plant (HNP). The eval uation of out of sequence activities during the week of October 11-13, and 26, 2011 is included in th is report. The activi ties included: Traffic control points (TCP); protective actions for schools; reception and congregate care centers; emergency worker and vehicle monitoring and decontamination.

The purpose of the exercise was to assess the le vel of State and local preparedness in responding to a radiological emergency. This exercise was held in accordance with FEMA's policies and guidance concerning the exercise of State and local radiological emergency response plans and procedures. The previous federally evaluate d exercise was conducted on March 3, 2009. The qualifying emergency preparedness exercise was conducted February 28, 1987.

Officials and representatives from the State of North Carolina; the risk counties of Chatham, Harnett, Lee and Wake; the Nuclear Regulatory Commission (NRC), Region II; and Progress Energy as well as numerous volunteers participated in this exercise. FEMA Region IV also played in the exercise by pr oviding response liaison personnel to the State of North Carolina, which contributed to exercise realism. The c ooperation and teamwork of the participants was evident throughout all phases of the exercise. FEMA wishes to acknowledge the efforts of the many individuals who participated and made the exercise a success.

State and local organizations demonstrated knowledge of their emergency response plans and procedures and successfully implemented them.

FEMA did not identify any Deficiencies or Areas Requiring Corrective Action (ARCA) during th is exercise. The strength of the working relationships between the various State and lo cal first responder agencies in their mission planning and execution abilities throughout all phases of th e exercise was obvious, and confirmed the success of the Harris Task Force organizational structure. The Harris Task Force, co-chaired by representatives from both North Carolina Emergency Management and Progress Energy, has proven to be an excellent example of public and private agency cooperation.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Executive Summary 2011 HNP REP Exercise 6 The objectives for the 2011 HNP REP Exercise were as follows:

  • Objective 1: Demonstrate the ability to provide emergency operations center (EOC) management including direction and c ontrol through the State and counties EOC Multi-Agency Coordination Center System (MACCS).
  • Objective 2: Demonstrate the ability to provide protective action decision-making for State and county emergency workers and the general public through exercise play and discussions of plans and procedures.
  • Objective 3: Demonstrate the ability to physically implement protective actions for State and county emergency workers a nd the general public through exercise demonstration.
  • Objective 4: Demonstrate the ability to activate the Prompt Alert and Notification System using the North Carolina Alert and Notification System through exercise play.
  • Objective 5: Demonstrate the effectiveness of plan s, policies and procedures in the Joint Information Center (JIC) for joint (public and private sector) emergency information communications.
  • Objective 6: Demonstrate the ability to conduct independent dose assessment, management of field teams, and mobile or fixed laboratory analys is in response to a radiological release. These objectives encompass the REP Exercise Eval uation Criteria as negotia ted in the Extent of Play Agreement in Appendix C.

FEMA will provide an Improvement Plan (IP) to the State of North Carolina that describes Strengths and Areas for Improvement observed during the exercise. The IP will be published under a separate cover and classified For Official Use Only (FOUO) in compliance with HSEEP standards.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 1: Exercise Overview 2011 HNP REP Exercise 7 Section 1: Exercise Overview 1.1 Exercise Details Exercise Name 2011 Harris Nuclear Power Plant REP Evaluated Exercise Type of Exercise Full-Scale Exercise Exercise Out of Sequence/Off Scenario Dates October 11-13, 2011 and October 26, 2011 Exercise Date November 29, 2011 Locations See Appendix F for a complete listing of lo cations of supported exercise activities.

Sponsors North Carolina Emergency Management Progress Energy 116 West Jones Street Harris Nuclear Plant 4713 Mail Service Center 3932 New Hill-Holleman Road Raleigh, North Carolina 27699 New Hill, North Carolina 28217

Program FEMA REP Program Mission Response Capabilities Emergency Operations Center Management Emergency Public Information and Warning Citizen Evacuation and Shelter in Place Mass Care Emergency Public Safety and Security Response Hazardous Materials Response and Decontamination Triage and Pre-Hospital Treatment Public Health Laboratory Testing Scenario Type REP, Full Plume Phase EPZ

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 1: Exercise Overview 2011 HNP REP Exercise 8 1.2 Exercise Planning Team Leadership See App. G for a listing of the members of the exercise planning team leadership.

1.3 Participating Organizations

The following agencies, organizations and units of government partic ipated in the 2011 HNP REP Exercise.

Federal Department of Homeland Security, FEMA Region IV State of North Carolina Office of the Governor

  • Public Information
  • Office of Citizen's Affairs Department of Crime Control and Public Safety (CCPS)
  • Division of Emergency Management
  • National Guard
  • Public Affairs Office Department of Environment a nd Natural Resources (DENR)
  • Division of Environmental Health, Radiation Protection Section (RPS)
  • Wildlife Resources Commission Law Enforcement Department of Health and Human Services
  • Division of Public Health - Office of Public Health
  • Division of Facility Services Risk Jurisdictions Chatham County
  • Chatham County Emergency Management
  • Chatham County Emergency Medical Service
  • Chatham County Fire/Rescue
  • Chatham County Sheriff's Office
  • Chatham County Board of Education
  • Chatham County Social Service
  • Chatham County Health Department
  • Chatham County Mental Department
  • Pittsboro Fire Department Harnett County
  • Harnett County Emergency Management
  • Harnett County Emergency Medical Services
  • Harnett County Fire/Rescue
  • Harnett County Sheriff's Office
  • Harnett County Board of Education
  • Harnett County Social Service Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 1: Exercise Overview 2011 HNP REP Exercise 9

  • Harnett County Health Department Lee County
  • Lee County Emergency Management
  • Lee County Fire/Rescue
  • Lee County Sheriff's Office
  • Lee County Board of Education
  • Lee County Social Service
  • Lee County Health Department
  • Wake County
  • Wake County Emergency Management
  • Wake County Fire/Rescue
  • Wake County Sheriff's Office
  • Wake County Board of Education
  • Wake County Social Service
  • Wake County Health Department
  • Wake County Mental Department
  • Fuquay- Varina Fire Department /Police Department Non-Governmental Organizations Radio Amateur Civil Emergency Services (RACES)/Amateur Radio Emergency Services (ARES) American Red Cross (ARC)

Progress Energy

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise 2011 HNP REP Exercise 10

This Page Is Intentionally Blank Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 2: Exercise Design Summary 2011 HNP REP Exercise 11 Section 2: Exercise Design Summary 2.1 Exercise Purpose and Design DHS/FEMA administers the REP Program pursuan t to the regulations found in Title 44 Code of Federal Regulation (CFR) part s 350, 351 and 352. 44 CFR 350 codifies 16 planning standards that form the basis for radiological emergency response planning for licensee, State, tribal and local governments impacted by the EPZs established for each nuclear power plant site in the United States. 44 CFR 350 sets forth the mechanisms for the formal review and approval of State, Tribal and local government RERPs and procedures by DHS/FEMA. One of the REP program cornerstones established by these regulations is the biennial exercise of offsite response capabilities. During these exercises State, Tribal and local governments demonstrate their abilities to implement their plans and procedures to pr otect the health and safety of the public in the event of a radiological emergency at the nuclear plant.

The results of this exercise together with review of the RERPs and procedures and verification of the periodic requirements set forth in NUREG-0654/FEMA-REP-1 through the Annual Letter of Ce rtification and staff assistan ce visit enables FEMA to provide a statement with the transmission of this final AAR to the NRC that State, Tribal and local plans and preparedness are (1) adequate to protect the health and safety of the public living in the vicinity of the nucl ear power facility by providing reasonable assurance that appropriate protective measures can be taken offsite in the event of a radiological emergency; and (2) capable of being implemented.

On March 28, 1988, the State of North Carolina formally submitted the RERP for the HNP to FEMA Region IV. Formal approval of the RERP was granted by FEMA on April 29, 1989 in accordance with 44 CFR 350.

A REP exercise was evaluated on November 29, 2011, and included evaluations of the

following out-of-sequence activities held from Oct ober 11 through 13, 2011, and on October 26, 2011:

  • Chatham County: Emergency worker and equipment monitoring and decontamination at Pittsboro Fire Department, Old Graham Road Fire Station on October 11, 2011; Reception and congregate care center operations at Northwood High School on October 13, 2011.
  • Wake County: Protective actions for schools at Fuquay-Varina Senior High School on March 21, 2011; Reception and congregate care center operations at Garner Magnet High School on October 26, 2011. Medical Services Drill (MS-1) at Hospital October 12, 2011.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 2: Exercise Design Summary 2011 HNP REP Exercise 12 2.2 FEMA Exercise Objectives and Capabilities Capabilities-based planning allows for exer cise planning teams to develop exercise objectives and observe exercise outcomes through a framework of specific action items that were derived from the Target Capabilities List (TCL). The capabilities listed below form the foundation for the organization of all FEMA Region IV REP Program

objectives and observations in this exercise.

  • Emergency Operations Center Management: Is the capability to provide multi-agency coordination (MAC) for incident management by activating and operating an EOC for a pre-planned or no-notice event. EOC management includes EOC activation, notification, staffing, and deactivation; management, direction, control, and coordination of response and recovery activities; coordination of efforts among neighboring governments at each level and among local, regional, State, and Federal EOCs; coordination public information and warning; and maintenance of the information and communication necessary for coordinating response and recovery activities.
  • Emergency Public Information and Warning: Is the capability that includes public information, alert/warning and notification.

It involves developing, coordinating, and disseminating information to the public, coordinating official s, and incident management and responders across all jurisdictions and disciplines effectively under

all hazard conditions.

  • Citizen Evacuation and Shelter in Place: Is the capability to prepare for, ensure communication of, and immediately execute th e safe and effectiv e sheltering-in-place of an at-risk population (and companion animals), and/or the organized and managed evacuation of the at-risk population (and companion animals) to areas of safe refuge in response to a potentially or actually dangerous environment. In addition, this capability involves the safe reentry of the population where feasible.
  • Emergency Public Safety and Security Response: Is the capability to reduce the impact and consequences of an incident or major event by securing the affected area, including crime/incident scene preservation i ssues as appropriate, safely diverting the public from hazards, providing security support to other response operations and properties, and sustaining operations from response through recovery. Public Safety and Security Response requires coordination among officials from law enforcement (LE), fire and EMS.
  • Hazardous Materials Response and Decontamination: Is the capability to assess and manage the consequences of a hazardous materials release, either accidental or as part of a terrorist attack.

It includes testing and id entifying all likely hazardous substances onsite; ensuring that responders have protective clothing and equipment; conducting rescue operations to remove affected victims from the hazardous environment; conducting geographical survey searches of suspected sources or Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 2: Exercise Design Summary 2011 HNP REP Exercise 13 contamination spreads and establishing isolation perimeters; mitigating the effects of hazardous materials, decontaminating on-site victims, responders, and equipment; coordinating off-site decontamination with relevant agencies, and notifying environmental, health, and law enforcement agencies having jurisdiction for the incident to begin implementation of their standard evidence collection and investigation procedures.

  • Triage and Pre-Hospital Treatment:

Is the capability to appropriately dispatch EMS resources; to provide feasible, suitable, and medically acceptable pre-hospital triage and treatment of patients; to provide transport as well as medical care en-route to an appropriate receiving facility; and to track patients to a treatment facility.

  • Mass Care: Is the capability to provide immediate shelter, feeding centers, basic first aid, bulk distribution of needed items, and related services to persons affected by a large-scale incident, including sp ecial needs populations. Special needs populations include individuals with physical or mental disabilities who require medical attention or personal care beyond basic first aid. Other special-needs populations include non-English speaking populations that may need to have information presented in other languages. The mass care capability also provides for pet care/handling through local government and appropriate animal-related organizations. Mass care is usually performed by nongovernmental organizations (NGO), such as the ARC, or by local government-sponsored volunteer efforts, such as Citizen Corps. Special-needs populations are generally the responsibility of local government, with medical needs addressed by the medical community and/or its alternate care facilities. State and Federal entities also play a role in public and environmental health by ensu ring safe conditions, safe food, potable water, sanitation, clean air, etc.
  • Public Health Laboratory Testing: The Public Health Laboratory Testing capability is the ongoing surveillance, rapid detection, confirmatory testing, data

reporting, investigative suppor t, and laboratory networking to address potential exposure, or known exposure, to all-hazards which include chemical, radiochemical, and biological agents in all matrices including clinical specimens, food and environmental samples, (e.g., water, air, soil). All-hazard threats include those deliberately released with criminal intent, as well as those that may be present as a result of uninten tional or natural occurrences.

Additionally, each capability is linked to several corresponding activities and tasks to provide additional detail. Based upon the id entified exercise object ives, the following capabilities and associat ed activities are:

  • Objective 1: Demonstrate the ability to provide EOC management including direction and control through the Counties and State EOC MACCS. Capability: EOC Management -

Activate EOC/MACC/IOF; Direct Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 2: Exercise Design Summary 2011 HNP REP Exercise 14 EOC/MACC/IOF Tactical Opera tions; and Provide EOC/MACC/IOF Connectivity

  • Objective 2: Demonstrate the ability to provide protective action decision-making for State and County emergency workers and public through exercise play and discussions of plans and procedures. Capability: EOC Management -

Gather and Provide Information; Identify and Address Issues; and Support and Coordinate Response Capability: Emergency Public Information and Warning -

Manage Emergency Public Information and Wa rnings; Activate Emergency Public Information, Alert/Warning, and Notification Plans and Issue Emergency Warnings

  • Objective 3: Demonstrate the ability to physically implement protective actions for State and Counties' emergency workers a nd public through exercise demonstration. Capability: EOC Management - Direct EOC Tactical Operations; Gather and Provide Information; and Identify and Address Issues Capability: Emergency Public Safety and Security Response - Activate Public

Safety and Security Response; Control Traffic, Crowd, and Scene; and Command and Control Public Safety and Security Response Operations Capability: Citizen Evacuation and Shelter-in-Place -

Direct Evacuation and/or In-Place Protection Operations; Activate Evacuation and/or In-Place Protection; Implement Evacuation Orders for General Population; Collect and Evacuate Population Requiring Assistance Capability: Hazardous Materials Response and Decontamination -

Direct Hazardous Material Response and Decontamination Tactical Operations; Activate Hazardous Material Response and Decontamination; Assess Hazard and Evaluate Risk; and Conduct Decontamination a nd Clean-up /Recovery Operations Capability: Mass Care (Sheltering, Feeding, Related Services) - Establish Shelter Operations and Sh elter General Population. Capability: Triage and Pre-Hospital Treatment - Direct Triage and Pre-Hospital Treatment Operations; Activate Triage and Pre-Hospital Treatment; Transport; and Provide Treatment

  • Objective 4: Demonstrate the ability to activate the Prompt Alert and Notification System utilizing the Public Notification System (PNS)/Emergency Alert System (EAS) through exercise play.

Capability: Emergency Public Information and Warning -

Manage Emergency Public Information and Wa rnings; Activate Emergency Public Information, Alert/Warning, and Notification Plans; and Issue Public Information, Alerts/Warnings, and Notifications.

  • Objective 5:

Demonstrate the effectiveness of pl ans, policies and procedures in the JIC for joint (public and private sectors) emergency information communications. Capability: Emergency Public Information and Warning - Establish JIC; Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 2: Exercise Design Summary 2011 HNP REP Exercise 15 Conduct JIC Operations; Issue Public Information, Alerts/Warnings, and Notifications; Conduct Media Relations; and Provide Public Rumor Control.

  • Objective 6: Demonstrate the ability to conduct independent dose assessment, management of field teams, and mobile or fixed laboratory analys is in response to a radiological release. Capability: Hazardous Materials Response and Decontamination -

Direct Hazardous Material Response and Decontamination Tactical Operations; Activate Hazardous Material Response and Decontamination; Assess Hazard and Evaluate Risk; and Conduct Decontamination a nd Clean-up /Recovery Operations Capability: Public Health Laboratory Testing - Obtain and Direct Laboratory Testing, Surveillance, rapid detection, confirmatory testing, data reporting, investigative support, and laboratory networ king to address potential exposure, or known exposure to in all matrices including clinical specimens, food and environmental samples, (e.g., water, air, soil).

2.3 Scenario Summary

0740 All four Turbine Governor Valves go shut. Reactor trip signal on 2/3 coincidence. Reactor Trip Breakers DO NOT open; Reactor IS able to be tripped from SECOND control switch.

Control rods J13, G13 and H14 par tially insert into the core.

Safety Injection is required.

Upon Safety Injection Signal, Main Steam Li ne Isolation Signal fails to shut 'B' MSIV. Condenser Steam Dump Valve, also remains open.

0755 ALERT EAL SA3.1, Automatic trip fails to shut down th e reactor and the manual actions taken from the reactor control console ARE successful in shutting down the reactor.

1030 SG 'B' tube rupture (300 gpm) occurs, near tube sheet. Rupture remains covered throughout the scenario. Safety Injection manually re-initiated. Crew enters Path-2 for SGTR. Release path is thr ough the Turbine Building Vent Stack.

SITE AREA EMERGENCY, based on one of the two EALs below EAL FS1.1, Loss or Potential Loss of any two barriers

  • LOSS of the Containment System Barri er; Ruptured SG is also faulted outside Containment Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 2: Exercise Design Summary 2011 HNP REP Exercise 16 EAL RS1.1, Valid reading on any radiation monitor > Table R-1 column "SAE" for

> 15 min (Note 1)

Turbine Building Vent Stack 3A WRGM > 1.27E+08 (wide range gas monitor).

1145 Chemistry produces RCS Sample results that are > 300 mCi/gm dose equivalent I-131. Turbine Building Vent Stack, reads >1.27E+09.

1200 GENERAL EMERGENCY, based on one of the two EALs below EAL FG1.1, Loss of any two barriers and th e Loss or Potential Loss of the third barrier

  • LOSS of the Containment System Barri er; Ruptured SG is also faulted outside Containment
  • Coolant activity > 300 mCi/gm dose equivalent I-131 R OR EAL RG1.1, Valid reading on any radiation monitor > Table R-1 column "GE" for

> 15 min (Note 1)

Turbine Building Vent Stack 3A WRGM > 1.27E+09 1215 Wind direction is from 245 o.; Wind speed is 1.79 mph. Evacuate 2-mile radius and 5 miles downwind subzones ABC; shelter remaining. State and County notifications of GE, PARS, no KI

1330 Wind Shifts from 245 to 190. Wind Speed changes from 0.5 mph to 2.0 mph. PARS change from Evacuate A BC to evacuate ABCL(added L).

1350 Damage Control Team is able to close MSIV, release is terminated. Trailing edge of plume tracked out of 10-mile EPZ.

1600 Drill termination.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise17 Section 3: Analysis of Capabilities 3.1 Exercise Evaluation and Results

This section contains the resu lts and findings of the evalua tion of all jurisdictions and functional entities that participated in the November 29, 2011 plume exercise and OOS interviews and demonstrations of Octobe r 11-13, and 26, 2011. Exercise criteria are listed by number and the demonstration status of those criteria are indicated by the use of the following terms:

  • Met (No Deficiency or ARCAs assess and no unresolved ARCAs from prior exercise)
  • ARCAs assessed or unresolved ARCAs from previous exercises
  • Deficiency assessed
  • Plan Issues
  • Not Demonstrated 3.2 Evaluation Summaries

3.2.1 State of North Carolina 3.2.1.1 State Emergency Operations Center Emergency Operations Center Man agement Capability Summary:

This capability was successfully demonstrated by the State Emergency Response Team (SERT) at the State Emergency Operations Ce nter (SEOC) and the Central Branch Office (CBO) Regional Coordination Center (RCC).

The SERT activated the SEOC in a timely manner and effectively demonstrated the State's emergency response actions for a ra diological incident involving the HNP. The SERT Leader provided directi on and control for the response effort, encouraging his key staff to anticipate necessary actions to be taken should plant or meteorological conditions change. SERT members were knowledgeable of their responsibilities and successfully coordinated necessary actions with the risk counties of Chatham, Harnett, Lee, and Wake, various State and Federal agencies, and the ut ility. Periodic conference calls and status briefings ensured the counties and agencies ha d current situational awareness. The SERT Leader and risk counties conc urred on appropriate decisions to protect the health and safety of the public and emergency workers.

Emergency Public Information an d Warning Capability Summary:

The SERT PIO staff operating from the SEOC demonstrated this capability through activities related to the prompt notification system and the subsequent coordination of emergency information developed by public information personnel supporting the JIC.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise18 Emergency instructions for the public in res ponse to the incident at HNP were prepared, coordinated and disseminated in accordance w ith Annexes C and E of the North Carolina Radiological Emergency Response Plan. Fo llowing concurrence between the State and risk counties on protective action decisions (PAD) for the public, the SERT transmitted the appropriate EAS message to broadcast radio stations via the EMnet system for broadcast at the agreed upon time. Secondary notification was accomplished by faxing the message to the National Weather Service (NWS) for broadcast over the NWS radio system, received by tone alert radios.

The preparation and dissemination of emergency information was accomplished at the JIC. Prior to release, the JIC writers provided draft information releases to the SERT PIO for proof reading and editing of information prior to approval by the SERT Leader. The information releases were then returned to the JIC for final dissemination.

For this capability the following REP Criteria were met: 5.a.1 and 5.b.1

3.2.1.2 Central Branch Office

The CBO demonstrated the capability to effectively activate and manage the RCC

through the activation and deployment of selected staff to liaise with the utility, support the joint information effort and coordinate jurisdictional response requirements. While the CBO-RCC effectively executed its responsi bilities, two notable actions stood out. First, the CBO-RCC uniquely involved counties in the 50-m ile Ingestion Pathway Zone (IPZ), counties not normally involved in plume phase exercise s, through the provision of periodic situational upda tes. This action recognized that the CBO-RCC responsibilities extend to a greater population than in the four risk counties.

Secondly, the CBO-RCC demonstrated its attenti on to detail and analysis of requirements when they questioned the viability of a selected equipment relocation staging area. This action also helped identify the need for increased dissemination of selected operating guidelines within the response community.

For this capability the following REP Criteria were met: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1 and 2.b.2

3.2.1.3 Dose Assessment Hazardous Materials Response and Decontamination Capability Summary:

During the HNP November 2011 Exercise the State of North Carolina Department of Health and Human Services (DHHS); Radia tion Protection Section (RPS) demonstrated the capability to perform the required accident assessment including dose projections and field team surveys to support protective action recommendations (PAR) to the SERT Leader. The RPS Accident Assessment Center was in the SEOC that was located at 116 Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise19 West Jones Street, in Raleigh, NC. This location is about 22 mile s northeast of HNP and outside the plume exposure emergency planning zone.

During the exercise, the RPS staffed all ke y positions and was operational by 0930. The primary method of communications in the SEOC was landline phones and face-to-face communications within the SEOC. Communications with the Field Monitoring Teams (FMT), Sample courier, SERT Power Plant Liaison at the HNP Emergency Operations Facility (EOF) and the Mobile Laboratory were through the 800 MHz radio system. The FMTs were well equipped, knowledgeable of their procedures and use of survey and air sampling equipment while in the field. They we re positioned to detect any releases from the plant and moved accordingly to anticipate any changes in the path of plume travel away from the plant due to changing meteorological conditions. They reported back all requested survey and air sample data in a timely manner.

Dose Assessment personnel continuously mon itored the electronic data from the HNP and performed timely dose projections based upon updated data and information from the EOF. The Director RPS provided timely and effective PARs to the SERT Leader based collectively on plant conditions, dose projections, FMT readings and PARs from the plant. When discussing these protective actions with the risk counties, all parties agreed to add several more zones for evacuation based upon local conditions identified on the conference call. Projected exposure informa tion was also provided and discussed with the Department of Public Health concerni ng radioactive Iodine dose projections which resulted in a recommendation for issuance of KI to both Emergency Workers (EW) and the General Public.

For this capability the following REP Criteria were met: 1.a.1, 1.d.1, 1.e.1, 1.c.1, 2.a.1, 2.b.1 and 2.b.2

3.2.1.4 Fixed Laboratory Public Health Laboratory Te sting Capability Summary:

During the HNP November 29, 2011 Exercise the State of North Carolina DHHS, Laboratory Services Section, Fixed Laboratory demonstrated the capability to perform the required radiological anal yses to support PADs. The Fi xed Laboratory was located at 306 North Wilmington Street, in Raleigh, NC. This location is about 22 miles northeast of the HNP and outside the plume exposure emergency planning zone.

For the exercise, personnel were at their normal workstations at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />. The Fixed Laboratory facility consisted of personnel assigned to the Radiochemistry Laboratory Preparation Area (fourth floor Room 417) and the Radio-analysis Count Room (First Floor Room 101) functions. Only one technician in the Laboratory was trained to use the Counting equipment. He was not present during the demonstration conducted by the Laboratory Manager. It was indicated that the Laborat ory could be activated on weekends if necessary with in one hour. During the exercise, timely communications Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise20 were maintained with the RPS SERT C oordinator using the landline line.

The RPS Sample Courier successfully demonstrated the delivery of samples to the loading dock area of the laboratory build ing. Laboratory personnel successfully demonstrated the receipt of an air sample cartridge, an air sample filter paper and vegetation. The Chain of Custody form wa s signed and a copy was retained by the Laboratory. Procedures were followed to measure the sample bag contact dose rate. The RPS Sample Control located at the Mobile Laboratory screen, prepare and package samples for transfer to the Fixed Laboratory by the Sample Courier. Procedures were in place to record and track all samples, using a bar code system.

The Fixed Laboratory was equipped with three gas filled Proportional Counters (Canberra Tennelec Series 5) to perform gr oss alpha or beta-gamma counting of air sample cartridges, filter papers and wipes. One of these counters also had the capability to do gamma spectrometry using a sodium iodi de detector. It wa s new and not yet in operation.

The Laboratory also had two operating Canberra High Purity Germanium Detectors (HP Ge) with a 4096 Multi-Channel analyzer to perform gamma spectrometry for different solid and liquid geometries. The Laboratory routinely performs environmental sample analyses and the Lower Limits of Detection (LLD) were more than sufficient to allow for protective action decision-making based on the US Food and Drug Administration's Derived Intervention Levels (FDA DIL) for food. The HPGe system was calibrated annually. Also, a daily Quality Control check was done using a check source. The preferred counting geometry was a 1-liter Marinelli Container, although the detectors

were also calibrated for the 0.5 and 3.5 liter Marinelli geometries.

The Laboratory used sources traceable to the National Institute of Standards and Technology (NIST) for calibration of the HPGe detectors and the proportional counters.

Also, the Laboratory purchases blind, spiked samples from Environmental Research Associates (ERA) for an independent check of their accuracy and capability. The results are posted by ERA and action is taken by the laboratory if the results are not in an acceptable range.

The Fixed Laboratory has storage capability for a limited quantity of samples. The RPS SERT Coordinator indicated that the RPS would use the storage capability at their offices. The Fixed Laboratory does not do wet chemistry e.g., strontium-90 analyses.

This would be done by a contra ct commercial laboratory.

For this capability the foll owing REP criteria were met: 1.a.

1, 1.d.1, 1.e.1, 3.a.1 and 4.c.1

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise21 3.2.2 Joint Operations

3.2.2.1 Emergency Operations Facility Emergency Operations Center Man agement Capability Summary:

Direction and Control of emergency management operations were the responsibility of the utility operator and were fulfilled in a professional and effective manner. The State and local government officials dispatched to the EOF served in an all important liaison capacity between the utility operator and their respective EOCs. The government officials in conjunction with the utility operator's Emergency Director, effectively communicated, coordinated and functioned as a cohesive response and recovery unit.

The utility operator's assessment as well as the State's independent assessments of the offsite health and safety considerations s upported the PARs. They were initially based solely on plant conditions, and the subsequent PARs were based on sound technical analyses, which included environmental field measurements, computerized dose assessment models, and a thorough understanding of the simulated emergency at hand, as well as discussions and interactions with the utility operator' s senior staff. There were adequate supplies and equipment ava ilable to support re sponse operations

For this capability the following REP criterion was met: 2.b.1 3.2.2.2 Joint Information Center

Emergency Public Information an d Warning Capability Summary:

The agency representative of the JIC demonstrated this capability by developing, coordinating and disseminating emergency public information. The JIC served as the central point of contact for the distribution and release of information to the media and public during an emergency at the HNP. The JIC is maintained by the utility and offers ample space for the Public Information Officers (PIO) and supplemental technical staff from the utility, State of North Carolina, risk counties and the Federal agencies to perform the duties required of them.

For this exercise, in accordance with the Extent of Play Agreement (EOPA), the JIC staff was not prepositioned and responded to the JIC in real time. The JIC was well equipped

and has redundancy in communications, which includes landline phones, facsimiles and internet connectivity. Both primary and secondary systems were established and maintained throughout the exercise with no failures observed.

A total of 68 press releases were formulated and distributed by the JIC staff. This included 13 in Spanish by Chatham County. There were four media briefings during the exercise. The spokespersons answered the questions asked of them and were able to discuss what actions have been taken by their organizations. A critical aspect of keeping the Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise22 public informed is ensuring the correct information is available and erroneous information is corrected and rumors squelched. Both the State and the Utility's rumor control function were performed in the JIC. The four risk counties performed rumor control at their EOCs. The spokespersons in the JIC were aware of the calls received and addressed trends and rumors during the me dia briefings. The applicable citizen information numbers were provided to the public during each media briefing and on all press releases.

For this capability the following REP Criteria were met: 1.a.1, 1.d.1 and 1.e.1 3.2.3 Risk Jurisdictions

3.2.3.1 Chatham County, North Carolina

3.2.3.1.1 Emergency Operations Center Chatham County successfully demonstrated the capability to provide multi-agency coordination (MAC) for incident manageme nt by activating and operating the Chatham County EOC. Chatham County Communication Center/Warning Point received the Alert ECL, and notified the Emergency Management Director of the emergency at HNP. At the request of the Director and under the ge neral direction of th e County Manager, the EOC personnel were called and the EOC was activated. Chatham County maintains minimum staffing of the EOC during working hours with personnel from the Department of Emergency Services.

The EOC had sufficient equipment and comm unications for conducting operations and communicating with the State, other counties and local government agencies and departments, including two dedicated telephone systems, computers, faxes and radios.

The Director and the EOC personnel clearly demonstrated the ability to provide an effective emergency response. The Director provided outstanding direction and control throughout the exercise and demonstrated the ability to protect the health and safety of the citizens of the county. Th e coordination between the Dire ctor and the Director of Public Health regarding the decision to order the issuance of KI to EWs and the general public and then to ingest KI was outstanding.

All decisions were discussed with other counties, State Public Health and the SEOC.

The EOC protected the only endangered school of the county Moncure Elementary by ordering an early precautionary relocation of about 300 students and teachers to Northwood Senior High School at the Alert ECL. Horton Elementary buses assisted in the relocation of the school.

The County also calls the pr e-identified Functional needs populations and placed on stand-by at the same time. They relocated these populations at the Site Are Emergency ECL.

For this capability the following REP Criteria were met: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise23 2.b.2, 3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1 and 3.d.2 Emergency Public Information and Warning Capability Summary:

Chatham County successfully demonstrated th e capability to deve lop, coordinate and disseminate accurate alerts and emergency information to the media and the public. The siren system was activated from Wake County; a report of the siren activation was faxed and printed by the EOC. Chatham County has th e ability to activate the siren system, at a fast-paced event. Under the leadership of the Chair of the County Commission and the Emergency Management Director, the EOC coor dinated with the State of North Carolina and the other affected Counties to decide on the appropriate messages to be issued by the State and the times for siren activations and EAS activations. They further demonstrated the capability to do Backup R oute Alerting (BRA) as need ed. They also provided emergency information to the public through a total of 13 press releases in English and

Spanish, and coordinated and resolved P ublic Inquiry throughout the exercise.

For this capability the following REP Criteria were met: 5.a.1, 5.a.3 and 5.b.1

3.2.3.1.2 Traffic Control Points

Public Safety and Security Response Capability Summary:

Chatham County successfully demonstrated the ca pability to provide safety and security to the general population of Chatham C ounty during an evacuation. The TCPs demonstration was conducted by interview at the Chatham County EOC. The North Carolina State Highway Patrol (SHP) represen tative there demonstrated his knowledge of activation and communication capabilities, equipment including dosimetry and KI, and how the 13 pre-identified TCPs in Chatham County would be implemented. He was

knowledgeable of how both Self Reading Dosimetry (SRD) and Permanent Record Dosimetry (PRD) would be worn and used, what exposure limits were in place for him as an EW, when and how to record the SRD readings, and what to do at each exposure limit. He had KI (simulated) with written instructions and was aware of it use, limitations, and possible side effects. Using the Standard Operating Guidelines (SOG), he knew who would activate TCPs and when this would take place. He was aware of how possible impediments would be identified and handled.

For this capability the following REP Criteria were met: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.1 and 3.d.2

3.2.3.1.3 Backup Route Alerting

Emergency Public Information and Warning Capability Summary:

Chatham County successfully demonstrated th e capability to deve lop, coordinate and disseminate accurate alerts and emergency information to the media and the public.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise24 Backup route alerting was demonstrated by discussion at the Chatham County EOC. The County Fire Marshall at the EOC explained th at should one of the Chatham County sirens fail he would notify the local Fire Department for the affected area to conduct mobile back-up route alerting. They would be informed of the siren number and referred to the "Siren BRA - Mobile Route Alerting - Complete Loss of Siren System Capability" SOG.

This document details the specific actions the Fire Department would take while performing BRA. Each department would issue dosimetry and KI at their station.

In the event one or more sirens fail the local Fire Department has been supplied with a corresponding map that shows th e coverage circle, the area w ith the roads to be covered, instructions to the Fire Department crew running the route, and the pre-scripted message to be read over the vehicle's public address system. The Fire Marshall stated that each route has been driven and could be completed within 45 minutes from siren failure detection.

For this capability the following REP Criteria were met: 1.a.1, 3.a.1 and 5.a.3 3.2.3.1.4 Emergency Worker and Vehicle Mo nitoring and Decontamination Hazardous Materials Response and Decontamination Capability Summary:

The vehicle decontamination demonstrati on was successfully conducted and followed established standard operating procedures (SOG). The partic ipants are well trained and very knowledgeable of their duties. The exteri or layout was practical and efficient. The equipment was in good repair and served its purpose. The survey instruments were fairly new and worked well in inclement weathe r without failure. Sufficient amounts of equipment and supplies were on hand, and were well organized in labeled bins for easy access. The EWs were familiar with their dosimetry kits, administrative values and the recording of dose values. EWs used the survey instruments properly and consistently utilized teamwork throughout the exercise. Team members displayed excellent organization of responsibilities and thorough monitoring techniques

For this capability the foll owing REP criteria were met: 1.a.1, 1.e.1, 3.a.1, 6.a.1 and 6.b.1 3.2.3.1.5 Reception and Congregate Care Center

Hazardous Materials Response and Decontamination and Mass Care (Sheltering, Feeding and Related Services) Capability Summary:

The Chatham County Department of Social Services (DSS), with support from the Raleigh Triangle Chapter of the American Red Cross (ARC); the Chatham County Board of Education, Environmental Health Department, Sheriff's Department, Emergency Medical Services (EMS) Department, Health Department, Chatham Counseling Center, Amateur Radio Emergency Services and the North Chatham Fire Department successfully demonstrated evacuee monitoring, decontamination, reception and congregate Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise25 care. The volunteers and full-time county staff worked well together in im plementing well-designed emergency procedures. The staffs were well trained in personal protective measures as well as in activities to safeguard the public.

The Radiogical Officer (RO) was knowledgeable of the equipment, practiced in conducting equipment operational checks, organi zed and thorough in tracking issuance of equipment. He successfully maintained and conducted site management and control of RCCC equipment and dosimetry.

Evacuees were directed to the reception area or the decontamination showers. Use of fire department escorts, control lines, sign age and effective communications among fire department responders were in place to insure no evacuees were permitted to enter the RCCC without having been monitored for contamination and decontaminated, as needed. Emergency Worker (EW) effectively demonstrates the decontamination process by walking contaminated (simulated) Personnel through the decontamination process.

For this capability the following REP criteria were met: 1.a.1, 1.e.1, 3.a.1 and 6.a.1

Mass Care (Sheltering, Feeding and Related Services) Capability Summary:

Chatham County successfully demonstrated th is capability at the Northwood High School site. Shelter activities were conducted under the overall s upervision Raleigh Triangle Chapter County Chapter of the American Red Cross, supported by the Chatham County DSS, Chatham County Sheriff's Office and Em ergency Medical Services (EMS). The staff and volunteers demonstrated excellent competence in the reception and processing of evacuees who had evacuated the area surrounding the HNP following a simulated nuclear incident.

The facility was well laid out and could reasonably accommodate the number of evacuees in the Northwood High School. The shelter staff demonstrated the ability to provide basic health, mental health, and special needs support for evacuees; enable them to enter their contact data in the nation-wide ARC website. All evacuees were registered to facilitate tracking and locations they had started from.

For this capability the following REP criterion was met: 6.c.1

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise26 3.2.3.2 Harnett County, North Carolina

3.2.3.2.1 Emergency Operations Center

Emergency Operations Center Man agement Capability Summary:

The Harnett County Emergency Operation Center successfully demonstrated the ability to activate the EOC and notify key staff during an event at the HNP. Utilizing the Rapid Notify system and multiple communications capabilities, the WP demonstrated proficiency in facilitating the activation of the EOC. The Harnett County EOC was staffed and operational in a timely manner.

The Harnett County EMD Direct or (EMDD) quickly took charge of emergency functions and coordinated discussions with the st ate and county organizations. The EMDD provided EOC Staff briefings hourly unless critical information arrived earlier. Message logs were maintained, messages numbered, a nd distributed to desi gnated staff. The EMDD consistently held briefings with key staff personnel and consid ered their input in his final decisions. The EMDD successfully demonstrated direction and control and made timely decisions throughout the exercise. There were adequate supplies and equipment available to support response operation.

The initial KI decision would have been distributed from the Harnett county EOC to EW activities in the field for onsite supervisors to relay the KI order to EW's. The KI order for the general public was successfully coordinated over the decision line and planned for EAS/NOAA radio notificati on to the general public.

The Harnett EMDD makes decisions concerni ng Harnett County Special Populations. The depth of medical needs required for transportation is considered when making decisions for the Special Populations. Typi cally, Special Populations are evacuated at GE; however, a precautionary move was afforded during ECL SAE. All transportation actions and resources are coordinated between the Harnett EMS, Harnett Health Department and Harnett Area Rapid Transportation System (HARTS).

Harnett County successfully demonstrated the capability to provide resources, technical, and policy support to the Incident Command by coordinating the actions of off-site agencies, organizations and jurisdictions, implementing Mutual Aid Agreements (MAA) and requesting higher-level assistance.

For this capability the following REP Criteria were met: 1.a.1, 1.b.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.b.2, 2.c.1, 3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1 and 3.d.2

Emergency Public Information and Warning Capability Summary:

Harnett County successfully developed coordinated and disseminated accurate alert and notifications to the media and the public as incidents at HNP unfol ded. A Harnett County Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise27 PIO representative was at the JIC for coordination between the county and state. Sirens, EAS and NWS Warning systems were activated in sufficient time to notify the at risk public of an emergency. Information messages distributed were accurate, consistent and timely.

Rumor control and public inquiry staff ade quately answered calls using available information and approved news releases. If additional informati on above the county's expertise was required, the callers were referred to the JIC.

For this capability the following REP criteria were met: 5.a.1, 5.a.3 and 5.b.1

3.2.3.2.2 Traffic Control Points

Activate Public Safety and Security Response Capability Summary:

The North Carolina State Highway Patrol (SHP) successfully demonstrated knowledge of the establishment of TCPs. A TCP interview was conducted in accordance with the extent of play at the Harnett County EOC by a Master Trooper, who utilized his plans and procedures to establish and activate nine predetermined TCPs in Harnett County. He was aware of the location of the reception center in the county and the single EW decontamination center. He was knowledgeable on resources available for impediment removal, as well as the process for requesting additional equipment through the dispatch point.

For this capability the following REP criteria were met:

1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.1 and 3.d.2

3.2.3.2.3 Backup Route Alerting

Emergency Public Information and Warning Capability Summary:

Harnett County Fire Department (HCFD) successfully demonstrated a thorough knowledge of BRA for Harnett County in the event of siren failure. An interview was conducted at the Harnett County EOC, the Harnett County Fire Chief briefed that utilizing public address system equipped ve hicles, and a pre-scripted message; the Fire vehicles can effectively mobili ze and deploy assets to seven pre-established routes in less than 45 minutes. The Fire Chief stated that due to the rural area, Fire vehicles alone

would be able to alert the whole area in orde r to ensure all personnel within the zone are notified within 45 minutes.

For this capability the following REP criteria were met: 1.e.1, 3.a.1 and 5.a.3

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise28 3.2.3.3 Lee County, North Carolina 3.2.3.3.1 Emergency Operations Center Emergency Operations Center Man agement Capability Summary:

The Lee County Emergency Management Agency successfully demonstrated the capability to alert, notify and mobilize key staff in response to an incident at HNP in accordance with County plans and the Extent of Play Agreement (EOPA). The County Communications Center served as the County WP, received and appropriately

communicated the initial notifica tion, and relinquished control of alert and notification in accordance with procedures. The EOC staff were alerted, mobilized and activated in a timely manner. The EOC has sufficient space and equipment to support emergency

response efforts. Each agency had an easily identifiable and functional area for conducting its' duties within the EOC. Maps and status boards with vital information were visible and available to the staff for reference and situational awareness. Communications systems were redundant a nd functional with no observed failures.

The Emergency Management Director (EMD) acted as the EOC Manager and exercised good direction and control. The decision ma king process was well defined, coordinated, included participation of the County Commi ssioner and County Manager in deliberation demonstrating their dedication to the safety and welfare of Lee C ounty residents and was paramount to timely and decisive PADs. The EMD conducted numerous staff briefings and updates which considered input from key staff, kept all staff abreast of changing conditions and guided proactive thinking whic h aided in forecasting and contributed to the efficiency of coordination with the State, affected jurisdictions and internal and external agencies. Staff appeared well trained, proactive, and demonstrated high competence in performing their responsibilities.

Officers of the Sanford Police Department, Lee County Sheriff's Department, North Carolina Highway Patrol and Deep River Valley and Cape Fear Fire Department demonstrated through interview thorough knowledge of the procedures for managing TCPs and BRA.

For this capability the following REP criteria were met: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.b.2, 3.d.1, 3.d.2, 5.a.1 and 5.b.1

Emergency Public Information an d Warning Capability Summary:

The Lee County EMD and the EOC PIO successfully demonstrated the capability to develop, coordinate and disseminate emergency information to the public and assure that timely warnings were issued to notify residents of emergency events within the Lee County EPZ. The EMD actively coordinated wi th the Utility Liaison, the SEOC and risk counties to concur in decisions and scheduled three activations of the siren system to implement four PADs. The EMD carefully reviewed all of the County Public Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise29 Information News Releases prior to authoriz ing their release to the JIC and through the media to the public. Pertinent key decisions in the EOC were developed from pre-scripted news releases, author ized individually by the EMD a nd quickly distributed to the JIC, SEOC and risk counties. The PIO interacted constantly with the Lee PIO (located in the JIC) and appropriate EOC staff to make sure that all media releases accurately reflected timely and accurate information through the issue of nine news releases. Public inquiries were addressed accurately through coordination with the proper EOC staff and HNP Liaison as required. The EOC staff was kept current with the Lee County News Releases (and other PIO activities) by e-mail messages.

For this capability, the following REP criteria were met: 5.a.1, 5.a.3 and 5.b.1

3.2.3.3.2 Traffic Control Points

Activate Public Safety and Security Response Capability Summary:

The North Carolina State Highway Patrol (NCSHP), Lee County Sheriff Department and the Sanford Police Department have the responsibility for coordination of TCPs. They are responsible for traffic control measures in support of an incident at HNP, to include evacuation of restricted areas, establishing ro adblocks, preventing entry into restricted zones and clearing impediments which could hinder zone evacuations. The Department of Transportation (DOT) and the County Public Works Department assist Law Enforcement (LE) in a support ro le with barricades or other support equipment to aid in the removal of impediments. At ECL Alert, roadblocks and TCP operations are initiated by the EOC Manager and coordinated and implemented by th e responsible LE agencies in the EOC. The management piece for this operation was explained by interview in the

Lee County EOC, by LE Officers from all th ree agencies. The Officers were very knowledgeable of TCP locations and operations. They gave details in the use of maps, controlled access and routes. They were also familiar in the use of equipment, kits and communication systems necessary to effectively perform their duties. They explained the procedures for directing evacuees out of the affected area to the reception center and identified ways in which to immediately clear impediments. They explained the use of radiological exposure control equipment, dos e rates, turn back rates, reading and reporting requirements and the use of KI. Officer's descriptions of procedures were consistent with plans and procedures and successfully demonstrated the ability to establish and manage TCPs.

For this capability the foll owing REP criteria were met: 1.a.1, 1.d.1, 1.e.1, 3.a.

1, 3.b.1, 3.d.1 and 3.d.2

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise30 3.2.3.3.3 Backup Route Alerting Emergency Public Information and Warning Capability Summary:

The Lee County EOC successfully demonstrated the Emergency Public Information and

Warning capability in support of BRA. County Fire Department Representatives were interviewed in the EOC regarding the pr ocedures. They were knowledgeable and familiar with the plans and procedures including dosimetry exposure and the use of KI.

Due to siren overlapping, any failed siren woul d be covered by another siren. To provide an alternative coverage to the overlapping of the siren, BRA is used to alert and notify the public. The Fire Representative/Chief desc ribed the procedures to be followed in conducting route alerting, including protective equipment, exposure limits, and recording requirements for personal dosimetry and the use of KI. A pre-script ed message is read and announced at appropriate intervals over a public address system while driving the designated routes. Continued routine traini ng, knowledge of the areas and pre-designated routes, aide the departments in being efficient which enables them to complete the activity across designated routes. The SOG states that a r oute should be run in about 45 minutes after a siren failure. The interview was consistent with plans and procedures.

BRA is authorized by the EMD. At the time of a siren failure, the Fire Representative/Chief will be tasked by th e EMD to run the Backup Routes. "There are no exception areas within the county".

For this capability the following REP criteria were met: 1.a.1, 3.a.1 and 5.a.3

3.2.3.4 Wake County, North Carolina

3.2.3.4.1 Emergency Operations Center Wake County Emergency Management personnel and EOC staff successfully demonstrated the capability to provide multi-agency coordination for incident management by activating and operating an EOC for a pre-planned event. This capability included EOC activation, notification, staffing, management , direction, control, and coordination of response ac tivities; coordination of efforts among neighboring governments at each level and among local, regional, and State EOCs and Federal Agencies; coordination of public information and warning; and maintenance of the information and communication necessary for coordinating response activities.

The Wake County Emergency Management (WCEM) Duty Officer effectively demonstrated the ability to perform incident notifications, recall essential personnel and stand-up EOC systems to provide a fully staffed and operational EOC in a timely manner. The EOC had adequate equipment and supplies for the staff to perform their duties.

WCEM demonstrated the ability to initiate interoperable communication system Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise31 operations, and to maintain, manage, and assure protection of the interoperable communications systems. Each agency locati on had a laptop and telephones. EOC staff members also communicated using personal and agency cell phones, facsimile, and over the Internet.

The EOC Manager exhibited good direction and control of the EOC Staff and in coordinating PADs with other counties and State agencies and in implementing the protective actions. The EOC Manager used a new tasking/checklist tied into the WebEOC system to effectively delegate acti ons to EOC agencies a nd coordinate actions with other counties. This new system allowed the EOC Manager to track action items and tasks while still maintaining overall control of the EOC. This was evident as the EOC Manager continually went to different agencies and talked with them concerning the actions they were taking and any support they needed to complete their tasks. Briefings were held at appropriate times and the EO C Manager polled all agencies to review actions that they had been working, to review plans and checklists for future actions and

to insure they were coordinating actions w ith other agencies. The EOC Manager and the EOC Staff displayed excellent coordination of actions and coordinating with agencies

outside of the EOC.

Wake County demonstrated the ability to manage radiological exposure to EWs through discussion and demonstration. The Radiological Emergency Preparedness (REP) Planner

and various county EOC staff demonstrated an excellent understanding of as low as reasonably achievable(ALARA), and their plans and procedures allow for an effective monitoring and recording of EWs radiation exposure levels. Wake County has KI in sufficient quantities for the general public and EWs. The county has appropriate instructions for issue, consumption and documentation of issue and consumption of KI both to the general public, institutionalized and EWs.

The special needs population was effectively managed during the exercise by the Wake County Department of Health, Wake County DSS and Wake County Emergency Medical Services. Resources to include transportation assets were adequate to handle the special needs population. The WCEM staff has a data base to track special needs personnel and facilities. School officials in the EOC discussed how they would manage moving school students and coordinate with all agencies.

For this capability the following REP criteria were met: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.b.2, 2.c.1, 3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1 and 3.d.2

Emergency Public Information and Warning Capability Summary:

The Wake County EOC Manager (Emergency Management Director), EOC staff and the PIOs successfully demonstrated the capability to develop, coordinate, and disseminate accurate alerts and emergency information to the media and the public prior to an impending emergency and activate warning systems to notify those most at-risk in the event of an emergency.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise32 The PIO prepared eight news releases, all of which were accurat e, properly approved by the EOC Manager and coordinated with the JIC. This coordination ensured accurate information would be provided that was consis tent with the current situation. The PIO consistently provided documentation to the EOC manager for review and approval prior to release to the JIC. The two Public Inquiry staff fiel ded ten telephone inquiries to answer public concerns with accurate and timely answers. There were no trends or rumors identified during the exercise.

WCEM EOC staff coordinated information re garding Public Prot ective Actions, siren activations and four EAS messages.

For this capability the following REP criteria were met: 5.a.1, 5.a.3, 5.b.1

3.2.3.4.2 Traffic Control Points

Public Safety and Security Response Capability Summary:

The Fuquay-Varina Police Department and Wake Sheriff's Office representatives demonstrated the ability to establish appropr iate TCPs. Upon declaration of a General Emergency at the HNP and the subsequent P AD, the Sheriff's Office deputies affectively coordinated the selection of TCPs with the Area Comma nd Post and Staging Area.

TCP personnel reported to the Fuquay- Varina staging area to obtain dosimetry kits and a dosimetry briefing. Dosimetry readings would be called in via radio to the Staging Area.

The Fuquay- Varina Police Officer representative stated that they and Wake County have adequate personnel and vehicles to man identified TCPs. If additional personnel were needed, he would request mutual aid from surrounding areas. Necessary equipment including trucks, barricades, etc from Public Works who would also transport barricades to TCP locations. Unmet needs would be requested from the Area Command Post.

For this capability the following REP criteria were met: 1.d.1, 1.e.1, 3.a.1, 3.b.1,

3. d.1 and 3.d.2

3.2.3.4.3 Backup Route Alerting

Emergency Public Information and Warning Capability Summary:

The Fuquay-Varina Police department and Wake County Sheriff Department demonstrated BRA and Notification. They had the ability and knowledge to conduct, coordinate and provide to the public information and warning in a timely manner.

During the exercise, the sirens were sounded at SAE and there was a failure of siren W26. Through interview, they explained the process of how they would inform the public and the routes they would take and message that would be play over the PA system. Once the notification is completed, they would provide feedback to the EOC. This activity would be completed in the 45 minutes time limited. Both the Fuquay-Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise33 Varina Police department and Wake County Sheriff Department indicated there were enough vehicles, public address equipment and personnel to adequately cover each individual route within the allotted 45 minutes. They were familiar with the 1 R administrative limit, the 5 R turnback limit, and 25 R lifesaving limit and they were aware of the significance of the limits. They also understood the use of potassium iodide (KI). Officers knew how to use dosimeters, when to take readings, and reporting procedures.

For this capability the following REP criteria were met: 3.a.1 and 5.a.3

3.2.3.4.4 Protective Actions for Schools

Emergency Public Information and Warning Capability Summary:

Fuquay-Varina High Schools ,Middle School and Elementary Schools in Wake county demonstrated during an interview in which the principals of an at-risk school and its host school; a representative of the County Schools System, and the county's emergency management agency participated. The in terview pointed out that there is close coordination between the agencies/schools and that the SOGs at each level are compatible and consistent. Processes which were discussed included training for staff and faculty; individual and co llective responsibilities; coordi nation with and notification of the parents; availability of resources to relocate students; and the variables that could affect the decision-making process by the sc hools superintendent. This aspect of the capability was sufficiently demonstrated to indicate the county and school system is prepared to safeguard students, staff and f aculty of at risk school s in the event of a nuclear incident at the HNP. For this capability the following REP criteri on was met: 3.c.2 3.2.3.4.5 Medical Services Drill Triage and Pre-Hospital Treatment Capability Summary:

The emergency response agencies of Wake Coun ty and the City of Ra leigh in partnership with Rex Hospital successfully demonstrated the ability to respond, transport, treat and decontaminated a radiological contaminated accident victim. The Raleigh Fire Department aided by their H azardous Materials (HazMat) Team responded to a simulated radiological accident scene. The HazMat team followed all applicable procedures by establishing a control line, then taking the correct measures for personal protection and indentifying the contamination. The Wake County EMS crew acted with a sense of urgency and provided the victim with initial medical care and transportation to the hospital.

The Hospital Emergency Department (ED) staff implemented a code BETA emergency and directed the Radiological Emergency Response Team (RERT) to quickly prepare the decontamination room and prepare the ED for the arrival of the patient. The RERT Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise34 frequently changed gloves after contact with the patient to help prevent any spread of contamination. They were periodically reminded to read their dosimetry and report any readings. The team worked well together, with each member understanding their roles. The priority of the victims injuries were c onsidered during the decontamination process.

The HAZMAT Team, EMS crew and Hospital Staff used appropriate medical care and contamination control. Sufficient quantities of supplies and equipment were available during the treatment and decontamination of the accident victim. All actions performed in this drill were in acco rdance with appropriate plans and procedures. The County agencies and private organizations supporting the HNP established that they were fully capable of effectively providing emergenc y response support to a radiologically contaminated patient.

For this capability the following REP criterion was met: 6.d.1 3.2.3.4.6 Reception and Congregate Care Center

Hazardous Materials Response and Decontamination and Mass Care (Sheltering, Feeding and Related Services) Capability Summary:

The Wake County RCCC had sufficient eq uipment to successfully support RCCC operations. EW's are very knowledgeable of the response process and reported in a timely fashion to receive EW equipment and required briefings. The RCCC Manager gave a good radiation safety briefing to all EW's covering pertinent information as well as exercise safety precautions. Six simulated evacuees were processed through the

RCCC in accordance with the EOPA. Two of the six simulated evacuees were deemed contaminated and successfully decontaminated in accordance with REP training and Wake County SOG's. The decontamination processes in the male and female restrooms was consistent and the high level of training very apparent in the EW's excellent performance. The overall layout and setup of the facility prov ided good control of potentially contaminated evacuees.

For this capability the following REP criteria were met: 1.a.1, 1.e.1, 3.a.1 and 6.a.1

Mass Care (Sheltering, Feeding and Related Services) Capability Summary:

The Wake County Department Health and Human Service (DHHS) demonstrated the ability of county staff to meet the congreg ate care needs of evacuees during a nuclear incident at the HNP. The DHHS employees a nd volunteers worked t ogether as a team and demonstrated shared responsibilities in meeting the n eeds of evacuees. It was evident that the DHHS as lead, and all s upporting county agencies (Schools, Sheriff, Police, Emergency Medical Services, Health, Mental Health and Animal Control) had coordinated establishing and managing a safe sh elter that could expand to meet the needs of evacuating citizens. Personnel participating in the demonstration were knowledgeable in their roles. Consideration to meet the medical and health needs of evacuees was Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 3: Analysis of Capabilities 2011 HNP REP Exercise35 demonstrated along with the availability of representatives conversant with other services that could assist evacuees. LE was available to provide security in a variety of manners - traffic control, and security of the sheltered. County Animal C ontrol is prepared to assist in the establishment a pet control facility if needed.

The demonstration at Garner High School met the requirements established for this capability

For this capability the following REP criterion was met: 6.c.1

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise 2011 HNP REP Exercise 36

This Page Is Intentionally Blank

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Section 4: Conclusion 2011 HNP REP Exercise 37 Section 4: Conclusion Officials and representatives from the State of North Carolina, Chatham, Harnett, Lee and Wake

Counties, the (NRC) Region II, and Progress Energy, as well as numerous volunteers participated in this exercise. The cooperation and teamwork of the participants was evident throughout all the phases of the exercise. The Federal Emergency Management Agency (FEMA) wishes to acknowledge the efforts and hard work of the many individuals w ho participated in the success of this exercise. FEMA would also like to acknowledge the enthusiasm and contributions of the exercise planning team dur ing the design of the exercise. The introduction of new products and concepts into the design phase of the exercise was embraced by the team, and they exhibited a high degree of eagerness to improve emergency management and response at all levels. Overall, State and local organizations demonstrated knowledge of their emergency response plans and procedures and successfully implemented them. Communications were identified as a general strength throughout the exercise. Not only was the equipment interoperable and functional, but the personnel utilizing it kept everyone well informed and helped to maintain situational awareness across the board. The evaluation team noted great progress in the coordination of activities between the State, counties, and all other response entities.

During this exercise, FEMA did not identify any Deficiencies or Area Requiring Corrective Actions (ARCA) was identified.

Appendix A contains the exercise timeline. The exercise timeline tabl e provides a summary of exercise results for all participating jurisdictions and functional entities.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise 2011 HNP REP Exercise 38

This Page Is Intentionally Blank Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix A: Exercise Timeline 2011 HNP REP Exercise 39 Appendix A: Exercise Timeline (Table 1)

DATE AND SITE: November 29, 2011 - Harris Nuclear Plant Emergency Classification Level or Event Time Utility Declared Time That Notification Was Received or Action Was Taken SERT/ SEOC RPS Dose Assessment Central Branch JIC Wake County Chatham County Harnett County Lee County Unusual Event N/A N/A N/A N/A N/A N/A N/A N/A N/A Alert 0752 0818 0812 0818 0806 0831 0816 0843 0815 Site Area Emergency 1040 1055 1050 1043 1046 1057 1052 1058 1050 General Emergency 1135 1151 1145 1140 1135 1145 1150 1147 1144 Simulated Radiation Release Started 1032 1055 1039 1105 1112 1057 1049 1053 1050 Simulated Radiation Release Ended Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Facility Declared Operational 0834 0844 0930 0855 0915 0900 0843 0906 0820 Exercise Terminated 1442 1443 1443 1442 1442 1442 1442 1442 1442 Declaration of State of Emergency Local N/O N/A 1140 N/A 1044 1117 1030 1110 State 1108 1130 1130 1125 N/O N/O 1125 1110 Early Precautionary Actions: Schools: 0958 0958 0900 0935 N/A 0910 N/A N/A Special Populations:

N/A N/A N/A N/A 1004 0915 1106 1145 Clear Lake Harris: 0945 0945 0945 0954 0945 0945 N/A 0945 1 st Protective Action Decision: Public Warning 1106 1106 1106 1120 1106 1106 1106 1106 1 st Siren Activation 1115 1115 1115 1115 1115 1115 1115 1115 1 st EAS Message (Stay Tuned) 1120 1120 1120 1120 1120 1120 1120 1120 1 st NWS Message (Stay Tuned) 1125 1125 1125 1125 1125 1125 1125 1125 2 nd Protective Action Decision: Evaluate Zones: A, B, C, D, E, F, G, H, K, L, N Shelter in Place Zones: I, J, M 1210 1210 1210 N/A 1210 1210 1210 1210 2 nd Siren Activation 1215 1215 1215 1215 1215 1215 1215 1215 2 nd EAS Message 1220 1220 1220 1220 1220 1220 1220 1220 2 nd NWS Message 1225 1225 1225 1225 1225 1225 1225 1225 3 rd Protective Action Decision: KI for public in all zones 1213 1213 1213 N/O 1213 1213 1213 1213 3 rd EAS Message 1230 1230 1230 1230 1230 1230 1230 1230 3 rd NWS Message 1235 1235 1235 1235 1235 1235 1235 1235 4 th Protective Action Decision: Evacuate Zones: A, B, C, D, E, F, G, H, K, L, N, M Shelter in Place Zones: I, J 1354 1354 1354 N/O 1354 1354 1354 1354 3 rd Siren Activation 1359 1359 1359 1359 1359 1359 1359 1359 4 th EAS Message 1404 1404 1404 1404 1404 1404 1404 1404 4 th NWS Message 1409 1409 1409 1409 1409 1409 1404 1404 KI Ingestion Decision

Emergency Workers 1111 1114 1111 1155 1112 1115 1106 1112 *N/A - Not Applicable
  • N/O - Not Observed Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise 2011 HNP REP Exercise 40

This Page Is Intentionally Blank Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix B: Exercise Evaluators and Assignments 2011 HNP REP Exercise 41 Appendix B: REP Criterion Evaluation Result Summary (Table 2)

DATE AND SITE: November 29, 2011 - Harris Nuclear Plant LEGEND: M = Met A = ARCA D = Deficiency

  • ARCA identified and corrected through remedial training and re-demonstration. ELEMENT/Sub-Element STATE SERT/ SEOC Dose Assess RPS Fixed Lab Central Branch Office JIC EOF Chatham County Harnett County Lee County Wake County 1. EMERGENCY OPERATIONS MANAGEMENT 1.a.1. Mobilization M M M M M M M M M M 1.b.1. Facilities M M 1.c.1. Direction and Control M M M M M M M M 1.d.1. Communications Equipment M M M M M M M M M 1.e.1. Equipment & Supplies to Support Operations M M M M M M M M M 2. PROTECTIVE ACTION DECISION MAKING 2.a.1. Emergency Worker Exposure Control M M M M M M 2.b.1. Rad Assessment & PARs Based on Available Information M M 2.b.2. Rad Assessment & PADs for the General Public M M M M M M 2.c.1. Protective Action Decisions for Special Populations 2.d.1. Rad Assessment & Decision Making for Ingestion Exposure 2.e.1. Rad Assessment & Decision Making for Relocation, Re-entry & Return 3. PROTECTIVE ACTION IMPLEMENTATION 3.a.1. Implementation of Emergency Worker Control M M M M M M 3.b.1. Implementation of KI Decisions M M M M M 3.c.1. Implementation of PADs for Special Populations M M M M 3.c.2. Implementation of PADs for Schools M 3.d.1. Implementation of Traffic & Access Control M M M M 3.d.2. Impediments to Evacuation & Traffic & Access Control M M M M 3.e.1. Implementation of Ingestion Decisions Using Adequate Info 3.e.2. Implementation of IP Decisions Showing Strategies & Instr. Materials 3.f.1. Implementation of Relocation, Re-entry & Return Decisions 4. FIELD MEASUREMENT & ANALYSIS 4.a.1. Plume Phase Field Measurement & Analysis Equipment 4.a.2. Plume Phase Field Measurement & Analysis Management 4.a.3. Plume Phase Field Measurements & Analysis Procedures 4.b.1. Post Plume Field Measurement & Analysis 4.c.1. Laboratory Operations M 5. EMERGENCY NOTIFICATION & PUBLIC INFO 5.a.1. Activation of Prompt Alert & Notification M M M M M 5.a.2. Activation of Prompt Alert & Notification 15-Minute (Fast Breaker) 5.a.3. Activation of Prompt Alert & Notification Backup Alert & Notification M M M M 5.b.1. Emergency Info & Instructions for the Public & the Media M M 6. SUPPORT OPERATIONS/FACILITIES 6.a.1. Monitoring & Decon of Evacuees & EWs & Registration of Evacuees M M 6.b.1. Monitoring & Decon of Emergency Worker Equipment M 6.c.1. Temporary Care of Evacuees M M 6.d.1. Transport & Treatment of Contaminated Injured Individuals M Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise 2011 HNP REP Exercise 42

This Page Is Intentionally Blank Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix C: Exercise Evaluators and Assignments 2011 HNP REP Exercise 43 Appendix C: Exercise E valuators and Assignments Location Evaluation Team Capability and Activity North Carolina Joint Operations Emergency Operations Facility (EOF) Bob Trojanowski (NRC) Capability: EOC Management Activity 1: Support and Coordinate Response Joint Information Center (JIC)

Robert Spencer (FEMA)

JT Ackerman (FEMA) Capability: Emergency Public Information and Warning Activity 1: Activate Emergency Public Information, Alert/Warning, and Notification Plans

2. Capability: Emergency Public Information and Warning Activity 2: Manage Emergency Public Information and Warnings Observer Kevin Keyes (FEMA) None State Emergency Operations Center (SEOC)

John Fill (FEMA)

Ron Shaw (FEMA)

Jon Sandberg (FEMA) 1. Capability: EOC Management Activity 1: Activate EOC Activity 2: Provide EOC Connectivity Activity 3: Direct EOC Operations 2. Capability: Emergency Public Information and Warning Activity 1: Issue Emergency Warnings Activity 2: Provide Public Inquiry Control NCEM, Central Branch Office Bill Larrabee (ICF) Capability: EOC Management Activity 1: Activate EOC Activity 2: Provide EOC Connectivity Activity 3: Direct EOC Operations Fixed Laboratory Reggie Rogers (ICF) Capability: Direct Public Health Laboratory Testing Activity 1: Site Management and Control Dose Assessment Reggie Rogers (ICF) Capability: Hazardous Materials Response & Decontamination Activity 1: Site Management and Control Activity 2: Hazard Assessment & Risk Evaluation FMT Management Alan Bevan (ICF) Capability: Hazardous Materials Response & Decontamination Activity 1: Site Management and Control Activity 2: Hazard Assessment & Risk Evaluation Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix C: Exercise Evaluators and Assignments 2011 HNP REP Exercise 44 Location Evaluation Team Capability and Activity FMT Operations (Red Team and Blue Team)

Jill Leatherman (ICF) Keith Earnshaw (ICF) Capability: Hazardous Materials Response & Decontamination Activity 1: Site Management and Control Activity 2: Hazard Assessment & Risk Evaluation RISK COUNTIES Chatham County /Director: Mr. Tony Tucker Emergency Operations Center (EOC) Alex Sera (FEMA) Gary Bolender (ICF) 1. Capability: EOC Management Activity 1: Activate EOC Activity 2: Provide EOC Connectivity Activity 3: Direct EOC Operations Activity 4: Support and Coordinate Response 2. Capability: Emergency Public Information and Warning Activity 1: Issue Emergency Warnings Activity 2: Provide Public Inquiry Control Traffic Control Points (TCP)

Gary Bolender (ICF) Capability: Public Safety and Security Response Activity 1: Activate Public Safety and Security Response Activity 2: Command and Control Public Safety and Security Response Operations Activity 3: Control Traffic, Crowd, and Scene Backup Route Alerting Gary Bolender (ICF) Capability: Emergency Public Information and Warning Activity 1: Manage Emergency Public Information and Warnings Activity 2: Issue Public Information, Alerts/Warnings, and Notifications Emergency Worker and Vehicle Monitoring and Decontamination (OOS- 7:00 a.m. on Oct 11 at Pittsboro Fire Dept Robert Nash (FEMA) Gerald McLemore (FEMA) Capability: Hazardous Materials Response & Decontamination Activity 1: Site Management and Control Decontamination and Clean-Up/Recovery Operations Reception and Congregate Care Center (OOS- 7:00 p.m. on Oct 13 at Northwood High School Chatham County)

Robert Nash (FEMA) Gerald Mclemore (FEMA) Robert Spence (FEMA)

Odis Spencer (FEMA) 1. Capability: Hazardous Materials Response & Decontamination Activity 1: Site Management and Control Activity 2: Decontamination and Clean-Up/Recovery Operations Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix C: Exercise Evaluators and Assignments 2011 HNP REP Exercise 45 Location Evaluation Team Capability and Activity

2. Capability: Mass Care (Sheltering, Feeding, and Related Services) Activity 1: Establish Shelter Operations Harnett County/Director: Mr. Gary Pope Emergency Operations Center (EOC) Gerald Mclemore (FEMA) Lisa Rink(FEMA) Quintin Ivy (FEMA) 1. Capability: EOC Management Activity 1: Activate EOC Activity 2: Provide EOC Connectivity Activity 3: Direct EOC Operations Activity 4: Support and Coordinate Response 2. Capability: Emergency Public Information and Warning Activity 1: Issue Emergency Warnings Activity 2: Provide Public Inquiry Control Traffic Control Points Quintin Ivy (FEMA) Capability: Public Safety and Security Response Activity 1: Activate Public Safety and Security Response Activity 2: Command and Control Public Safety and Security Response Operations Activity 3: Control Traffic, Crowd, and Scene Backup Route Alerting

Quintin Ivy (FEMA) Capability: Emergency Public Information and Warning Activity 1: Manage Emergency Public Information and Warnings Activity 2: Issue Public Information, Alerts/Warnings, and Notifications Lee County/Director: Mr. Shane Seagroves Emergency Operations Center (EOC) Odis Spencer (FEMA)

Lorenzo Lewis(FEMA) Roy Smith(ICF) 1. Capability: EOC Management Activity 1: Activate EOC Activity 2: Provide EOC Connectivity Activity 3: Direct EOC Operations Activity 4: Support and Coordinate Response 2. Capability: Emergency Public Information and Warning Activity 1: Issue Emergency Warnings Activity 2: Provide Public Inquiry Control Traffic Control Points

Lorenzo Lewis(FEMA) Capability: Public Safety and Security Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix C: Exercise Evaluators and Assignments 2011 HNP REP Exercise 46 Location Evaluation Team Capability and Activity Response Activity 1: Activate Public Safety and Security Response Activity 2: Command and Control Public Safety and Security Response Operations Activity 3: Control Traffic, Crowd, and Scene Backup Route Alerting Lorenzo Lewis(FEMA) Capability: Emergency Public Information and Warning Activity 1: Manage Emergency Public Information and Warnings Activity 2: Issue Public Information, Alerts/Warnings, and Notifications Wake County/Director: Mr. Joshua Creighton Emergency Operations Center (EOC)

Joe Harworth(FEMA)

Mike Dolder(FEMA) 1. Capability: EOC Management Activity 1: Activate EOC Activity 2: Provide EOC Connectivity Activity 3: Direct EOC Operations Activity 4: Support and Coordinate Response 2. Capability: Emergency Public Information and Warning Activity 1: Issue Emergency Warnings Activity 2: Provide Public Inquiry Control Traffic Control Points

Robert Nash (FEMA) Capability: Public Safety and Security Response Activity 1: Activate Public Safety and Security Response Activity 2: Command and Control Public Safety and Security Response Operations Activity 3: Control Traffic, Crowd, and Scene Backup Route Alerting Robert Nash(FEMA) Capability: Emergency Public Information and Warning Activity 1: Manage Emergency Public Information and Warnings Activity 2: Issue Public Information, Alerts/Warnings, and Notifications Protective Actions for Schools

Robert Spence (FEMA)

JT Ackerman (FEMA) Robert Nash (FEMA) Capability: Citizen Evacuation & Shelter in Place Activity 1: Direct Evacuation and/or In-Place Protection Operation Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix C: Exercise Evaluators and Assignments 2011 HNP REP Exercise 47 Location Evaluation Team Capability and Activity Medical Services Drill (OOS- 9:00 a.m. on Oct 12 Odis Spencer (FEMA) Robert Spence (FEMA) Capability: Triage and Pre-Hospital Treatment Activity 1: Activate Triage and Pre-Hospital Treatment Activity 2: Direct Triage and Pre-Hospital Treatment Activity 3: Provide Treatment Reception & Congregate Care (Out of sequence) October 26,2011 8:00 pm Robert Nash (FEMA) Gerald Mclemore (FEMA) 1.Capability: Hazardous Materials Response & Decontamination Activity 1: Site Management and Control Activity 2: Decontamination and Clean-Up/Recovery Operations 2.Capability: Mass Care (Sheltering, Feeding, and Related Services)

Activity 1: Establish Shelter Operations

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise 2011 HNP REP Exercise 48

This Page Is Intentionally Blank Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 49 Appendix D: Extent of Play Agreement Harris Nuclear Power Plant Exercise 2011 Extent of Play Agreement A. General Information

  • Activities will begin at approximately 7:30 a.m. on Tuesday, November 29, 2011, and will conclude when all objectives have been met.
  • Sirens will be activated at the Wake County EOC using a "Silent" test. This will occur at the Site Area Emergency and simulated at the General Emergency
  • State and county participants may NOT be pre-positioned at exercise locations.
  • Utility will provide a liaison to State EOC, Chatham, Harnett, Lee, & Wake County EOCs
  • A state or county escort will accompany Federal Evaluators to out-of-sequence demonstrations.
  • A State Controller will be located in the State EOC, Chatham County EOC, Harnett County EOC, Lee County EOC, Wake County EOC and the JIC.
  • Federal Evaluators and a State Controller will be located in each of the EPZ counties.
  • Exercise participants will have the opportunity to remediate and re-demonstrate exercise criterion immediately upon identifyi ng any error/s with the approval of the federal evaluator.
  • The Joint Information Center and Emergenc y Operation Centers will be allowed to set-up equipment prior to the start of the exercise.
  • Due to the scenario time compression, the Joint Information Center participants can respond to the facility, once notified, per the following timeline:

State and Wake County participants: Real Time Chatham, Harnett and Lee County participants: 30-minute delay

  • All demonstrations will be in accordance with the approved Extent of Play Agreement.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 50 B. Scenario

  • Scenario was developed by the Utility in consultation with th e State using FEMA guidelines.
  • At least one wind shift has been built into the scenario for the PAD making process.
  • A communication failure will be discu ssed at the County and State EOCs.
  • Evaluation Area 4 - Field Measurement and Analysis activity at the Mobile Lab and Field Monitoring Team s is for Training only.

C. Meeting Times I. Federal Evaluator Briefing:

Harris Plant Energy and Environmental Center, HEEC Auditorium A New Hill-Holleman Road (SR 1127)

New Hill, North Carolina

Date & Time: 2:00 p.m., Monday, November 28, 2011 II. State & County Internal Critique:

Harris Plant Energy and Environmental Center, HEEC Auditorium A New Hill-Holleman Road (SR 1127)

New Hill, North Carolina Date & Time: 1:00 p.m., Wednesday, November 30, 2011

This meeting will only take place if needed.

III. Participant's Out Briefing:

Harris Plant Energy and Environmental Center, HEEC Auditorium A New Hill-Holleman Road (SR 1127)

New Hill, North Carolina

Date & Time: 10:00 a.m. Thursday, December 1, 2011

IV. Public Briefing:

Harris Plant Energy and Environmental Center, HEEC Auditorium A New Hill-Holleman Road (SR 1127)

New Hill, North Carolina

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 51 Date & Time: 11:00 a.m. Thursday, December 1, 2011

1. EMERGENCY OPERATIONS MANAGEMENT
1. a. - Mobilization

Criterion 1.a.1 OROs will use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner.

(NUREG-0654, A.4.,D.3.,4., E.1.,2., H.4.)

EXTENT OF PLAY:

Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties

  • State and local response personnel may not be pre-positioned.
  • Notification rosters will be available to FEMA evaluators upon request. Emergency management personnel will discuss alert notification procedures with the evaluator.
1. b. - Facilities

Criterion 1.b.1

Facilities are sufficient to support the Emergency Response.

(NUREG-0654, H.)

EXTENT OF PLAY:

Participants: NCSEOC, Chatham, Harnett, Lee & Wake Counties

  • State, Chatham and Wake Counties EOC facilities baseline for this exercise evaluation criterion was established in 2002.
  • Lee County EOC's baseline was established in 2009.
  • Harnett County EOC is a new facility and requires evaluation of facility and support system adequacy.
1. c - Direction and Control:

Criterion 1.c.1:

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 52 Key personnel with leadership roles for the ORO provide Direction and Control to that part of the overall response effort for which they are responsible.

(NUREG-0654, A.1.d.,2.a.,b.)

EXTENT OF PLAY:

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties Wake County will be the lead-coordinating county for the Harris Counties until Site Area Emergency. Following the "Silent Test

" sounding of sirens and issuance of the first PAD recommendations to the public, Wake County will request the State assume direction and control. 1.d - Communications Equipment:

Criterion 1.d.1:

At least two communication systems are available and operate properly, and communication links are established with appropriate locations. Communications capabilities are managed in s upport of emergency operations. (NUREG-0654, F.1,2.)

Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties

  • Communication breakdown/failures will be discussed with the federal evaluators during the exercise at state and county EOCs unless an actual loss of communication occurs and the back-up process identified is operational.
  • WebEOC is the crisis communication system for the State EOC.

1.e - Equipment and Supplies to Support Operation:

Criterion 1.e.1:

Equipment, maps, displays, dosimeters, potassium iodide (KI) and other supplies

are sufficient to support emergency operations.

(NUREG-0654, H., J.10.a.b.e.f.j.k., 11, K.3.a.)

Participants: Chatham, Harnett, Lee & Wake Counties

  • Availability and currency of emergency worker KI will be verified by a FEMA Staff Assistance Visit to the EPZ Counties prior to or during the exercise.
  • Dosimeters will be inspected by FEMA during the Staff Assistance Visit to the EPZ Counties prior to or during the exercise.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 53 Chatham County:

  • Staff Assistance Visit will take place off-scenario, July 26, 2011 at 1:00 p.m., at the Chatham County EOC, located at 297 West St. Pittsboro, NC.

Harnett County:

  • Staff Assistance Visit will take place off-scenario, on July 27, 2011 at 9:00 a.m. at the Harnett County EOC, 1005 Edwards Drive, Lillington, NC Lee County:
  • Staff Assistance Visit will take place off-scenario, July 28, 2011 at 1:00 p.m. at the Lee County Emergency Management Offices at, 225 Steele Street, Sanford, NC 27330 Wake County:
  • Staff Assistance Visit will take place off-scenario, July 25, 2011 at 2:00 p.m. at the Wake County Emergency Management Offices at 331 S. McDowell Street, Raleigh, NC., 27601
2. PROTECTIVE ACTION DECISION MAKING

2.a - Emergency Worker Exposure Control:

Criterion 2.a.1:

OROs use a decision making process, considering relevant factors and appropriate

coordination, to insure that an exposure cont rol system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

(NUREG-0654, K.4).

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 54 EXTENT OF PLAY

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
  • No distribution of actual or simulated KI will be accomplished during the exercise.
2. b - Radiological assessment and protective action recommendations and Decisions for the Plume Phase of the Emergency:

Criterion 2.b.1:

Appropriate protective acti on recommendations are based on available information on plant conditions, field-monitoring dat a, and licensee and ORO dose projections, as well as knowledge of on-site and off-site environmental conditions.

(NUREG-0654, I.8.,10.,11. & Supplement 3.)

EXTENT OF PLAY:

  • Participants:

NC SERT

  • Radiation Protection will establish an independent dose assessment and projection team at the State EOC. This team will communicate with the Utility EOF, State Mobile Lab and deployed field survey teams to obtain data for developing dose projections.
  • Back-up dose assessment will be demonstrated at State EOC.

Criterion 2.b.2:

A decision-making process involving consideration of appropriate factors and necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).

(NUREG-0654, J.9.,10.m.)

EXTENT OF PLAY:

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
  • Radiation Protection and Public Health will analyze technical data and make recommendations to SERT Leader who in turn will make recommendations to the County EM Coordinators and Public Health Directors.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 55

  • Weather data will be pre-determined and will include a wind shift during the exercise in order to demonstrate OROs capability to adapt to changes requiring protective actions.
  • Evaluated counties will participate in the decision making process for PADs.
  • Demonstration of KI distribution for the General Public will be accomplished during Off-Scenario activity by local Public H ealth officials through discussion and with presentation of distribution documentation to the Federal Evaluator. (Demonstration will be during the Staff Assistance Visits.)

2.c - Protective Action Decisions fo r Protection of Special Populations:

Criterion 2.c.1:

Protective action decisions are made, as a ppropriate, for special population groups.

(NUREG-0654, J.9.,10.c.d.e.g.)

  • Participants: Chatham, Harnett, Lee & Wake Counties
  • Counties will demonstrate their procedures through discussion with the Federal Evaluator, by using a special populations list.
  • Distribution of KI to institutionalized individuals, who cannot be evacuated, will be discussed with the Federal Evaluator.
3. PROTECTIVE ACTION IMPLEMENTATION

3.a - Implementation of Emergency Worker Exposure Control:

Criterion 3.a.1:

The OROs issue appropriate dosimeters a nd procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on th e appropriate exposure record or chart.

(NUREG-0654, K.3.)

EXTENT OF PLAY:

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
  • Chatham, Lee, Harnett and Wake Counties will demonstrate their process during out-of-sequence activities.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 56

  • Radiation Protection will provi de technical advice and assistance to the state and counties.

3.b - Implementation of KI Decision:

Criterion 3.b.1:

KI and appropriate instructions are available should a decision to recommend Use of KI be made. Appropriate record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained.

(NUREG-0654, E.7., J.10. e, f.)

EXTENT OF PLAY:

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
  • Demonstration of KI will be through "Discussion Only" at State and County EOCs.
  • No distribution of actual or simulated KI will be accomplished during the exercise.
  • Demonstration of KI distribution for the General Public will be accomplished during Off-Scenario activity by local Public H ealth officials through discussion and with presentation of distribution documentation to the Federal Evaluator. (Demonstration will be during the Staff Assistance Visit.)

3.c - Implementation of Protective Actions for Special Populations.

Criterion 3.c.1:

Protective action decisions are implemented for special population groups within areas subject to protective actions.

(NUREG-0654, E.7.,J.9.,10.c.d.e.g.)

EXTENT OF PLAY:

  • Participants: Chatham, Harnett, Lee & Wake Counties
  • A current list of Special Needs Populations will be provided to the Federal Evaluator for review.
  • Evacuation/relocation requirements will be demonstrated through discussions at the EOCs, based on the scenario a nd county implementation procedures.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 57

  • Distribution of KI to institutionalized individuals, who cannot be evacuated, will be discussed with the Federal Evaluator.
  • Contact via telephone with special population groups for PADs and transportation resources will be simulated.

Criterion 3.c.2:

OROs/School officials decide upon and implement protective actions for schools. (NUREG-0654, J.10.c.,d.,g.)

EXTENT OF PLAY:

  • Participants: Wake County
  • School evacuation procedures and interviews will be demonstrated via discussion with key school staff members, including school bus drivers, off scenario at a Fuquay Varina High School.
  • Law enforcement agencies will discuss school bus escort procedures during their traffic and access control interviews as described in 3.d.

Wake Schools for evaluation include:

Fuquay-Varina Senior High School

Fuquay-Varina Middle School Lincoln Heights Elementary School Herbert Aikens Elementary School

Location:

Fuquay-Varina Senior High School

201 Bengal Drive

Fuquay-Varina, NC 27526

Time: Off-Scenario, March 21, 2011 at 3:45 a.m.

Chatham County Chatham County will demonstrate Moncure Elementary School in 2013; it was last demonstrated in 2009.

3.d - Implementation of Traffic and Access Control.

Criterion 3.d.1:

Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 58 (NUREG-0654, J.10.g, j, k.)

EXTENT OF PLAY:

Participants: SERT, Chatham, Harnett, Lee & Wake Counties

  • Traffic control points will be discussed with the Federal Evaluator at each County EOC. Law enforcement personnel will discuss proper procedures, equipment and turn back values. At least one agency representative will be available for interview.
  • When State is in direction & control the SERT Leader will determine appropriate access control measures to restrict access to contaminated areas.

Chatham County representatives available for interview include:

NC State Highway Patrol Time: On-scenario, November 29, 2011 Harnett County Representatives available for interview include:

NC State Highway Patrol Harnett County Sheriff's Department (Back-up)

Time: On-scenario, November 29, 2011 Lee County Representatives available for interview include:

Lee County Sheriff's Office State Highway Patrol Time: On-scenario, November 29, 2011

Wake County Representatives available for interview include:

Wake County Sheriff's Office Time: On-scenario, November 29, 2011

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 59 Criterion 3.d.2:

Impediments to evacuation are identified and resolved

(NUREG-0654, J.10.,j.,k.)

EXTENT OF PLAY:

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
  • During the interview process, as schedul ed in 3.d.1 above, officers will identify impediments to evacuation based on a simulated set of circumstances and questions posed by the federal evaluator.
4. FIELD MEASUREMENT AND ANALYSIS 4.a - Plume Phase Field Measurement & Analysis Criterion 4.a.1:

The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates. (NUREG-0654, H.10, I.8., 9.,11.)

EXTENT OF PLAY

  • Participants:

NC SERT, Radiation Protection

  • Radiation Protection will demonstrate this criterion using two field survey teams.
  • This criterion will be demonstrated for "Training Only" as part of the joint federal/state partnership agreement.

Criterion 4.a.2:

Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure.

(NUREG-0654, I.8., 11., J.10.a).

EXTENT OF PLAY:

  • Participants:

NC SERT, Radiation Protection

  • Radiation Protection will demonstrate this criterion using two field survey teams.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 60

  • This criterion will be demonstrated for "Training Only" as part of the joint federal/state partnership agreement.

Criterion 4.a.3:

Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples a re collected. Teams must move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivit y has been collected on the sampling media.

(NUREG-0654, I.8., 9., 11.)

EXTENT OF PLAY:

  • Participants:

NC SERT, Radiation Protection

  • Radiation Protection will demonstrate this criterion using two field survey teams.
  • This criterion will be demonstrated for "Training Only" as part of the joint federal/state partnership agreement.
4. c - Laboratory Operations

Criterion 4.c:

The laboratory is capable of performing required radiological analyses to support protective action decisions.

(NUREG-0654, C.3,I.8.,9.,J.11)

EXTENT OF PLAY:

Participants: NC Radiation Protection Fixed Laboratory

5. EMERGENCY NOTIFICATION AND PUBLIC INFORMATION 5.a - Activation of the Prompt Alert and Notification System:

Criterion 5.a.1:

Activities associated with primary alert ing and notification of the public are completed in a timely manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include: (1) identification of the State or local government organization and the official with the authority for providing the Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 61 alert signal and instructional message; (2) identification of the commercial nuclear power plant and a statement that an emergency situation exists at the plant; (3) reference to REP-specific emergency information (e.g., brochures and information in telephone books) for use by the gen eral public during an emergency; and (4) a closing statement asking the affected and potentially affected population to stay tuned for additional information.

(NUREG 10 CFR Part 50, Appendix E & NUREG-0654, E.1.,4.,5.,6.,7)

EXTENT OF PLAY:

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
  • At Site Area Emergency North Carolina's c ounties will be in Direction and Control.

Following the sounding of the sirens (using the "silent test")

and the first PAD recommendations to the public, Wake County will request the state to take over direction and control.

  • Wake County will be the "Lead County" and will coordinate the simulated siren activation. An actual silent test will be conducted to simula te the sounding of sirens. In the event of a siren failure, procedures to address siren failures will be discussed with federal evaluators.
  • EAS messages will be in accordance with Part 11 of FCC Rules and Regulations, previously approved for North Carolina by FEMA.
  • PAD messages and news releases will be coordinated by the state and counties.

Criterion 5.a.3:

Activities associated with FEMA approved exception areas (where applicable) are completed within 45 minutes following the initial decision by authorized offsite

emergency officials to notify the public of an emergency situation. Backup alert and notification of the public is completed within 45 minutes following the detection by the ORO of a failure of the primar y alert and notification system.

(NUREG-0654, E.6., Appendix 3.B.2.c.)

EXTENT OF PLAY:

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
  • An actual silent test will be conducted. A feedback sheet will show if a siren has failed and if backup route alerting around the failed siren would be necessary.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 62

  • If a siren is deemed to have failed, back-up alerting will be discussed with the federal evaluator for a pre-determined zone (siren failure simulated).
  • Waterway Warning will be accomplished through a demonstration of Jordan Lake, Harris Lake, Cape Fear River, Haw River and Deep River at Jordan Lake (Off-scenario.) NC Wildlife, NC Park Service, State Highway Patrol Aviation and US Army Corps of Engineers will have required number of boats available to complete the waterway warning in the time requirement. At least one boat will be available to take federal evaluator out on the lake if requested. If bad weather occurs during this time, a discussion will occur with federal evaluators and above

agencies.

  • Depending on resource, allocation/weather conditions the SHP, aviation support may not be available. Discussion will be used in lieu of demonstration.
  • The River/Trail area Warning portion in Harnett County will be in discussion format during the off-scenario activi ties for back-up route alerting. Harnett County is the back up to the State Highway Patrol aviation.
  • Wake County will demonstrate this criteria via discussion at the Fuquay Staging Area, at the appropriate time in the scen ario. An actual running of the route will not occur.

5.b - Emergency Information and Instructions for the Public and the Media

Criterion 5.b.1:

OROs provide accurate emergency informat ion and instructions to the public and the news media in a timely manner.

(NUREG-0654, E.5.,7., G.3.a., G.4.a.,b.,c.)

EXTENT OF PLAY:

  • Participants: NC SERT, Chatham, Harnett, Lee & Wake Counties
  • PIOs or designated staff will receive rumor control calls at the JIC once it is activated. Approximately six calls per hour will be made to each state and county Lead PIO or designee represented at the JIC.
  • Counties will receive two calls per hour prior to the activation of the JIC and will prepare "one" news release. News releases shall come from the counties prior to JIC activation.
  • Once JIC is operational, two trends will be identified and appropriate actions taken to address them.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 63

  • State will relocate the news writers to the SEOC. This is a physical re-assignment of people, but does not change the duties or coordination. This will be demonstrated for Training Only.
6. SUPPORT OPERATION/FACILITIES 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees

Criterion 6.a.1:

The reception center/emergency worker facility has adequate space, resources and trained personnel to provide monitorin g, decontamination and registration of emergency workers and evacuees.

(NUREG-0654, J.10.h; K.5.b.)

EXTENT OF PLAY:

  • Participants: Chatham and Wake Counties
  • Six evacuees will be monitored; two (1 male and 1 female

) will be found to be contaminated.

  • Evacuee decontamination procedures will be via discussion and walk through of facilities (No actual or simulated decontamination of evacuees)
  • Two emergency workers per county will be monitored.
  • Emergency Worker decontamination procedures will be via discussion and walk through of facilities (No actual decontamination of workers

).

  • One emergency vehicle per county will be decontaminated (simulated using water)

Chatham County:

Public Reception Center, Monitoring and Decontamination:

Northwood High School

310 Northwood High School Road Pittsboro, NC 27312

919/542-4181

Attention: SAME FACILITY; NEW INSIDE SETUP Date & Time: Off-scenario , October 13, 2011 at 7:00 p.m. Emergency Worker and Vehicle Decontamination: Pittsboro Fire Department will demonstrate at:

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 64 Attention: NEW FACILITY Old Graham Road Fire Station 4170 Old Graham Road Pittsboro, NC 27312 919/542-1103 Date & Time: Off-scenario , October 11-13, 2011 at 7:00 p.m

.

For training purposes only previously demonstrated for evaluation was April 2007; will demonstrate for evaluation in 2013.

Public Reception Center:

Garner Magnet High School 2101 Spring Drive

Garner, NC 27529 Date & Time: Off-scenario, October 26, 2011 at 8:00 p.m.

Public Vehicle Decontamination/Isolation Garner Magnet High School 2101 Spring Drive

Garner, NC 27529 Date & Time: Off-scenario, October 26, 2011 at 8:00 p.m.

6.b - Monitoring and Decontamination of Emergency Worker Equipment:

Criterion 6.b.1:

The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment including vehicles.

(NUREG-0654, K.5.b.)

EXTENT OF PLAY:

Participants: Chatham, Harnett, Lee & Wake County.

  • One vehicle will be monitored and decontaminated (simulated) at each of the following times and locations. If inclement weather occurs a discussion will be performed by the evaluat or and the participants:

Chatham County:

Pittsboro Fire Department will demonstrate at:

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 65 Attention: NEW FACILITY Old Graham Road Fire Station 4170 Old Graham Road Pittsboro, NC 27312 919/542-1103 Date & Time: Off-scenario, October 11, 2011 at 7:00 p.m.

For training purposes only previously demonstrated for evaluation was April 2007; will demonstrate for evaluation in 2013.

6.c - Temporary Care of Evacuees:

Criterion 6.c.1:

Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross

planning guidelines. Managers demonstrate the procedures to assure that evacuees have been monitored for contaminatio n and have been decontaminated as appropriate prior to entering congregate care facilities.

(NUREG-0654, J.10.h.,12.)

EXTENT OF PLAY:

  • Participants: Chatham and Wake Counties Six individuals per monitoring site will be demonstrated.

The shelter portion of the congregate care facilities may demons trate setup of the facility by using a "sampler" approach to the repetitive setup requirements. Examples would include such things as co ts, bedding, chairs, etc.

Chatham County:

DSS, Public Health and American Red Cross will demonstrate at:

Northwood High School

310 Northwood High School Road Pittsboro, NC 27312

919/542-4181 Date & Time: Off-scenario, October 13, 2011 at 7:00 p.m.

Wake County:

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix D: Extent of Play Agreement 2011 HNP REP Exercise 66 Wake County Human Services will demonstrate at

Garner Magnet High School

2101 Spring Drive

Garner, NC 27529 Date & Time: Off-scenario, October 26, 2011 at 8:00 p.m.

6.d - Transportation and Treatment of Contaminated Injured Individuals:

Criterion 6.d.1:

The facility/ORO has the appropriate space, adequate resources and trained

personnel to provide transport, monitori ng, decontamination and medical services to contaminated injured individuals. (NUREG-0654, F.2., H.10., K.5.a.,b., L.1.,4.)

EXTENT OF PLAY:

Rex Hospital will demonstrate this activity October 12, 2011.

Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix E: Acronyms 2011 HNP REP Exercise 67 Appendix E: Acronyms Acronym Meaning AAC After Action Conference AAR After Action Report ARC American Red Cross ARCA Area Requiring Corrective Action ARES Amateur Radio Emergency Services CFR Code of Federal Regulations CMC Corporate Media Center DEMD Deputy Emergency Management Director DHS Department of Homeland Security DENR Department of Environmental Natural Resources DOC Department of Commerce DOE Department of Energy DOI Department of the Interior DOT Department of Transportation DPH Department of Public Health DRD Direct Reading Dosimeter DSS Department of Social Services EAL Emergency Action Level EAS Emergency Alert System ECL Emergency Classification Level EEG Exercise Evaluation Guide EMA Emergency Management Agency EMD Emergency Management Director EMNET Emergency Management Information Tracking System EMS Emergency Medical Services EOC Emergency Operations Center EOF Emergency Operations Facility EOPA Extent of Play Agreement EPA Environmental Protection Agency EPIP Emergency Plan Implementing Procedure EPZ Emergency Planning Zone ER Emergency Room ERC Emergency Response Coordinator Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix E: Acronyms 2011 HNP REP Exercise 68 ERDS Emergency Response Data System ERP Emergency Response Plan ESF Emergency Support Function EW Emergency Worker EWD Emergency Worker Decontamination EXPLAN Exercise Plan FEMA Federal Emergency Management Agency FEOC Forward Emergency Operations Center FMT Field Monitoring Team FOUO For Official Use Only FRMAC Federal Radiological Monitoring and Assessment Center GE General Emergency GIS Geographic Information System GM Geiger-Muller (detector) GPS Geographic Positioning System HAZMAT Hazardous Materials HNP Harris Nuclear Plant HO Health Order HQ Headquarters HSEEP Homeland Security Exercise and Evaluation Program IC Incident Commander ICS Incident Command System IMT Incident Management Team IP Improvement Plan IPZ Ingestion Pathway Zone IRG Information Response Group IRIS Internet Routed Information System JIC Joint Information Center KI Potassium Iodide LP-1 Local Primary -1 MNS McGuire Nuclear Station MOC Mobile Operations Center MOU Memorandum of Understanding mR milliroentgen mR/h milliroentgen per hour Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix E: Acronyms 2011 HNP REP Exercise 69 NAWAS National Warning System NC North Carolina NCEM North Carolina Emergency Management NCMP North Carolina Marine Patrol NCWRC North Carolina Wildlife Resources Commission NGO Non-Governmental Organization NHCEM New Hanover County Emergency Management NIMS National Incident Management System NOUE Notification of Unusual Event NPP Nuclear Power Plant NRC Nuclear Regulatory Commission NUREG-0654 NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness

in Support of Nuclear Power Plants," November

1980 NWS National Weather Service OOS Out-of-Sequence ORO Offsite Response Organization PA Public Announcement PAD Protective Action Decision PAG Protective Action Guide PAR Protective Action Recommendation PIO Public Information Officer PPE Personal Protective Equipment PRD Permanent Record Dosimetry R Roentgen R/h Roentgen(s) per hour RAC Regional Assistance Committee RACES Radio Amateur Civil Emergency Service REA Radioactive Emergency Area REM Roentgen Equivalent Man REMO Radiation Emergency Management Organization REP Radiological Emergency Preparedness REPP Radiological Emergency Preparedness Program RERP Radiological Emergency Response Plan RO Radiological Officer Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise Appendix E: Acronyms 2011 HNP REP Exercise 70 SAE Site Area Emergency SEOC State Emergency Operations Center SHP State Highway Patrol SIMCELL Simulation Cell SIP Shelter-in-Place SMRAP Southern Mutual Radiological Assistance Plan SOG Standard Operating Guide SOP Standard Operating Procedure SRD Self-Reading Dosimeter SSS Selective Signaling System TCL Target Capabilities List TCP Traffic Control Point THD Technological Hazard Division TLD Thermoluminescent dosimeter UNC-W University of North Carolina - Wilmington USCG United States Coast Guard USDA U.S. Department of Agriculture UTL Universal Task List VFD Volunteer Fire Department Homeland Security Exercise and Evaluation Program (HSEEP)

AAR 2011 Harris Nuclear Plant REP Exercise 2011 HNP REP Exercise 71

This Page Intentionally Left Blank