ML14057A389
| ML14057A389 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 02/25/2014 |
| From: | Gustafson O Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| Shared Package | |
| ML14057A574 | List: |
| References | |
| PNP 2014-016 | |
| Download: ML14057A389 (3) | |
Text
11#flrffl, Entergy Nuclear Operations, Inc.
I LLIZI5y Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 269.764.2000 Otto W. Gustafson Director, Regulatory and Performance Improvement PNP 2014-016 February 25, 2014 10 CFR26.717(e) 10 CFR 26.203(e)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Fitness for Duty Program Performance Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Dear Sir or Madam:
In accordance with 10 CFR 26.717(e), Entergy Nuclear Operations, Inc. is submitting the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, through December 31, 2013. The annual reporting form and single positive test forms are provided in Attachment 1.
In accordance with 10 CFR 26.203(e), the Fatigue Management Program Performance Report for the period of January 1, through December 31, 2013, is provided in.
This letter contains no new commitments and no revisions to existing commitments.
Sincerely, OWG/bed Attachments:
1.
Annual Report Form 2.
Fatigue Management Program Performance Report CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
~. Entergy PNP 2014-016 February 25, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Fitness for Duty Program Performance Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Dear Sir or Madam:
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 Otto W. Gustafson Director, Regulatory and Performance Improvement 10 CFR 26.717(e) 10 CFR 26.203(e)
In accordance with 10 CFR 26.717(e), Entergy Nuclear Operations, Inc. is submitting the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, through December 31,2013. The annual reporting form and single positive test forms are provided in Attachment 1.
In accordance with 10 CFR 26.203(e), the Fatigue Management Program Performance Report for the period of January 1, through December 31, 2013, is provided in.
This letter contains no new commitments and no revisions to existing commitments.
Sincerely, OWG/bed Attachments: 1. Annual Report Form
- 2. Fatigue Management Program Performance Report CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ATTACHMENT I PALISADES NUCLEAR PLANT ANNUAL REPORTING FORM AND SINGLE POSITIVE TEST FORMS 9 Pages Follow ATTACHMENT 1 PALISADES NUCLEAR PLANT ANNUAL REPORTING FORM AND SINGLE POSITIVE TEST FORMS 9 Pages Follow
ATTACHMENT 2 PALISADES NUCLEAR PLANT FATIGUE MANAGEMENT PROGRAM PERFORMANCE REPORT I Page Follows ATTACHMENT 2 PALISADES NUCLEAR PLANT FATIGUE MANAGEMENT PROGRAM PERFORMANCE REPORT 1 Page Follows