ML072070087: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML072070087
| number = ML072070087
| issue date = 07/26/2007
| issue date = 07/26/2007
| title = San Onofre Nuclear Generating Station, Units 2 & 3 - Revised Pages of Facility Operating License Nos. NPF-10 and NPF-15
| title = Revised Pages of Facility Operating License Nos. NPF-10 and NPF-15
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV

Revision as of 09:21, 10 February 2019

Revised Pages of Facility Operating License Nos. NPF-10 and NPF-15
ML072070087
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/26/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Kalyanam N, NRR/DORL/LP4, 415-1480
Shared Package
ML072060009 List:
References
EA-02-026, TAC MD4564, TAC MD4565
Download: ML072070087 (6)


Text

ENCLOSURE 1REVISED PAGES OF FACILITY OPERATING LICENSE NOS. NPF-10 AND NPF-15DOCKET NOS. 50-361 AND 50-362SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3Replace the following pages of the Facility Operating Licenses. The revised pages areidentified by the date of the letter issuing these pages and contain marginal lines indicating theareas of change.REMOVEINSERTLicense NPF-10License NPF-10Page 7Page 7Page 8Page 8License NPF-15License NPF-15Page 6Page 6Page 7Page 7 Page 8Page 8 r.Plant-Specific Calculations for Compliance with 10 CFRSection 50.46 (II.K.3.31, SSER #1)Deleted by Amendment No. 185s.Improving Licensee Emergency Preparedness (III.A.2,SSER#1, SSER #5)Deleted by Amendment No. 185(20)Surveillance Program (Section 1.12, SSER #5)Deleted by Amendment No. 185(21)Laboratory Instrumentation (Section 1.12, SSER #5)Deleted by Amendment No. 185(22)Design Verification Program (Section 3.7.4, SSER #5)Deleted by Amendment No. 185(23)Emergency Preparedness ConditionsDeleted by Amendment No. 185(24)RCS Depressurization System (PORV's)Deleted by Amendment No. 185(25)Qualification of Auxiliary Feedwater (AFW) Pump Motor BearingsDeleted by Amendment No. 185(26)Mitigation Strategy License Condition llDevelop and maintain strategies for addressing large fires and lexplosions and that include the following key areas:

l l(a) Fire fighting response strategy with the following elements:

l1. Pre-defined coordinated fire response strategy and lguidancel2. Assessment of mutual aid fire fighting assets l3. Designated staging areas for equipment and materials l4. Command and control l5. Training of response personnel ll(b) Operations to mitigate fuel damage considering the following:

l1. Protection and use of personnel assets l2. Communications l3. Minimizing fire spread l4. Procedures for implementing integrated fire response lstrategyl5. Identification of readily-available pre-staged equipment lAmendment No. 185Revised by letter dated July 26, 2007 l 6. Training on integrated fire response strategy l7. Spent fuel pool mitigation measures ll(c)Actions to minimize release to include consideration of:

l1. Water spray scrubbing l2. Dose to onsite responders lD.Exemptions to certain requirements of Appendices G, H and J to 10CFR Part 50 are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, these exemptions are hereby granted. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.E.SCE shall fully implement and maintain in effect all provisions of theCommission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21 is entitled: "San Onofre Nuclear Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2" submitted by letter dated May 15, 2006.F.This license is subject to the following additional condition for theprotection of the environment:Before engaging in activities that may result in a significant adverseenvironmental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement, SCE shall provide a written notification of such activities to the NRC Office of Nuclear Reactor Regulation and receive written approval from that office before proceeding with such activities.G.DELETED H.SCE shall notify the Commission, as soon as possible but not laterthan one hour, of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.I.SCE shall have and maintain financial protection of such type and insuch amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

  • On September 29, 1983, the Safeguards Contingency Plan was made aseparate, companion document to the Physical Security Plan pursuant to the authority of 10 CFR 50.54.Amendment No. 205Revised by letter dated July 26, 2007 l i.Plant-Specific Calculations for Compliance with 10 CFRSection 50.46 (II.K.3.31, SSER #1)Deleted by Amendment No. 176j.Improving Licensee Emergency Preparedness (III.A.2,SSER #1, SSER #5)Deleted by Amendment No. 176(18)Emergency Preparedness ConditionsDeleted by Amendment Nos. 8 and 176(19)RCS Depressurization System (PORV's)Deleted by Amendment No. 176(20)Qualification of Auxiliary Feedwater (AFW) Pump Motor BearingsDeleted by Amendment No. 176(21)Surveillance Program (Section 1.12, SSER #5)Deleted by Amendment No. 176(22)Auxiliary Building Ventilation System.Deleted by Amendment No. 176(23)Fuel Assembly Shoulder Gap Clearance (SCE letter of July 25, 1983)Deleted by Amendment No. 176(24)Isolation Capability for Primary EOFDeleted by Amendment No. 176(25)Correction of CPC Software ErrorDeleted by Amendment No. 176(26)Reporting of AFWS FailuresDeleted by Amendment No. 176Amendment No. 176Revised by letter dated July 26, 2007 l (27)Mitigation Strategy License Condition llDevelop and maintain strategies for addressing large fires and explosions and lthat include the following key areas:

l l(a)Fire fighting response strategy with the following elements:

l1. Pre-defined coordinated fire response strategy and guidance l2. Assessment of mutual aid fire fighting assets l3. Designated staging areas for equipment and materials l4. Command and control l5. Training of response personnel ll(b) Operations to mitigate fuel damage considering the following:

l1. Protection and use of personnel assets l2. Communications l3. Minimizing fire spread l4. Procedures for implementing integrated fire response strategy l5. Identification of readily-available pre-staged equipment l6. Training on integrated fire response strategy l7. Spent fuel pool mitigation measures ll(c) Actions to minimize release to include consideration of:

l1. Water spray scrubbing l2. Dose to onsite responders lD.Exemptions to certain requirements of Appendices G, H and J to 10 CFRPart 50 are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, these exemptions are hereby granted. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission. E.SCE shall fully implement and maintain in effect all provisions of theCommission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21 is entitled: "San Onofre Nuclear Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2" submitted by letter dated May 15, 2006.

  • On September 29, 1983, the Safeguards Contingency Plan was made a separate,companion document to the Physical Security Plan pursuant to the authority of 10 CFR 50.54.Amendment No. 197Revised by letter dated July 26, 2007 l F.This license is subject to the following additional condition for theprotection of the environment:Before engaging in activities that may result in a significant adverseenvironmental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement, SCE shall provide a written notification of such activities to the NRC Office of Nuclear Reactor Regulation and receive written approval from that office before proceeding with such activities.G.DELETED H.SCE shall notify the Commission, as soon as possible but not later thanone hour, of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.I.SCE shall have and maintain financial protection of such type and insuch amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.J.This license is effective as of the date of issuance and shall expireat midnight on November 15, 2022.K.Deleted by Amendment No. 176FOR THE NUCLEAR REGULATORY COMMISSIONOriginal Signed byHarold R. DentonHarold R. Denton, DirectorOffice of Nuclear Reactor Regulation Attachments:1.Attachment 1 - Deleted by Amendment No. 1762.Appendix A (Technical Specifications)3.Appendix B (Environmental Protection Plan)4.Appendix C (Antitrust Conditions)Date of Issuance: NOV 15 1982Amendment No. 176, 197Revised by letter dated July 26, 2007 l