Line 1: |
Line 1: |
| #REDIRECT [[L-2017-159, St. Lucie, Unit 1 - Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0]] | | {{Adams |
| | | number = ML17256A176 |
| | | issue date = 09/13/2017 |
| | | title = Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 |
| | | author name = Synder M J |
| | | author affiliation = Florida Power & Light Co |
| | | addressee name = |
| | | addressee affiliation = NRC/Document Control Desk, NRC/NRR |
| | | docket = 05000335 |
| | | license number = |
| | | contact person = |
| | | case reference number = L-2017-159 |
| | | document type = Letter type:L, Response to Request for Additional Information (RAI) |
| | | page count = 3 |
| | | project = |
| | | stage = Response to RAI |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 Inservice Inspection Plan SEP 1 3 2017 Fifth Ten-Year Interval Unit 1 Relief Request No. 3. Revision 0 |
| | |
| | ==References:== |
| | |
| | L-2017-159 10 CPR 50.4 10 CPR 50. 55a 1. PPL Letter L-2017-033 dated February 16, 2017, Inservice Inspection Plan Fifth Ten-Year Interval Unit 1 ReliefRequest No.3, Revision 0, ADAMS Accession ML 17047A283 |
| | : 2. 2017/08/15 NRR E-mail Capture -Request for Additional Information |
| | -St. Lucie Relief Request #3 -ICW 30" pipe defect removal (1viF9288), ADAMS Accession ML 17228A005 Per reference 1, Florida Power & Light (FPL), requested relief from the requirements of ASME Code, Section XI, Subsection IWA-4000 for defect removal prior to repair, since compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. In Reference 2 the NRC provided a request for additional information (RAI) for the submittal. |
| | This attachment to this letter provides FPL's response to the RAI. . Please contact Ken Frehafer at (772) 467-77 48 if there are any questions about this submittal. |
| | Licensing Manager St. Lucie Plant Attachment MJS/K\V'F cc: USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Units 1 and 2 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2017-159 Attachment Page 1 of 2 REQUEST FOR ADDITIONAL INFORMATION ST LUCIE NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-335 RELIEF REQUEST NUMBER 3, REVISION 0 PROPOSED ALTERNATIVE REQUIREMENTS FOR THE REPAIR OF INTAKE COOLING SYSTEM PIPING CACs MF9288 By letter dated February 16, 2017, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17047A283), Florida Power & Light (the licensee) requested the U. S. Nuclear Regulatory Commission (NRC) to authorize an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) regarding the repair of Intake Cooling Water (ICW) System piping at St. Lucie Unit 1 for the fifth 10-year inservice inspection interval (lSI). The current request is identified as Relief Request No. 3, Revision 0. By letter dated August 5, 2013 (ADAMS Accession No. ML 13220A029) the licensee submitted Relief Request No. 7, Revision 0, as an alternative to ASME Code regarding the repair of ICW system piping during the fourth 1 0-year lSI interval at St. Lucie Unit 1. The licensee provided supplemental information in a letter dated August 30, 2013 (ADAMS Accession No. ML 13283A011), and an E |
| | -mail dated November 22, 2013 (ADAMS Accession No. ML 13329A594). The NRC issued the safety evaluation for the fourth 1 0-year lSI interval Relief Request No. 7, Revision 0 on January 30, 2014 (ADAMS No. ML 14013A304). The NRC staff notes that the fourth 1 0-year lSI Relief Request No. 7, Revision 0 and the current fifth 1 0-year lSI Relief Request No. 3, Revision 0 appear to be identical except for the interval identified, Code Edition and Addenda, and the reference to two additional repairs performed on 1-30"-CW-29. Attachment 2 of the August 5, 2013, request letter provided calculations, including minimum wall thickness, for various sized plate repairs. Please provide verification that Attachment 2 of the August 5, 2013, letter referenced above is applicable to the current requested alternative. If the information in Attachment 2 is not applicable to Relief Request No. 3, Revision 0, please supplement the current request with updated calculations. Similarly, please provide verification that the fourth 10 |
| | -year lSI Relief Request No. 7, Revision 0 supplemental information provided in the August 30, 2013, letter and the November 22, 2013, email, as referenced above, is applicable to the current requested alternative. If the 2013 information is not applicable to Relief Request No. 3, Revision 0, please provide like supplemental information that is applicable to the current request. |
| | L-2017-159 Attachment Page 2 of 2 Florida Power and Light Response to Request for Additional Information (ML 17228A005): |
| | : 1. Please provide verification that Attachment 2 of the August 5, 2013, letter referenced above is applicable to the current requested alternative. If the information in Attachment 2 is not applicable to Relief Request No. 3, Revision 0, please supplement the current request with updated calculations. FPL Response: Attachment 2 of the August 5, 2013 letter (ADAMS Accession No. ML 13220A029) which submitted Relief Request No. 7, Revision 0, as an alternative to ASME Code regarding the repair of ICW system piping during the fourth 1 0 |
| | -year lSI interval at St. Lucie Unit 1 is applicable to the current Relief Request No. 3, Revision 0 for the St. Lucie Unit 1 fifth 1 0-year inservice inspection interval (lS I). 2. Similarly, please provide verification that the fourth 10 |
| | -year IS I Relief Request No. 7, Revision 0 supplemental information provided in the August 30, 2013, letter and the November 22, 2013, email, as referenced above, is applicable to the current requested alternative. If the 2013 information is not applicable to Relief Request No. 3, Revision 0, please provide like supplemental information that is applicable to the current request. FPL Response: The supplemental information in the letter dated August 30, 2013 (ADAMS Accession No. ML 13283A011) and the E |
| | -mail dated November 22, 2013 (ADAMS Accession No. ML 13329A594) in support of Relief Request No. 7, Revision 0, as an alternative to ASME Code regarding the repair of ICW system piping during the fourth 1 0-year lSI interval at St. Lucie Unit 1 are applicable to the current Relief Request No. 3, Revision 0 for the St. Lucie Unit 1 fifth 1 0-year inservice inspection interval (lSI) for the currently installed repairs. Future repairs will continue to use the same design with equivalent materials/coatings.}} |
Letter Sequence Response to RAI |
---|
|
|
MONTHYEARL-2017-033, Inservice Inspection Plan, Fifth Ten-Year Interval Unit I Relief Request No. 3, Revision 02017-02-16016 February 2017 Inservice Inspection Plan, Fifth Ten-Year Interval Unit I Relief Request No. 3, Revision 0 Project stage: Request L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 02017-09-13013 September 2017 Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 Project stage: Response to RAI ML17341A4422018-01-0404 January 2018 Relief from the Requirements of the ASME Code Relief Request No. 3 for the Fifth 10-Year Inservice Inspection Interval (CAC No. MF9288; EPID L-2017-LLR-0003) Project stage: Approval 2017-09-13
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 2024-08-07
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 ML23013A2032023-01-13013 January 2023 RAI Set 4 Draft Response L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response2022-09-19019 September 2022 Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response2022-09-0808 September 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment2022-08-0909 August 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response2022-01-19019 January 2022 License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2021-05-12012 May 2021 Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years2021-04-0101 April 2021 Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-022020-12-0404 December 2020 Supplement to Updated Final Response to NRC Generic Letter 2004-02 L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2020-06-26026 June 2020 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2020-04-30030 April 2020 Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements ML20015A0282020-01-14014 January 2020 NMFS to NRC, Concurrence with Interim Response to Requests for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control2019-09-11011 September 2019 Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response2019-08-21021 August 2019 Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-25025 July 2019 Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-24024 July 2019 Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2019-06-28028 June 2019 Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2019-107, License Amendment Request - Iodine Removal System Elimination2019-05-17017 May 2019 License Amendment Request - Iodine Removal System Elimination L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request2019-03-0707 March 2019 Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies2018-11-15015 November 2018 Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies2018-08-17017 August 2018 Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-24024 May 2018 Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations2018-04-0303 April 2018 Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 19772018-03-29029 March 2018 Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply2018-02-14014 February 2018 Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b2018-02-0101 February 2018 Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b L-2017-210, Updated Final Response to NRC Generic Letter 2004-022017-12-20020 December 2017 Updated Final Response to NRC Generic Letter 2004-02 L-2017-216, License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 62017-12-19019 December 2017 License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-012017-11-30030 November 2017 Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 02017-09-13013 September 2017 Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.52017-07-0303 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change2016-12-0505 December 2016 License Amendment Request EDG Day Tank Fuel Volume Change L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)2016-11-0303 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes2016-08-11011 August 2016 Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B2016-07-22022 July 2016 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents2016-07-15015 July 2016 Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48.2016-07-0808 July 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes2016-05-0606 May 2016 RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle2016-05-0606 May 2016 RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle L-2016-096, Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 02016-04-21021 April 2016 Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 2024-06-26
[Table view] |
Text
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 Inservice Inspection Plan SEP 1 3 2017 Fifth Ten-Year Interval Unit 1 Relief Request No. 3. Revision 0
References:
L-2017-159 10 CPR 50.4 10 CPR 50. 55a 1. PPL Letter L-2017-033 dated February 16, 2017, Inservice Inspection Plan Fifth Ten-Year Interval Unit 1 ReliefRequest No.3, Revision 0, ADAMS Accession ML 17047A283
- 2. 2017/08/15 NRR E-mail Capture -Request for Additional Information
-St. Lucie Relief Request #3 -ICW 30" pipe defect removal (1viF9288), ADAMS Accession ML 17228A005 Per reference 1, Florida Power & Light (FPL), requested relief from the requirements of ASME Code,Section XI, Subsection IWA-4000 for defect removal prior to repair, since compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. In Reference 2 the NRC provided a request for additional information (RAI) for the submittal.
This attachment to this letter provides FPL's response to the RAI. . Please contact Ken Frehafer at (772) 467-77 48 if there are any questions about this submittal.
Licensing Manager St. Lucie Plant Attachment MJS/K\V'F cc: USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Units 1 and 2 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2017-159 Attachment Page 1 of 2 REQUEST FOR ADDITIONAL INFORMATION ST LUCIE NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-335 RELIEF REQUEST NUMBER 3, REVISION 0 PROPOSED ALTERNATIVE REQUIREMENTS FOR THE REPAIR OF INTAKE COOLING SYSTEM PIPING CACs MF9288 By letter dated February 16, 2017, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17047A283), Florida Power & Light (the licensee) requested the U. S. Nuclear Regulatory Commission (NRC) to authorize an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) regarding the repair of Intake Cooling Water (ICW) System piping at St. Lucie Unit 1 for the fifth 10-year inservice inspection interval (lSI). The current request is identified as Relief Request No. 3, Revision 0. By letter dated August 5, 2013 (ADAMS Accession No. ML 13220A029) the licensee submitted Relief Request No. 7, Revision 0, as an alternative to ASME Code regarding the repair of ICW system piping during the fourth 1 0-year lSI interval at St. Lucie Unit 1. The licensee provided supplemental information in a letter dated August 30, 2013 (ADAMS Accession No. ML 13283A011), and an E
-mail dated November 22, 2013 (ADAMS Accession No. ML 13329A594). The NRC issued the safety evaluation for the fourth 1 0-year lSI interval Relief Request No. 7, Revision 0 on January 30, 2014 (ADAMS No. ML 14013A304). The NRC staff notes that the fourth 1 0-year lSI Relief Request No. 7, Revision 0 and the current fifth 1 0-year lSI Relief Request No. 3, Revision 0 appear to be identical except for the interval identified, Code Edition and Addenda, and the reference to two additional repairs performed on 1-30"-CW-29. Attachment 2 of the August 5, 2013, request letter provided calculations, including minimum wall thickness, for various sized plate repairs. Please provide verification that Attachment 2 of the August 5, 2013, letter referenced above is applicable to the current requested alternative. If the information in Attachment 2 is not applicable to Relief Request No. 3, Revision 0, please supplement the current request with updated calculations. Similarly, please provide verification that the fourth 10
-year lSI Relief Request No. 7, Revision 0 supplemental information provided in the August 30, 2013, letter and the November 22, 2013, email, as referenced above, is applicable to the current requested alternative. If the 2013 information is not applicable to Relief Request No. 3, Revision 0, please provide like supplemental information that is applicable to the current request.
L-2017-159 Attachment Page 2 of 2 Florida Power and Light Response to Request for Additional Information (ML 17228A005):
- 1. Please provide verification that Attachment 2 of the August 5, 2013, letter referenced above is applicable to the current requested alternative. If the information in Attachment 2 is not applicable to Relief Request No. 3, Revision 0, please supplement the current request with updated calculations. FPL Response: Attachment 2 of the August 5, 2013 letter (ADAMS Accession No. ML 13220A029) which submitted Relief Request No. 7, Revision 0, as an alternative to ASME Code regarding the repair of ICW system piping during the fourth 1 0
-year lSI interval at St. Lucie Unit 1 is applicable to the current Relief Request No. 3, Revision 0 for the St. Lucie Unit 1 fifth 1 0-year inservice inspection interval (lS I). 2. Similarly, please provide verification that the fourth 10
-year IS I Relief Request No. 7, Revision 0 supplemental information provided in the August 30, 2013, letter and the November 22, 2013, email, as referenced above, is applicable to the current requested alternative. If the 2013 information is not applicable to Relief Request No. 3, Revision 0, please provide like supplemental information that is applicable to the current request. FPL Response: The supplemental information in the letter dated August 30, 2013 (ADAMS Accession No. ML 13283A011) and the E
-mail dated November 22, 2013 (ADAMS Accession No. ML 13329A594) in support of Relief Request No. 7, Revision 0, as an alternative to ASME Code regarding the repair of ICW system piping during the fourth 1 0-year lSI interval at St. Lucie Unit 1 are applicable to the current Relief Request No. 3, Revision 0 for the St. Lucie Unit 1 fifth 1 0-year inservice inspection interval (lSI) for the currently installed repairs. Future repairs will continue to use the same design with equivalent materials/coatings.