{{Adams
{{Adams
| number = ML13038A084
| number = ML003739969
| issue date = 03/31/1974
| issue date = 01/31/1976
| title = Ultimate Heat Sink for Nuclear Power Plants
| title = for Comment, Ultimate Heat Sink for Nuclear Power Plants
| author name =  
| author name =  
| author affiliation = US Atomic Energy Commission (AEC)
| author affiliation = NRC/RES
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = RG-1.027, Rev. 1
| document report number = Reg Guide 1.27, Rev 2
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 4
| page count = 5
}}
}}
{{#Wiki_filter:-REGULATORYýGUIDE:1.27
{{#Wiki_filter:U.S. NUCLEAR REGULATORY
_UT1MA~TE'H
COMMISSION
EAT S!NK A. ;NTOUT~-General -De Appendix A,"1~50, M'IJicensing.requires, in part"~Cooling
REGULATORY
'Water" of na. ' "to l'O:CFR'Part'
GUIDE OFFICE OF STANDARDS
tiization Facilotns,"
DEVELOPMENT
e:.:to assure -that sits ,Iec"unJt'acc*the Ind; ,co IWithst)ss , of it:equIesý
REGULATORY
I: .pan, LlUnI tures, onenLs _important to safety ibe I the:,effects
GUIDE 1.27 Revision 2 January 1976 ULTIMATE HEAT SINK FOR NUCLEAR POWER PLANTS
?of 'natural 'phenomena pability 'to -perform their "safety"describes~>a basis acceptable to t'he*snuiaiown cc ,one untW :the that accidei*shutdowni .a.ma'intaini'all'
nts. The Advisory -Cuminittee on R~.eactor has been consulited concelrnginghis guide and-ed imithe fegulatory~position.-itiy or.'the sink- sho ,p'ovide'ýe66liitabot hafor the pefio'oevaluateithce sjtuatinand for, the p to take' corrective action. A p ej considered- to be adequate -. or'addition:
-.roceCur es shoild 'be-avai]RB: i]l lter -s,ýstenvz1s Mnat compiex' oi ~waLT .':Sources', necessary retainiing
'ýstiuctures (e.g.,, a "pond m4; or -a river- with its'idam)
-and the canals.or nnecting the sources ,with.but'
not including, water system intak-structure
& 'for -a -nuclear'tL, f coolinrg towersor tfereof -are cnai -a -lu-cdy. suvvly'M w t'cl -IýS eeabd design bisis 'temperatuires of "safet/y-rel
'are not exceeded.-FoT
heat sinks where ,be timited anid/or 'the len peyrat'uireof'I"from 'the sink becmy bcrjcitic;abje~j
'capability
'of the'-tAing into accoL ecuiniment and li ions.


'hesinik safety on "mybet''pfovided by ',Where -'ti'rf ziyflda functions~~~~
==A. INTRODUCTION==
~ my b he-anIs or'cndiuits are require;aIprt ,bflhe ru iaural or ýman made 'features More one water .sinkrat-east Two only one source -may be involved, in the ultimate, ýheat sinki source of water has been demonstrated'to-be ade'quate;
the sink. The sink performs principal safety func tions: (1) dissipation of heat after reactor General Design Criterion
'complex,;in performfingithese functions -However, -iisingle canal may be-acceptable ift.s.....isfies.......
44, "Cooling Water," of shutdown and (2) dissi o idua1 heat after an Appendix A, "General Design Criteria," to 10 CFR Part accident.
conditions, Because of* the" ýimportance
'of ýthe sinkto- The four conditions above. Where the sink i clu~des; -orthese functions should be asured during and than ýone source of water ndividmuaatefi:so-rc
-.es'foillowingAhe-mnostsevere natural phenomnaempostulated may have -different des'ign requiremen'ts.',Mulitipwater'w Sfor,.te :siteýi(e~g the'-.safe
ýshutdown, earthquake, ,design -sources, including their associated x iretaining sui urs 6'basis-'totnado
'hurifiane,,flood, or diought?ý).
ln addition'
--and'required canals ýand' conduits, shoul~d~be''se'
_'rated, ~'thc~sifk safety functions
ýshould'be assured,ýuriing ot~her -and-protected so-thatfailure of-any-one--wýillntndc applicable stread vnsta my-b-cue'by failure -n.zany 'other 'that woudld- pred~udeitauoomphishing natural phenom'na such as river blockage;.
river the safdctfunctions of the The;c compiex 1(ibut not d ivex'ýsion or'rreservoli depletion, or if applicable, other -necessarily its individialj/ea-tiuý.S)
:rust Jberca0Able of accidents such a.s'transportation-accidentsrinvolving ship. withstandii eac -of th 'm~'e iat iral, phenmena'collisions.


airplane.
For a s e er unit, the sink 50, "Licensing of Production and Utilization Facilities," should be capable sufficient cooling water requires, in part, that suitable redundancy in features be to accomplish functions.


crashes, or -oil .spills .-and fires. -'expected, otlher s-ite-rielat-ed .evenrts, reasonable
provided for the cooling water system to ensure that its In consid ul e-unit station, it is recognized safety function can be accomplished.
6 R, a. combntieo o-s -of :less sever6;_atura1
ý'anL- -:coibina ions of rnaturalj nomena.and
/ior.ýste-.relatd.etI.,l
.acn ,or -.'' e nts;, :nd- a .bu le failure' of ; ,man ae stmact.ural-.
.... -,*.onider-d extent, needed fora-consistent, vel'of' $features y'ossof -, 0 capability of -the sirik 'to -conservitism;
for ýexaniple, -such- coijibinat-jons should be. -accompilish -its.,- safety -functions.-
'The. rmostl isevere-evlntý ~iics~ilee1e'rbbiro-hieitn phenomena .may be' considered rto occur undepen dently at
'haiing -ignifcariit consequences is- and -not simultaneouslyv.lnaddition the minglefafilure&of
-., comparabie to that associated wi -the most --severe .-.man-made st'r-uctural features need not be c'onsidCeedALo
-phenomena..-
occur-sirnuiltaneously with severe natural phenomena or''Th fe;h tld'bea -high 'level ~o~f ýassurance
1that:the--sieeledvnt, --.. waterces<
of the Willbe'availableht hen'needed, .For -example, it,-would be acceptabeif Water'Soure"'....
For 'natural ,sources.historical experienrceindicates'that
-.No. -. I (say a man-made pond with a dam) and'river blockage or :diversion may -be', possible, as well as connecting conduit -were capable.of withstanding thc changes'in
-,ocean ior lake levels as -a result -of -severe safeeshutdown earthquake, tornado, and drought and -'inalural :.events.


For 'man-made .portions, pa
General Design that thh s nuclear reactor unit includes Criterion
2, "Design Bases for Protection Against sufficie&#xfd;y epth that it is highly unlikely that Natural Phenomena," requires, in part, that structures, m th r systems, and components important to safety be m reactor unit will be in an accident any particular time. On this basis, the designed to withstand the effects of natural phenomenat tii 4  t sink complex serving multiple units should without loss of capability to perform their e ca le of providing sufficient cooling water to functions.


====r. ticularly ====
This guide describes a basis accplemepta l e it simultaneous safe shutdown and cooldown of all NRC staff that may be used to implement w pits it serves and to maintain them in a safe shutdown Design Criteria 44 and 2 with regard to a ondition.
'Water ,SourdceNo..2  
2(say -3 river-With an: existing dam)structures
'above 'ground, failures -are -not uncommon.


and its-connecting conduit w ere &#xfd;capable-,oof:withstznlding
Also, in the event of an accident in one unit, utfeature of the cooling water system,h to y of the sink should be able to dissipate the heat for that ultimate heat sink. This guide applies toe typ accident safely, to permit the concurrent safe shutdown nuclear power plants that use wat ~me and cooldown of the remaining units, and to maintain all ultimate heat sink. Air heat exch e or o6 eat- of them in a safe shutdown condition.
,&#xfd;t&#xfd;&#xfd;Because of &#xfd;these fatos cosdrto'hudb~ie the 'probable.


maximium flood -,How Ahe , tlecomiplex~as
dissipation methods used as ultim heat ks will be discussed in future revisions or appen~al 2  The capacity of the sink should be sufficient to provide cooling both for the period of time needed to B. CUS SION The ultimate h S' einafter "sink") for the cooling wate complex of water sources, including sa t ing structures (e.g., a pond with r with its dam), and the canals or con e sources with, but not including, water system intake structures for a nuclear power The sink constitutes the source of service or "house" ter supply necessary to safely operate, shut down, and cool down a plant. This safety-related water supply may be shared by nonsafety systems (e.g., circulating water supply). If cooling towers or portions thereof are required to accomplish the sink safety functions, they should satisfy the same requirements as aT -."e ".-.... cantis, .hann,'rq from Revision 1. March 1974.evaluate the situation and for the period of time needed to take corrective action. A period of 30 days is considered to be adequate for these purposes.
4theksjiiik
6cmprisi1g-t r ' *aaewhoue
'mustachalso
-,be cpable:, of hsandiii;
an 0,igtteast.&#xfd;two&#xfd;,a- asucee wwieinut.


tc d-fny':-kcJ fp fonk~fn fnls it -a-reasobf probable" zorfiibination
In addition, procedures should be available for ensuring the continued capability of the sink beyond 30 days. Sufficient conservatism should be provided to ensure that a 30-day 'supply of water is available and that the design basis temperatures of safety-related equipment are not exceeded.
~ofntir]o',,can 'bdemonstrated'-hit there is an ictremelyi l owv phenomena .without loss of the sinik'probability of losing ~ the capabilitiy
:of a sinle source functions.-For 'thotse -cases in:-whichlan believes a single S, waiter source -may be acceptable it should be The ultimate heat sink, as a -comp]ex, should be demostated that the source can withstand, without shown to be highly reliable' ,t shig nnh tger:howi g ha&#xfd;,Crti S- -- lo~ss ~ofrthe ssink~ safety functions -the following -events: -'conditions -are satisfied.


'For- .example, x onsideritWater- s&#xa2;: e~fai vere, atura mhenomiena .efaected, ta.ken, ,Source Noa -satbove 'Such i) .. .:~~~~ ~~.site-,Teiated eins' at~hve .thie river canLnotbdvetdo4lke ufcnlyt '' 7-ocd ;ibed or-tht.- i nay ocu uigt e p ,tlf a ,' affect the availability ofv-water at the connecting reasonably -Probable, combinations of less severe &#xfd;natural conduits;
For heat sinks where the supply may be limited and/or the temperature of plant intake water from the sink may become critical (e.g., ponds, lakes, cooling towers, or other sinks where recirculation between plant cooling water discharge and intake can occur), transient analyses of supply and/or temperature should be performed.
(2) no, serious &#xfd;transportation -accidents, have-pheno mena :and/or sile-related events, and"(4)--a single occurred-or canbe reasonably expected-, and (3) the dam -failuieof, man-made Struct-ural features. -In applying this- a "s designed to appropriately conservative requirements."single &#xfd;failure, various mechanistic failure modes 'has functioned properly over, it-s lifetimrel, and (balsed oln h -.be-hpostulated -One may choose assume a oprojectn te b will fnction v ... i~e-asum8 owveosa s, but ths sntnecessaf!
eu ...... Phe. -ohnp~iayo.


tt suce  o ee'colb !bnt-:tsAsoi i.-' ' properly -for the Aifetimeonof- the ~nncleor
A capacity of less than 30 days may be acceptable if it can be demonstrated that USNRC REGULATORY
GUIDES Comments should be sent to the Secretary of the Commission.


====i. powero ====
U.S. Nuclear Regulatory Commission.
..its it ":re qir 6i iiw h..neuneso
~otua , _serves. -Compliance with~ 'these, conditions would&#xfd; ino r-'ma4~~ratue o-~- d 6diin i -hixeitd ioever,-remo-61th'neediforf another sour ce D oloIng.- -ffect of forces in~mne :tthe ti e of riip'ture)
should water if a' sigefiueotedmcudr'l&#xfd;i'oiv-be assurned&#xfd;
however, 'it is notr-'ecessar-ily.


required that the coln 'iait fti, uco wt el one. assume th dan iitgrates instant'aneously with- constructed-features, not ~required to &#xfd;be desingedt A'total>-Is offnto---s-nte eapethe withstand
Washington.
'the safe' shutdown earthquake or the -Probable'
--consequences of a postulated slide of earthen canal walls maximum -flood ,shotild at -least, 'be designed- and- ': should' be assuredL;
however, it is not necessarily constructed to withstand;,the effects of the maximum rrequxe!ire at~ba ne&#xfd; assume wate~r~fow ceases ,completely, , .earthquake'deterri-mined~oti -the basis of historic seisnCity-~
1'. 7-: :
* b : " :.A gf , .& ,' .,: , ; ..= "5: " " .; , :: f : '"' = : , ': , ,r: .j a- -fi'7 iea&WtTfo bsdon~'everehiistorical events in4ihe &#xfd;regicn. in:~Ihe :importance of -the sink to safety-is such that, if, r during plant operation, the -cappability ok the .si -is" ,iiretened,:
as- for example 4t6 permit riecessary maintenance or as a result of damage, restrictions should-be p -lLaced on plant operation.-
The -technidal
'specificafio'ns'-should statae'Thea -c ti ons Io-b etakeni in the* event ,-.thc-,.,required capability -of -tfie--srik is -temporarily unavailable during ;plant ;operation.


For example, the Atechnical s pecifications.
D.C. 20556. Attention:
Docketing and Regulatory Guides are issued to describe and make available to the public Service Section.


should require-, that (1) the&#xfd;Clommission
methods acceptable to the NRC staff of implementing specific paris of the Commission's regulations, to delineate techniques used by the staff in evalu- The guidesare issued in the following ten broaddivisions:  
'be -notified-Af the sinkd does -not satisfy -the liniiting conditioni for -opetation-and,(2)-if its capability cannot be restoredto- this condition,.within z reasonable.period oftime, all- units- served:by the sink -L -hut down;{7:-....and--emainshut ,a; donunfil:this ctap~biliti:
sting specific problems or postulated accidents, or to provide guidance to appli cants. Regulatory Guides are not substitutes for regulations, and compliance
is-,x es tore d.-C. REGULATORY
1. Power Reactors 6. Products with them is not required.
POSITION 1. The ualtimate bheat sink should -&#xfd;be capable 'of.providing'
sufficient -cooling for at, least :30 days '(a) to permit simultaneous safe shutdown and cooldown of all nuclea-reactor units that it Serves and to maintain'them in, a&#xfd;'.ife:shutdown -condition and- Of an-;accdent, imnc'uie, uii~t:;tolimit tbe -e'ffect&#xfd;
oftha-ajccidu~nf y, ,to 'errhiit simultarcous and safeshutdown ofe remaining -units, sand to maintain them in a safe shutdown.aondition-.-procedures .for:assuringa continued,
30.days should~beavailable.


i speeds 'occurring'
Methods and solutions different from those set out in 2. Research and Test Reactors 7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to 3. Fuels and Materials Facilities
sirmltaneously results in the-maximum-amourjt -f-evaporafio nand drift loss.b. -Analysis-of-the temperature problem should use -the &#xfd;worst I- -day and -w'orst- 30-day .'periods of meteorological record in -the region .tre :ulting in rniriimum
8. Occupational Health the issuance or continuance of a permit or license by the Commission.
' -heat'transfer to .the- atmosphere"and maximum plant intake -temiperature.


..urthe',. 'thewos l-y-period ofrecod-Soud~hld- be assumred'tb Te-the fiksday CI f-the worst .30-day :period -of ',record.
4. Environmental and Siting 9. Antitrust Review Comments and suggestions for improvements in these guides are encouraged
5. Materials and Plant Protection
10 General t aelI times, and guides will be revised, as appropriate, to accommodate com ments and to reflect new information or experience.


For'transient temperature -analysis, diurnal variations
However, comments on Copies of published guides may be obtained by written request, indicating the this guide, if received within about two months after its issuance, will be par divisions desired to the U.S. Nuclear Regulatory Commission.
-.intemperature should :be used fo6r the 1-day and 30-day periods' of analysis.


These -variations are readily- estimated:  
Washington, D.C.  ticularly useful in evaluating the need for an early revision 20%65. Attention:  
from'local-,weather;,-r~ecord~s.
Director.


App~tlicants -should-1be
Office of Standards Development.
;assufredthat either a-normal-oreniergency shutdown during the&#xfd; worst--1-day and 30-day period -;of -record will not iresult in plant intake water temperatures-'exceeding Aesin basis tem peratures.--
---The above -analysis related .to 'the,30-day cooling --supply .and .the tempnerature should 'include--sufficient
'information
',to 'substantiate t'he- assumrpt'ions- and-analytical -methods used- hismnformation should,-include'
actual, erformance
&#xfd;data -for a'siiriil4),coiluing K-mnethod:operating
'under-load
&#xfd;near rthe specifi:deSg
"...~conditions,-or justification, that-- conserva-tive -drift 'loss-ri:d'" heat transfer v''iues'h
,,'eb'eni used. , --:-A co6ling capacity.


of less than 30 days may be acceptable if-it -can' be:.demonstrated
replenishment can be effected to ensure the continuous capability of the sink to perform its safety functions, taking into account the availability of replenishment equipment and limitations that may be imposed on "freedom of movement" following an accident.
:that,, replenisiiment:
.-~f =e n" O LL~1~gLm W 4Lr, I .:.u.pp1y. -can oe,-" 'erJrecr5o-to, --"" .....c.ent 'conservatism shouldbe provided to assure assure the 'continuous~capabili' the- *in ito -perfor'..
'that a 30-day- cooling supily is -available and that design .its ,s- et-y-functi iinto, i theo nt;t e avabilit yte-mperat f 'sfety--'elated,:equipment are -not -of replenishi ent.equipment'and  
'limitations that may be" exceeed.'
' -l-Fr "heat, sinks where -the iipply Vmay', be --imposed on Treedom of--,.movement" .followng an limited and/or the 'temperature of plant intake -water accident or-the occurrence of severenatural phenomena.


-from the sink may eventually become- critical (. -..-cooling -towers, -or --other' sinks -where -2. 'The ultimate'heat-sink complex, -whether composed Srecirculation between 1lant .cooling and ' -.ofsingbeTormultiple water.,-sources, shouldbe intake -can occur), transient analyses -of.supply-and/or withstanding, without loss of sink-, saet functpnof
The meteorological conditions considered in the design of the sink should be selected with respect to the controlling parameters and critical time periods unique to the specific-design of the sink. For example, consider a dry cooling tower as the sink. The controlling parameter would be a dry bulb temperature, and the critical time period may be on the order of one hour. Therefore, an acceptable design basis meteorological condition for this sink would be the maximum observed (based on regional climatological information)
:" te: emperature should be-performed.
one-hour dry bulb temperature.


using the folowing:
As another example, consider a cooling pond as the sink where the pond temperature may reach a maximum in 5 days following a shutdown This maximum temperature should coincide with the most severe combination of controlling meteorological parameters for a 1-day period. Therefore, three critical time periods should be considered:  
specified in regulatory
5 days, I day, and 30 days (to ensure the availability of a 30-day cooling supply). These three periods need not occur contig uously. They may be combined, however, in the indicated order to produce a synthetic
.position C I, the following  
36-day period which may be used as the design basis for the pond. Alternatively, the worst 36-consecutive-day period from historical climatological data may be used as the design basis. This period may or may not include the worst 5-day, I-day or 30-day period.  The meteorological conditions resulting in maximum evaporation and drift losses should be the worst 30-day average combination of controlling parameters (e.g., dewpoint, depression, windspeed,, solar radiation);
--'- '' " ' --,events'.
The meteorological conditions resulting in minimum water cooling should be the worst combination of controlling parameters, including diurnal variations where appropri ate, for the critical time period(s)
-at., A~nalysis sup-porting
unique to the specific design of the sink. The sink safety functions may be provided by natural or manmade features.
'the a,. -vailabi.ity of a 30-day -cool ing. should be: based. oii a. The most severe natural phenomena expected measurements combining the -worst irecorded
30-day takei individually, average) of maxlinumrdifference -between -" dry , temperature and .dewpoint
..temerature,.
AT, -- -b. -The -site-related- events' .(eg:, transportation
-!.and .the..ihest wind speeds recorded during the same accident, river-diversion) historically have ocdutrred&#xfd;, 2.30-day ~period &#xfd;such-Ahat the combination of IoT and, orhat may'occurduring the-plant-lifetime, ........... ... ..eas na.ly .. 'able --combinations
'of less, nds,..&. se' r naturalphenomena
2ndfor-site-related events, Mayi "be-madc, analytical -techniques andicomputer S-' prgams ",Contained iq "Generic Emergency- Cooling Pond ." , Analy'sis,--"COO 2224-1 May'1972 -October 1972,preparedfor
--d.. -A single -failure of man-made struct ural -'the' USAEC by :Uni'ersity of Pennsylvainia, School of features..Engiee-in.and App-lited Science, Civil Engineering, Philadelphia,--
719I04- For sinks other than-small shallow nooling -3.* The -ultimate iheat .sink.should consist of a least two' --D mnuaransien. .analyses, should.,:be performed to sources of.water,, including-their--retaining st~uctures
1 -&#xfd;&#xfd;de ion d/ortm'imor, ' "u mrnintakewater.


-,eacl-,w th the',cp~abiity -to perform the safety fn ct-ions -'spcfe-i reuator~yposition- C.-l. above, r&#xfd;itcT-I. -' -p,. ---~ I- -'----------------------
More than one water source may be involved in the sink complex in performing these functions under different conditions.
31 -
DC GcmtM 0 Sta ed that thicm is an extremcly
'low ptobability of losbig -,ie capabilhtytof -i single source.fci'her should be a lattwo aqueducts connecting the SOurce('s)4.'ith thc intake structures of the-nuclear power u.nts, unless. it cqan be demonstrated that 'Ihere ..is an c~treme~ly'ow probabilityvthat'a ,singleaqueduct can faIil entirelv-'&#xfd;s a'T6 Wi of natra peioea.1,Iwae sorces and their Lassuyciated aqueductSs hiouldb b-highfly diaie ndsholdbc separ-ated and pro tected~such'
that failure of any one1will not inducefaihiueof.t
4. The technical.:specifjica;tiofs include ,provisions for actions :to:th


====a. conditions ====
Because of the importance of the sink to safety, these functions should be ensured during and following the most severe natural phenomena postulated for the site (e.g., the Safe Shutdown Earthquake, design basis tornado, hurricane, flood, or drought).
4hrea~ten:
In addition, the sink safety functions should be ensured during other applicable site-related events that may be caused by natural phenomena such as river blockage, river diversion, or reservoir depletion or, if applicable, accidents such as ship collisions, airplane crashes, or oil spills and fires. Reasonable combinations of less severe natural and accidental phenomena or conditions should also be considered to the extent needed for a consistent level of conservatism;
p&#xfd;t i~dgil Ibe- Wi-niate, heat..sink or -IllieI''satisfy reg ulat ory. posit ions i:C..f-operation.'
for example, such combinations should be evaluated in cases where the probability of their existing at the same time and having significant consequences is comparable to that associated with the most severe phenomena.
~';' p'.''.-. ~ A, i,%5 * : I I': -'?i!}}
 
There should be a high level of assurance that the water sources of the sink will be available when needed.  For natural sources, historical experience indicates that river blockage or diversion may be possible, as well as changes in ocean or lake levels as a result of severe natural events. For manmade portions, particularly structures above ground, failures are not uncommon.
 
Because of these factors, consideration should be given to the sink comprising at least two water sources, each capable of performing the sink safety functions, unless it can be demonstrated that there is an extremely low probability of losing the capability of a single source.  Examples of sinks that have been found acceptable by the staff are as follows: I.  2.  3.  4.  5.  6.  7.  8.A large river A large lake An ocean Two spray ponds* A spray pond* and a reservoir A spray pond* and a river Two mechanical draft towers with basins* A mechanical draft tower with basin* and a river 9. A mechanical draft tower with basin* and a lake 10. A cooling lake with a submerged pond* 11. Two wet/dry forced draft towers* 12. Two dry forced draft towers* For those cases in which an applicant believes a single water source may be acceptable, it should be demon strated that the source can withstand, individually without loss of the sink safety function, each of the following events: (1) the most severe natural phenom ena expected at the site with appropriate ambient conditions, but with no two or more such phenomena occurring simultaneously, (2) the site-related events that have occurred or that may occur during the plant lifetime, (3) reasonable probable combinations of less severe natural phenomena and/or site-related events, and (4) a single failure of manmade structural features.
 
In applying this "single failure," various mechanistic failure modes should be postulated.
 
One may choose to assume a complete functional loss, but this is not necessarily required.
 
For example, the consequences of a postulated major rupture of a dam (including the time-related effects of forces imposed at the time of rupture) should*Seismic Category I design.1.27-2 I
be assumed; however, it is not necessarily required that one assume that the dam disintegrates instantaneously with total loss of function.
 
As another example, the con sequences of a postulated slide of earthen canal walls should be assumed; however, it is not necessarily required that one assume that waterflow ceases completely.
 
Where canals or conduits are required as part of the sink, at least two should be provided, even if only one source of water has been demonstrated to be adequate.
 
However, a single canal may be acceptable if it satisfies the four conditions above. Where the sink includes more than one source of water, the individual water sources may have different design requirements.
 
Multiple water sources, including their associated retaining structures and required canals and conduits, should be separated and protected so that failure of any one will not induce failure in any other that would preclude accomplishing the safety functions of the sink. The complex (but not necessarily its individual features)
must be capable of withstanaing each of the most severe natural phenomena expected, other site-related events, reasonable combina tions of natural phenomena and/or site-related events, and a single failure of manmade structural features without loss of capability of the sink to accomplish its safety functions.
 
The most severe phenomena may be considered to occur independently and not simul taneously.
 
In addition, the single failure of manmade structural features need not be considered to occur simultaneously with severe natural phenomena or site related events.  For example, it would be acceptable if Water Source No. I (e.g., a manmade pond with a dam) and connecting conduit were capable of withstanding the Safe Shutdown Earthquake, tornado, and drought and Water Source No. 2 (e.g., a river with an existing dam) and its connecting conduit were capable of withstanding any reasonable probable combination of natural or accidental phenomena without loss of the sink func tions.  The ultimate heat sink, as a complex, should be shown to be highly reliable by showing that certain conditions are satisfied.
 
For example, consider Water Source No. 2, above. Such conditions would include: (1) the river cannot be diverted or blocked sufficiently to affect the availability of water at the connecting conduits;
(2) no serious transportation acci dents have occurred or can be reasonably expected;
and (3) the dam was designed to appropriately conservative requirements, has functioned properly over its lifetime, and (based on projection of the best available data) will function properly for the lifetime of the nuclear power units it serves. Compliance with these conditions would not, however, remove the need for another source of cooling water if a single failure of the dam could result in losing the cooling capability of this source of water.  Newly constructed features not required to be designed to withstand the Safe Shutdown Earthquake or the Probable Maximum Flood should at least be designed and constructed to withstand the effects of the Operat ing Basis Earthquake (as defined in 10 CFR Part 100, Appendix A) and waterflow based on severe historical events in the region.  The importance of the sink to safety is such that, if during plant operation the capability of the sink is threatened, as for example to permit necessary mainte nance or as a result of damage, restrictions should be placed on plant operation.
 
The technical specifications should state the actions to be taken in the event the required capability of the sink is temporarily unavailable during plant operation.
 
For example, the technical specifications should require that (1) NRC be notified if the sink does not satisfy the limiting condition for operation and (2) if its capability cannot be restored to this condition within a reasonable period of time, all units sdrved by the sink be shut down and remain shut down until this capability is restored.
 
C. REGULATORY
POSITION 1. The ultimate heat sink should be capable of providing sufficient cooling for at least 30 days (a) to permit simultaneous safe shutdown and cooldown of all nuclear reactor units that it serves and to maintain them in a safe shutdown condition, and (b) in the event of an accident in one unit, to limit the effects of that accident safely, to permit simultaneous and safe shutdown of the remaining units, and to maintain them in a safe shutdown condition.
 
Procedures for ensuring a con tinued capability after 30 days should be available.
 
Sufficient conservatism should be provided to ensure that a 30-day cooling supply is available and that design basis temperatures of safety-related equipment are not exceeded.
 
For heat sinks where the supply may be limited and/or the temperature of plant intake water from the sink may eventually become critical (e.g., ponds, lakes, cooling towers, or other sinks where recirculation between plant cooling water discharge and intake can occur), transient analyses*
of supply and/or temperature should be performed.
 
The meteorological conditions resulting in maximum evaporation and drift loss should be the worst 30-day *For transient analysis of small shallow cooling ponds, use may be made of the analytical techniques and computer programs contained in "Generic Emergency Cooling Pond Analysis," COO-2224-1, May 1972-October
1972, prepared for the USAEC by University of Pennsylvania, School of Engineering and Applied Science, Civil Engineering, Philadelphia, Pennsyl vania 19104. For sinks other than small shallow cooling ponds, similar transient analyses should be performed to demonstrate acceptable inventory and/or maximum intake water temper ature.1.27-3 average combination of controlling parameters (e.g., dewpoint depression, windspeed, solar radiation). 
The meteorological conditions resulting in minimum water cooling should be the worst combination of controlling parameters, including diurnal variations where appropriate, for the critical time period(s)
unique to the specific design of the sink.  The following are acceptable methods for selecting these conditions:
a. Based on regional climatological*
information, select the most severe observation for the critical time period(s)
for each controlling parameter or parameter combination, with substantiation of the conservatism of these values for site use. The individual conditions may be combined without regard to historical occurrence.
 
b. Select the most severe combination of control ling parameters, including diurnal variations where appropriate, for the total of the critical time period(s), based on examination of regional climatological*
measurements that are demonstrated to be representa tive of the site. If significantly less than 30 years of representative data are available, other historical regional data should be examined to determine controlling meteorological conditions for the critical time period(s). 
If the examination of other historical regional data indicates that the controlling meteorological conditions did not occur within the period of record for the available representative data, then these conditions should be correlated with the available representative data and appropriate adjustments should be made for site conditions.
 
c. Less severe meteorological conditions may be assumed when it can be demonstrated that the consequences of exceeding lesser design basis conditions for short time periods are acceptable.
 
Information on magnitude, persistence, and frequency of occurrence of controlling meteorological parameters that exceed the design basis conditions, based on acceptable data as discussed above, should be presented.
 
The above analysis related to the 30-day cooling supply and the excess temperature should include sufficient information to substantiate the assumptions and analytical methods used. This information should include actual performance data for a similar cooling method operating under load near the specified design conditions or justification that conservative evaporation and drift loss and heat transfer values have been used. A cooling capacity of less than 30 days may be acceptable if it can be demonstrated that replenishment or use of an alternate water supply can be effected to *Climatological in this context pertains to a recent period of record at least 30 years in length.assure the continuous capability of the sink to perform its safety functions, taking into account the availability of replenishment equipment and limitations that may be imposed on "freedom of movement" following an accident or the occurrence of severe natural phenomena.
 
2. The ultimate heat sink complex, whether com posed of single or multiple water sources, should be capable of withstanding, without loss of the sink safely functions specified in regulatory position 1, the follow ing events: a. The most severe natural phenomena expected at the site, with appropriate ambient conditions, but with no two or more such phenomena occurring simultaneously, b. The site-related events (e.g., transportation accident, river diversion)
that historically have occurred or that may occur during the plant lifetime, c. Reasonably probable combinations of less severe natural phenomena and/or site-related events, d. A single failure of manmade structural features.
 
Ultimate heat sink features, which are constructed specifically for the nuclear power plant and which are not required to be designed to withstand the Safe Shutdown Earthquake or the Probable Maximum Flood, should at least be designed and constructed to withstand the effects of the Operating Basis Earthquake (as defined in 10 CFR Part 100, Appendix A) and waterflow based on severe historical events in the region.  3. The ultimate heat sink should consist of at least two sources of water, including their retaining struc tures, each with the capability to perform the safety functions specified in regulatory position I, unless it can be demonstrated that there is an extremely low proba bility of losing the capability of a single source. For close-loop cooling systems, there should be at least two aqueducts connecting the source(s)
with the intake structures of the nuclear power units and at least two aqueducts to return the cooling water to the source, unless it can be demonstrated that there is extremely low probability that a single aqueduct can functionally fail entirely as a result of natural or site-related phenomena.
 
For once-through cooling systems, there should be at least two aqueducts connecting the source(s)
with the intake structures of the nuclear power units and at least two aqueducts to discharge the cooling water well away from the nuclear power plant to ensure that there is no potential for plant flooding by the discharged cooling water, unless it can be demonstrated that there is extremely low probability that a single aqueduct can functionally fail as a result of natural or site-related phenomena.
 
All water sources and their associated aqueducts should be highly reliable and 27-4 I  
should be separated and protected such that failure of any one will not induce failure of any other.  4. The technical specifications for the plant should include provisions for actions to be taken in the event that conditions threaten partial loss of the capability of the ultimate heat sink or the plant temporarily does not satisfy regulatory positions
1 and 3 'during operation.
 
==D. IMPLEMENTATION==
The purpose of this section is to provide information to license applicants and licensees regarding the NRC staffs plans for implementing this regulatory guide.  This guide reflects current Nuclear Regulatory Com mission practice.
 
Therefore, except in those cases in which the license applicant or licensee proposes an acceptable alternative method, the method described herein for complying with specified portions of the Commission's regulations is being and will continue to be used in the evaluation of submittals for operating license or construction permit applications until this guide is revised as 'a result of suggestions from the public or additional staff review.1.27-5}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 03:41, 21 September 2018

for Comment, Ultimate Heat Sink for Nuclear Power Plants
ML003739969
Person / Time
Issue date: 01/31/1976
From:
Office of Nuclear Regulatory Research
To:
References
Reg Guide 1.27, Rev 2
Download: ML003739969 (5)


U.S. NUCLEAR REGULATORY

COMMISSION

REGULATORY

GUIDE OFFICE OF STANDARDS

DEVELOPMENT

REGULATORY

GUIDE 1.27 Revision 2 January 1976 ULTIMATE HEAT SINK FOR NUCLEAR POWER PLANTS

A. INTRODUCTION

the sink. The sink performs principal safety func tions: (1) dissipation of heat after reactor General Design Criterion 44, "Cooling Water," of shutdown and (2) dissi o idua1 heat after an Appendix A, "General Design Criteria," to 10 CFR Part accident.

For a s e er unit, the sink 50, "Licensing of Production and Utilization Facilities," should be capable sufficient cooling water requires, in part, that suitable redundancy in features be to accomplish functions.

provided for the cooling water system to ensure that its In consid ul e-unit station, it is recognized safety function can be accomplished.

General Design that thh s nuclear reactor unit includes Criterion

2, "Design Bases for Protection Against sufficieýy epth that it is highly unlikely that Natural Phenomena," requires, in part, that structures, m th r systems, and components important to safety be m reactor unit will be in an accident any particular time. On this basis, the designed to withstand the effects of natural phenomenat tii 4 t sink complex serving multiple units should without loss of capability to perform their e ca le of providing sufficient cooling water to functions.

This guide describes a basis accplemepta l e it simultaneous safe shutdown and cooldown of all NRC staff that may be used to implement w pits it serves and to maintain them in a safe shutdown Design Criteria 44 and 2 with regard to a ondition.

Also, in the event of an accident in one unit, utfeature of the cooling water system,h to y of the sink should be able to dissipate the heat for that ultimate heat sink. This guide applies toe typ accident safely, to permit the concurrent safe shutdown nuclear power plants that use wat ~me and cooldown of the remaining units, and to maintain all ultimate heat sink. Air heat exch e or o6 eat- of them in a safe shutdown condition.

dissipation methods used as ultim heat ks will be discussed in future revisions or appen~al 2 The capacity of the sink should be sufficient to provide cooling both for the period of time needed to B. CUS SION The ultimate h S' einafter "sink") for the cooling wate complex of water sources, including sa t ing structures (e.g., a pond with r with its dam), and the canals or con e sources with, but not including, water system intake structures for a nuclear power The sink constitutes the source of service or "house" ter supply necessary to safely operate, shut down, and cool down a plant. This safety-related water supply may be shared by nonsafety systems (e.g., circulating water supply). If cooling towers or portions thereof are required to accomplish the sink safety functions, they should satisfy the same requirements as aT -."e ".-.... cantis, .hann,'rq from Revision 1. March 1974.evaluate the situation and for the period of time needed to take corrective action. A period of 30 days is considered to be adequate for these purposes.

In addition, procedures should be available for ensuring the continued capability of the sink beyond 30 days. Sufficient conservatism should be provided to ensure that a 30-day 'supply of water is available and that the design basis temperatures of safety-related equipment are not exceeded.

For heat sinks where the supply may be limited and/or the temperature of plant intake water from the sink may become critical (e.g., ponds, lakes, cooling towers, or other sinks where recirculation between plant cooling water discharge and intake can occur), transient analyses of supply and/or temperature should be performed.

A capacity of less than 30 days may be acceptable if it can be demonstrated that USNRC REGULATORY

GUIDES Comments should be sent to the Secretary of the Commission.

U.S. Nuclear Regulatory Commission.

Washington.

D.C. 20556. Attention:

Docketing and Regulatory Guides are issued to describe and make available to the public Service Section.

methods acceptable to the NRC staff of implementing specific paris of the Commission's regulations, to delineate techniques used by the staff in evalu- The guidesare issued in the following ten broaddivisions:

sting specific problems or postulated accidents, or to provide guidance to appli cants. Regulatory Guides are not substitutes for regulations, and compliance

1. Power Reactors 6. Products with them is not required.

Methods and solutions different from those set out in 2. Research and Test Reactors 7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to 3. Fuels and Materials Facilities

8. Occupational Health the issuance or continuance of a permit or license by the Commission.

4. Environmental and Siting 9. Antitrust Review Comments and suggestions for improvements in these guides are encouraged

5. Materials and Plant Protection

10 General t aelI times, and guides will be revised, as appropriate, to accommodate com ments and to reflect new information or experience.

However, comments on Copies of published guides may be obtained by written request, indicating the this guide, if received within about two months after its issuance, will be par divisions desired to the U.S. Nuclear Regulatory Commission.

Washington, D.C. ticularly useful in evaluating the need for an early revision 20%65. Attention:

Director.

Office of Standards Development.

replenishment can be effected to ensure the continuous capability of the sink to perform its safety functions, taking into account the availability of replenishment equipment and limitations that may be imposed on "freedom of movement" following an accident.

The meteorological conditions considered in the design of the sink should be selected with respect to the controlling parameters and critical time periods unique to the specific-design of the sink. For example, consider a dry cooling tower as the sink. The controlling parameter would be a dry bulb temperature, and the critical time period may be on the order of one hour. Therefore, an acceptable design basis meteorological condition for this sink would be the maximum observed (based on regional climatological information)

one-hour dry bulb temperature.

As another example, consider a cooling pond as the sink where the pond temperature may reach a maximum in 5 days following a shutdown This maximum temperature should coincide with the most severe combination of controlling meteorological parameters for a 1-day period. Therefore, three critical time periods should be considered:

5 days, I day, and 30 days (to ensure the availability of a 30-day cooling supply). These three periods need not occur contig uously. They may be combined, however, in the indicated order to produce a synthetic

36-day period which may be used as the design basis for the pond. Alternatively, the worst 36-consecutive-day period from historical climatological data may be used as the design basis. This period may or may not include the worst 5-day, I-day or 30-day period. The meteorological conditions resulting in maximum evaporation and drift losses should be the worst 30-day average combination of controlling parameters (e.g., dewpoint, depression, windspeed,, solar radiation);

The meteorological conditions resulting in minimum water cooling should be the worst combination of controlling parameters, including diurnal variations where appropri ate, for the critical time period(s)

unique to the specific design of the sink. The sink safety functions may be provided by natural or manmade features.

More than one water source may be involved in the sink complex in performing these functions under different conditions.

Because of the importance of the sink to safety, these functions should be ensured during and following the most severe natural phenomena postulated for the site (e.g., the Safe Shutdown Earthquake, design basis tornado, hurricane, flood, or drought).

In addition, the sink safety functions should be ensured during other applicable site-related events that may be caused by natural phenomena such as river blockage, river diversion, or reservoir depletion or, if applicable, accidents such as ship collisions, airplane crashes, or oil spills and fires. Reasonable combinations of less severe natural and accidental phenomena or conditions should also be considered to the extent needed for a consistent level of conservatism;

for example, such combinations should be evaluated in cases where the probability of their existing at the same time and having significant consequences is comparable to that associated with the most severe phenomena.

There should be a high level of assurance that the water sources of the sink will be available when needed. For natural sources, historical experience indicates that river blockage or diversion may be possible, as well as changes in ocean or lake levels as a result of severe natural events. For manmade portions, particularly structures above ground, failures are not uncommon.

Because of these factors, consideration should be given to the sink comprising at least two water sources, each capable of performing the sink safety functions, unless it can be demonstrated that there is an extremely low probability of losing the capability of a single source. Examples of sinks that have been found acceptable by the staff are as follows: I. 2. 3. 4. 5. 6. 7. 8.A large river A large lake An ocean Two spray ponds* A spray pond* and a reservoir A spray pond* and a river Two mechanical draft towers with basins* A mechanical draft tower with basin* and a river 9. A mechanical draft tower with basin* and a lake 10. A cooling lake with a submerged pond* 11. Two wet/dry forced draft towers* 12. Two dry forced draft towers* For those cases in which an applicant believes a single water source may be acceptable, it should be demon strated that the source can withstand, individually without loss of the sink safety function, each of the following events: (1) the most severe natural phenom ena expected at the site with appropriate ambient conditions, but with no two or more such phenomena occurring simultaneously, (2) the site-related events that have occurred or that may occur during the plant lifetime, (3) reasonable probable combinations of less severe natural phenomena and/or site-related events, and (4) a single failure of manmade structural features.

In applying this "single failure," various mechanistic failure modes should be postulated.

One may choose to assume a complete functional loss, but this is not necessarily required.

For example, the consequences of a postulated major rupture of a dam (including the time-related effects of forces imposed at the time of rupture) should*Seismic Category I design.1.27-2 I

be assumed; however, it is not necessarily required that one assume that the dam disintegrates instantaneously with total loss of function.

As another example, the con sequences of a postulated slide of earthen canal walls should be assumed; however, it is not necessarily required that one assume that waterflow ceases completely.

Where canals or conduits are required as part of the sink, at least two should be provided, even if only one source of water has been demonstrated to be adequate.

However, a single canal may be acceptable if it satisfies the four conditions above. Where the sink includes more than one source of water, the individual water sources may have different design requirements.

Multiple water sources, including their associated retaining structures and required canals and conduits, should be separated and protected so that failure of any one will not induce failure in any other that would preclude accomplishing the safety functions of the sink. The complex (but not necessarily its individual features)

must be capable of withstanaing each of the most severe natural phenomena expected, other site-related events, reasonable combina tions of natural phenomena and/or site-related events, and a single failure of manmade structural features without loss of capability of the sink to accomplish its safety functions.

The most severe phenomena may be considered to occur independently and not simul taneously.

In addition, the single failure of manmade structural features need not be considered to occur simultaneously with severe natural phenomena or site related events. For example, it would be acceptable if Water Source No. I (e.g., a manmade pond with a dam) and connecting conduit were capable of withstanding the Safe Shutdown Earthquake, tornado, and drought and Water Source No. 2 (e.g., a river with an existing dam) and its connecting conduit were capable of withstanding any reasonable probable combination of natural or accidental phenomena without loss of the sink func tions. The ultimate heat sink, as a complex, should be shown to be highly reliable by showing that certain conditions are satisfied.

For example, consider Water Source No. 2, above. Such conditions would include: (1) the river cannot be diverted or blocked sufficiently to affect the availability of water at the connecting conduits;

(2) no serious transportation acci dents have occurred or can be reasonably expected;

and (3) the dam was designed to appropriately conservative requirements, has functioned properly over its lifetime, and (based on projection of the best available data) will function properly for the lifetime of the nuclear power units it serves. Compliance with these conditions would not, however, remove the need for another source of cooling water if a single failure of the dam could result in losing the cooling capability of this source of water. Newly constructed features not required to be designed to withstand the Safe Shutdown Earthquake or the Probable Maximum Flood should at least be designed and constructed to withstand the effects of the Operat ing Basis Earthquake (as defined in 10 CFR Part 100, Appendix A) and waterflow based on severe historical events in the region. The importance of the sink to safety is such that, if during plant operation the capability of the sink is threatened, as for example to permit necessary mainte nance or as a result of damage, restrictions should be placed on plant operation.

The technical specifications should state the actions to be taken in the event the required capability of the sink is temporarily unavailable during plant operation.

For example, the technical specifications should require that (1) NRC be notified if the sink does not satisfy the limiting condition for operation and (2) if its capability cannot be restored to this condition within a reasonable period of time, all units sdrved by the sink be shut down and remain shut down until this capability is restored.

C. REGULATORY

POSITION 1. The ultimate heat sink should be capable of providing sufficient cooling for at least 30 days (a) to permit simultaneous safe shutdown and cooldown of all nuclear reactor units that it serves and to maintain them in a safe shutdown condition, and (b) in the event of an accident in one unit, to limit the effects of that accident safely, to permit simultaneous and safe shutdown of the remaining units, and to maintain them in a safe shutdown condition.

Procedures for ensuring a con tinued capability after 30 days should be available.

Sufficient conservatism should be provided to ensure that a 30-day cooling supply is available and that design basis temperatures of safety-related equipment are not exceeded.

For heat sinks where the supply may be limited and/or the temperature of plant intake water from the sink may eventually become critical (e.g., ponds, lakes, cooling towers, or other sinks where recirculation between plant cooling water discharge and intake can occur), transient analyses*

of supply and/or temperature should be performed.

The meteorological conditions resulting in maximum evaporation and drift loss should be the worst 30-day *For transient analysis of small shallow cooling ponds, use may be made of the analytical techniques and computer programs contained in "Generic Emergency Cooling Pond Analysis," COO-2224-1, May 1972-October

1972, prepared for the USAEC by University of Pennsylvania, School of Engineering and Applied Science, Civil Engineering, Philadelphia, Pennsyl vania 19104. For sinks other than small shallow cooling ponds, similar transient analyses should be performed to demonstrate acceptable inventory and/or maximum intake water temper ature.1.27-3 average combination of controlling parameters (e.g., dewpoint depression, windspeed, solar radiation).

The meteorological conditions resulting in minimum water cooling should be the worst combination of controlling parameters, including diurnal variations where appropriate, for the critical time period(s)

unique to the specific design of the sink. The following are acceptable methods for selecting these conditions:

a. Based on regional climatological*

information, select the most severe observation for the critical time period(s)

for each controlling parameter or parameter combination, with substantiation of the conservatism of these values for site use. The individual conditions may be combined without regard to historical occurrence.

b. Select the most severe combination of control ling parameters, including diurnal variations where appropriate, for the total of the critical time period(s), based on examination of regional climatological*

measurements that are demonstrated to be representa tive of the site. If significantly less than 30 years of representative data are available, other historical regional data should be examined to determine controlling meteorological conditions for the critical time period(s).

If the examination of other historical regional data indicates that the controlling meteorological conditions did not occur within the period of record for the available representative data, then these conditions should be correlated with the available representative data and appropriate adjustments should be made for site conditions.

c. Less severe meteorological conditions may be assumed when it can be demonstrated that the consequences of exceeding lesser design basis conditions for short time periods are acceptable.

Information on magnitude, persistence, and frequency of occurrence of controlling meteorological parameters that exceed the design basis conditions, based on acceptable data as discussed above, should be presented.

The above analysis related to the 30-day cooling supply and the excess temperature should include sufficient information to substantiate the assumptions and analytical methods used. This information should include actual performance data for a similar cooling method operating under load near the specified design conditions or justification that conservative evaporation and drift loss and heat transfer values have been used. A cooling capacity of less than 30 days may be acceptable if it can be demonstrated that replenishment or use of an alternate water supply can be effected to *Climatological in this context pertains to a recent period of record at least 30 years in length.assure the continuous capability of the sink to perform its safety functions, taking into account the availability of replenishment equipment and limitations that may be imposed on "freedom of movement" following an accident or the occurrence of severe natural phenomena.

2. The ultimate heat sink complex, whether com posed of single or multiple water sources, should be capable of withstanding, without loss of the sink safely functions specified in regulatory position 1, the follow ing events: a. The most severe natural phenomena expected at the site, with appropriate ambient conditions, but with no two or more such phenomena occurring simultaneously, b. The site-related events (e.g., transportation accident, river diversion)

that historically have occurred or that may occur during the plant lifetime, c. Reasonably probable combinations of less severe natural phenomena and/or site-related events, d. A single failure of manmade structural features.

Ultimate heat sink features, which are constructed specifically for the nuclear power plant and which are not required to be designed to withstand the Safe Shutdown Earthquake or the Probable Maximum Flood, should at least be designed and constructed to withstand the effects of the Operating Basis Earthquake (as defined in 10 CFR Part 100, Appendix A) and waterflow based on severe historical events in the region. 3. The ultimate heat sink should consist of at least two sources of water, including their retaining struc tures, each with the capability to perform the safety functions specified in regulatory position I, unless it can be demonstrated that there is an extremely low proba bility of losing the capability of a single source. For close-loop cooling systems, there should be at least two aqueducts connecting the source(s)

with the intake structures of the nuclear power units and at least two aqueducts to return the cooling water to the source, unless it can be demonstrated that there is extremely low probability that a single aqueduct can functionally fail entirely as a result of natural or site-related phenomena.

For once-through cooling systems, there should be at least two aqueducts connecting the source(s)

with the intake structures of the nuclear power units and at least two aqueducts to discharge the cooling water well away from the nuclear power plant to ensure that there is no potential for plant flooding by the discharged cooling water, unless it can be demonstrated that there is extremely low probability that a single aqueduct can functionally fail as a result of natural or site-related phenomena.

All water sources and their associated aqueducts should be highly reliable and 27-4 I

should be separated and protected such that failure of any one will not induce failure of any other. 4. The technical specifications for the plant should include provisions for actions to be taken in the event that conditions threaten partial loss of the capability of the ultimate heat sink or the plant temporarily does not satisfy regulatory positions

1 and 3 'during operation.

D. IMPLEMENTATION

The purpose of this section is to provide information to license applicants and licensees regarding the NRC staffs plans for implementing this regulatory guide. This guide reflects current Nuclear Regulatory Com mission practice.

Therefore, except in those cases in which the license applicant or licensee proposes an acceptable alternative method, the method described herein for complying with specified portions of the Commission's regulations is being and will continue to be used in the evaluation of submittals for operating license or construction permit applications until this guide is revised as 'a result of suggestions from the public or additional staff review.1.27-5