| {{#Wiki_filter:}} | | {{#Wiki_filter:ATTACHMENT 5 Summary of Regulatory Commitments The following table identifies commitments made by Exelon Generation Company, LLC (EGC) in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments. |
| | COMMITMENT TYPE COMMITMENT COMMITTED DATE OR "OUTAGE" O NE-T IME A CTION (Yes/No)PROGRAMMATIC (Yes/No)Limitations regarding operation with an inoperable LEFM system will be included in the TRM. Prior to uprate implementation Yes No The LEFM system for LGS, Units 1 and 2 will be installed. |
| | Prior to uprate implementation Yes No Plant maintenance and calibration procedures will be revised to incorporate Camerons maintenance and calibration requirements. |
| | Prior to uprate implementation Yes No Final acceptance of the site-specific uncertainty analyses will occur after the completion of the commissioning process. |
| | Prior to uprate implementation Yes No Modifications for the power uprate will be implemented. |
| | Prior to uprate implementation Yes No Necessary procedure revisions for the power uprate will be completed. |
| | Prior to uprate implementation Yes No The plant simulator will be modified for the uprated conditions and the changes will be |
| | |
| | validated in accordance with plant configuration control processes. |
| | Prior to uprate implementation Yes No Maintenance personnel will be qualified on the LEFM system. |
| | Prior to work on the system No Yes Operator training will be completed prior to implementation of the proposed power uprate changes. Prior to uprate implementation Yes No Plant testing for the proposed changes will be completed as described in Attachment 6, Section 10.4, "Testing." As described Yes No Plant-specific analyses for all potentially limiting events will be performed on a cycle-specific basis as part of the reload licensing |
| | |
| | process. Prior to uprate implementation Yes No}} |
Revision as of 15:03, 19 September 2018
|
---|
Category:- No Document Type Applies
MONTHYEARML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21161A2922021-06-0404 June 2021 NRC-2020-000299 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed ML20332A1092020-11-24024 November 2020 NRC-2020-000299 - Resp 1 - Interim, Agency Records Subject to the Request Are Enclosed (Part 1 of 6) ML20332A1102020-11-24024 November 2020 NRC-2020-000299 - Resp 1 - Interim, Agency Records Subject to the Request Are Enclosed (Part 2 of 6) ML20332A1112020-11-24024 November 2020 NRC-2020-000299 - Resp 1 - Interim, Agency Records Subject to the Request Are Enclosed (Part 3 of 6) ML20332A1122020-11-24024 November 2020 NRC-2020-000299 - Resp 1 - Interim, Agency Records Subject to the Request Are Enclosed (Part 4 of 6) ML20332A1132020-11-24024 November 2020 NRC-2020-000299 - Resp 1 - Interim, Agency Records Subject to the Request Are Enclosed (Part 5 of 6) ML20332A1142020-11-24024 November 2020 NRC-2020-000299 - Resp 1 - Interim, Agency Records Subject to the Request Are Enclosed (Part 6 of 6) RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML20160A3512020-06-0505 June 2020 Document Request for IP 71111.17T (10 CFR 50.59) Team Inspection ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 ML19009A3282019-01-0808 January 2019 NRC-2017-000688 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed (Limerick Generating Station, Units 1 and 2, FHRR - Released Set) ML17152A1692017-05-22022 May 2017 Annual Assessment Meeting Attendance List ML16145A0662016-05-23023 May 2016 Aam Attendance Lists ML15147A0772015-05-21021 May 2015 Aam Attendence Sheet May 21, 2015 RA-15-019, Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2015-03-0202 March 2015 Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15071A1192015-03-0202 March 2015 Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15041A6172015-02-13013 February 2015 Public Notice - NRC Staff Proposes to Amend Operating License at the Limerick Generating Station, Unit 2 ML15020A2082015-01-20020 January 2015 Limerick Public Meeting 2014 Feedback Form #2 from Alliance for a Clean Environment ML15020A1902015-01-20020 January 2015 Public Mtg 2014 Feedback Form #4 from D. Cuthbert, Alliance for a Clean Environment ML14132A2392014-05-0707 May 2014 Annual Assessment Meeting Attendance List for May 7, 2014 ML15120A2292014-03-11011 March 2014 NRC Comments on Fpra FAQ 14-0007, Transient Fire Frequency Likelihood (4/30/2015) ML14029A6452014-01-27027 January 2014 Agency Docketing Statement-Case No. 13-1311 ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13220A0672013-08-0707 August 2013 LTR-13-0660 - Edward Calabrese, University of Massachusetts Email Two Papers Entitled Origin of the Linearity No Threshold Dose-Response Concept and How the Us National Academy of Sciences Misled the World Community on Cancer Risk Assessmen ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML13143A2702013-05-23023 May 2013 ACE Comments at LIM Aam March 21 2013 ML13087A4282013-03-28028 March 2013 Aam Attendee Sign in Sheet - PII Redacted ML12130A1522012-05-0909 May 2012 ACE - Response to Issues Discussed Between NRC and ACE ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1114307272011-05-18018 May 2011 Aam Attendance List, May 18, 2011 ML1014701432010-05-25025 May 2010 Aam Sign-in Attendance List Sheets for Annual Assessment Meeting May 25, 2010 ML1010302182010-04-12012 April 2010 Attachment to E-mail Limerick Mur Acceptance Review - Supplemental Information Needed, Proposed License Amendment Request Regarding Measurement Uncertainty Recapture Power Uprate Request ML1008503992010-03-25025 March 2010 Attachment 4: NRC Regulatory Issue Summary 2002-03 Cross-Reference RIS 2002-03, Attachment 4: NRC Regulatory Issue Summary 2002-03 Cross-Reference2010-03-25025 March 2010 Attachment 4: NRC Regulatory Issue Summary 2002-03 Cross-Reference ML1008504012010-03-25025 March 2010 Attachment 5: Summary of Regulatory Commitments ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0620804052006-07-10010 July 2006 Enclosure 2 - Draft (7/10/2006) on the Nrc'S Concerns and Exelon'S Response to the June 13, 2006 Public Meeting on Exelon'S 5b Submittal ML0613001042006-04-20020 April 2006 Sign-In Sheet for Limerick Annual Assessment Meeting 2022-02-16
[Table view] |
Text
ATTACHMENT 5 Summary of Regulatory Commitments The following table identifies commitments made by Exelon Generation Company, LLC (EGC) in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.
COMMITMENT TYPE COMMITMENT COMMITTED DATE OR "OUTAGE" O NE-T IME A CTION (Yes/No)PROGRAMMATIC (Yes/No)Limitations regarding operation with an inoperable LEFM system will be included in the TRM. Prior to uprate implementation Yes No The LEFM system for LGS, Units 1 and 2 will be installed.
Prior to uprate implementation Yes No Plant maintenance and calibration procedures will be revised to incorporate Camerons maintenance and calibration requirements.
Prior to uprate implementation Yes No Final acceptance of the site-specific uncertainty analyses will occur after the completion of the commissioning process.
Prior to uprate implementation Yes No Modifications for the power uprate will be implemented.
Prior to uprate implementation Yes No Necessary procedure revisions for the power uprate will be completed.
Prior to uprate implementation Yes No The plant simulator will be modified for the uprated conditions and the changes will be
validated in accordance with plant configuration control processes.
Prior to uprate implementation Yes No Maintenance personnel will be qualified on the LEFM system.
Prior to work on the system No Yes Operator training will be completed prior to implementation of the proposed power uprate changes. Prior to uprate implementation Yes No Plant testing for the proposed changes will be completed as described in Attachment 6, Section 10.4, "Testing." As described Yes No Plant-specific analyses for all potentially limiting events will be performed on a cycle-specific basis as part of the reload licensing
process. Prior to uprate implementation Yes No