ML14057A389: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML14057A389
| number = ML14057A389
| issue date = 02/25/2014
| issue date = 02/25/2014
| title = Palisades, Fitness for Duty Program Performance Report for 2013
| title = Fitness for Duty Program Performance Report for 2013
| author name = Gustafson O W
| author name = Gustafson O W
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc

Latest revision as of 23:08, 3 April 2019

Fitness for Duty Program Performance Report for 2013
ML14057A389
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/25/2014
From: Gustafson O W
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Security and Incident Response
Shared Package
ML14057A574 List:
References
PNP 2014-016
Download: ML14057A389 (3)


Text

  • . Entergy PNP 2014-016 February 25, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Fitness for Duty Program Performance Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 Otto W. Gustafson Director, Regulatory and Performance Improvement 10 CFR 26.717(e) 10 CFR 26.203(e)

In accordance with 10 CFR 26.717(e), Entergy Nuclear Operations, Inc. is submitting the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, through December 31 ,2013. The annual reporting form and single positive test forms are provided in Attachment 1 . In accordance with 10 CFR 26.203(e), the Fatigue Management Program Performance Report for the period of January 1, through December 31 , 2013, is provided in Attachment

2. This letter contains no new commitments and no revisions to existing commitments.

Sincerely, OWG/bed Attachments:

1. Annual Report Form 2. Fatigue Management Program Performance Report CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC ATTACHMENT 1 PALISADES NUCLEAR PLANT ANNUAL REPORTING FORM AND SINGLE POSITIVE TEST FORMS 9 Pages Follow ATTACHMENT 2 PALISADES NUCLEAR PLANT FATIGUE MANAGEMENT PROGRAM PERFORMANCE REPORT 1 Page Follows