| number = ML071920017
| number = ML071920017
| issue date = 07/11/2007
| issue date = 07/11/2007
| title = Perry, Unit, 1, Revised Pages of Facility Operating License No. NPF-58
| title = Unit, 1, Revised Pages of Facility Operating License No. NPF-58
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2

Revision as of 19:53, 17 April 2019

Unit, 1, Revised Pages of Facility Operating License No. NPF-58
ML071920017
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/11/2007
From:
NRC/NRR/ADRO/DORL/LPLIII-2
To:
Wengert, Thomas J, NRR/DORL, 415-4037
Shared Package
ML071920005 List:
References
EA-02-026, TAC MD4499
Download: ML071920017 (3)


Text

ENCLOSURE 1REVISED PAGES OF FACILITY OPERATING LICENSE NO. NPF-58DOCKET NO. 50-440PERRY NUCLEAR POWER PLANT, UNIT NO. 1Replace the following page of the Facility Operating License with the attached revised pages. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change. REMOVE INSERTLicense NPF-58License NPF-58Page 5Page 5-----Page 5a shall comply with the antitrust conditions delineated in Appendix C to this license;Appendix C is hereby incorporated into this license.b.FENOC shall comply with the antitrust conditions delineated in Appendix C tothis license as if named therein. FENOC shall not market or broker power or energy from the Perry Nuclear Power Plant, Unit No. 1. The Owners are responsible and accountable for the actions of FENOC to the extent that said actions affect the marketing or brokering of power or energy from the Perry Nuclear Power Plant, Unit No. 1, and in any way, contravene the antitrust condition contained in the license.(4) Deleted (5) Deleted (6) Fire Protection (Section 9.5, SER, SSER #1, 2, 3, 4, 7, and 8)FENOC shall comply with the following requirements of the fire protection program:FENOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, as amended, for the Perry Nuclear Power Plant and as approved in the Safety Evaluation Report (NUREG-0887) dated May 1982 and Supplement Nos. 1 through 10 thereto, subject to the following provisions:a.FENOC may make changes to the approved fire protection program without priorapproval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.(7) Deleted (8) Deleted (9) Deleted (10) Deleted (11) Mitigation Strategy License Condition llThe licensee shall develop and maintain strategies for addressing large fires and lexplosions and that include the follow key areas:

l l(a)Fire fighting response strategy with the following elements:

l1.Predefined coordinated fire response strategy and guidance l2.Assessment of mutual aid fire fighting assets l3.Designated staging areas for equipment and materials l

l lAmendment No. 137 Revised by letter dated July 11, 2007

- 5a -l4.Command and control l5.Training of response personnel ll(b)Operations to mitigate fuel damage considering the following:

l1.Protection and use of personnel assets l2.Communications l3.Minimizing fire spread l4.Procedures for implementing integrated fire response strategy l5.Identification of readily-available pre-staged equipment l6.Training on integrated fire response strategy l7.Spent fuel pool mitigation measures l

l(c)Actions to minimize release to include consideration of:

l1.Water spray scrubbing l2.Dose to onsite responders l

l Revised by letter dated July 11, 2007