NRC Generic Letter 1992-07: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
{{#Wiki_filter:-UNITED STATES6 sNUCLEAR REGULATORY COMMISSION'K WASHINGTON, D. C. 20555October 20, 1992TO: All Holders of operating Licenses or Construction Permits forNuclear Power ReactorsSUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION(GENERIC LETTER 92-07)This is to inform you that, effective October 4, 1992, the Office of NuclearReactor Regulation (NRR) was reorganized. The new organization better alignsmanagement of technical activities within the Associate Director forInspection and Technical Assessment (ADT), transfers some functions to theAssociate Director for Projects (ADP), and transfers the responsibility forconducting environmental reviews from ADP to the Associate Director forAdvanced Reactors and License Renewal (ADAR).Some Senior Executive Service (SES) positions have been realigned. The numberof technical divisions remains at six. Responsibility for generic activities,event followup and standard technical specifications has been realigned fromADT to ADP. The organizational change includes realigning six branches,creating a new branch, and consolidating environmental functions into a singlebranch level organization. Individual assignments and tasks are essentiallyunchanged. The new NRR organization chart which depicts the new structure andmanager reporting relationships is enclosed.This generic letter contains no information collection requirements andtherefore is not subject to the requirements of the Paperwork Reduction Act of1980 (44 U.S.C. 3501 et seq.).Ja es G. PartlowAs ociate Director for ProjectsOffice of Nuclear Reactor RegulationEnclosures:1. NRR Organization Chart2. Recently Issued Generic LettersContact: Richard H. Wessman, NRR(301) 504-12029210150342G AC  
{{#Wiki_filter:-UNITED STATES 6 sNUCLEAR REGULATORY  
ENCLOSURE 1OFFICE OF NUCLEAR REACTOR REGULATION ORGANIZATION CHARTCIFFI= OF NUCLEARINEACA SEGLA1DU01OCMIOE WCTO DOOUM E. MURLEYII OU~~ic~com I RA(JMMO MiT. MMJC ME. MIALT. ITAW --lIII INS~wTK IUCENSMb POLICY aRFRANK? P. GESPIERICHARDI H wtsswellI MIASSOMTADIRSCMO JAMUG. PARTLCWI r? 1- -OFRACTORPRO.ECTS-iNImAmiS EVU A VA WAMS~cLl! OPC7OAWEIM T. RLISSELLDIVOONOF SYSTEMSSAFEWANDAAxLYSIDIIETCR ASHIOK CL TRACIANDEUTY DIRCTOR GAUN M. IIOLARMNSENIORACIVISO FAUJSTROSAKwN $arTmS BRANCN CONRADE. MOC&CKAENREC~TOR SYS59S BRANCH R(XERT C, JNECOW(ANMDENTSYSTERSANDSEVERIE VACANTPM0BAB&=CSARElYASSE3SSEW WILLPAMBECKNERBRANCH-1ASSOCIATE OKR FOR ADVANCEDNECTIORS Ak L~IM RENEWAL.ASOIT FCO DENNIS IL CRCFIALD,DEP ASSOCLA'TE CIFCTOR WUWM D~ TRAVER1SLsTmcvmA1ON P.0 ROBERT C PEFUOMLIC. RENEW A ENI REVIEW P.D JOHN W. CRAIGADVAN4E REACTORSP.D. 4AMESELDYMAUITMATDM1O FORREO NCTM .SE A CALVO,PRO0ETOPIE!CmRATE M. ROBERT A, CAPRAPROJI DUCTORXIE 4 CIAIIES L MILLERPIRMTCTOECTORATEI-3 WALTER R. MUTLERPITOJET EETORATE 4 JOHN F. STOLZA~arINWMcTOR FORm9Q~ACTmlA m T A ~ r v ~ r O R _ _ _ _ _ _ _ -S_ _ C. LA M &ASPROJET DIFECTORATE 3IPM&MCI9ECTORA1TE5 IEIBWERTN.X~PRCUJCT'OIECTMRTE34 DAVID MATTHEWSP1:10JET NFECFORATE 54 FRDRC J EIIIICIUOO OF RACTOR PgRam. 1% rV,ADIREI IT SC10U JACKWACWEPRCUECT DIECToAAm 5-1 LEDYAWr.1LMARSHPm0JE TvwE TU TAE 3 FXXV6O, MANEITPROJECT DfCr=T*34 JOHN.X HAN0=OA3SSWAXTWICTOR upR""nowVC~PF OU= DlTlE ATI 2V. JOHN T. LAKISsFIR0JET DFICTORAT! V-I 3ZANNEC, BLACK~T O P E C W I A 1! VT IE ODO PE R. Ot YDIRECTOR aDAX X OWESVETS ASSESSMBIfIfWBRNC AL.RL E C AfEGENEIC COMu.NlCAT10.s BRANCH GAL N. MARCUSTECH4ALSPCFIAT4BRANCH CHRSTOPHE I OWESNO*P0WEl EARFEA&DTORMI SEYMOUR H. WE3IPRIJECOIECTR~ATEIDIVEISMOFENGMEER116BDIRCTOR JAMES E. RK04ADoNDEPTYOF0*TOABOeORARLLAWMATERIASAJ5DCH1ICAL, JAK R. STRDSIDERMEN(IkEB BRANH~s BAC W SCIVIL EN5NM4 ANDGECICIECE COTAN BA=*BRANCHR.ECRICALENGNE BRANCH CAFL H. DBERUNGEMMUC O IAMCTOCOIROLS ANS HIlAN FACTORSDIROECTOR BIRCE A. BOGEREPJTY DIRETOR CMOLO. 7NOMAIN5STRUMENTATKO AND CONTRKXS SCOTT F. NEWBERRYHUMAN ACTOUSASSESSaENT .AhRE&WERIEB R A N C HR N H D R T .G A .UWIOI'OF FEACTOIR INSPECT= AND UCESEEPERFORMANCEDIECO OHALES RDSSDEPTY DIRECTOR ROY ZIMMEANVENDOR lkSPECflc" BRAWNC LEF J. lORROL15MSPECWJI INSPECTION BRANCH EBoENE V. NBROPERORMNCE AOUALITY GARY~ Q 0EEVALUATION BRANCHDWMXM OF RADIATMO SAFElY AM SA1DUAMMIIRCTO FRAINKJ. CONGEDEITY ONETOR EWAAIDJ. BUTCHEREMER(NCY PREA~REEzS BRANcm Roeml A. swClmP"TICM PROTECTION BRANCH LMOIRE UNINMOMSAFEMARD BRANCH PHILLIP F MCKEE  
COMMISSION
ENCLOSURE 2LIST OF RECENTLY ISSUED GENERIC LETTERSGenericLetter No.Subj ectDate ofIssuanceIssued To83-28SUPPTL.MENWTm1REQUIRED ACTIONS BASED ON 10/07/92GENERIC IMPLICATIONS OF SALEMATWS EVENTSALL LIGHT-WATERREACTOR LICENSEESAND APPLICANTS92-06 OPERATOR LICENSING NATIONAL 09/06/92EXAMINATION SCHEDULEALL POWER REACTORLICENSEES ANDAPPLICANTS FOR ANOPERATING LICENSE92-05NRC WORKSHOP ON THESYSTEMATIC ASSESSMENT OFLICENSEE PERFORMANCE(SALP) PROGRAM09/04/92ALL HOLDERS OFOP LICENSES ORCONST. PERMITS FORNUCLEAR PWR REACTORSALL BWR LICENSEESFOF OPERATINGREACTORS92-04RESOLUTION OF THE ISSUES 08/19/92RELATED TO REACTOR VESSELWATER LEVEL INSTRUMENTATION INBWRs PURSUANT TO 10CFR50.54(F)90-02SUPPLEMENT 1ALTERNATIVE REQUIREMENTSFOR FUEL ASSEMBLIES IN THEDESIGN FEATURES SECTION OFTECHNICAL SPECIFICATIONSSAFETY EVALUATION-REPORTNO. 2 ON SQUG GENERICIMPLEMENTATION PROCEDURE,REVISION 2.07/31/9205/22/92ALL LWR LICENSEESAND APPLICANTSALL USI A-46LICENSEES WHOARE SQUG MEMBERS87-02SUPPT.LFMET1_ _ X92-03COMPILATION OF THE CURRENTLICENSING BASIS: REQUESTFOR VOLUNTARY PARTICIPATIONIN PILOT PROGRAM03/19/92ALL NUCLEAR POWERPLANT APPLICANTSAND LICENSEES92-01REVISION 1REACTOR VESSEL STRUCTURALINTEGRITY, 10CFR50.54(f)03/06/92ALL HOLDERS OF OPLICENSES OR CONST.PERMITS FOR NUCLEARPWR PLANTS (EXCEPTYANKEE ATOMIC FORYANKEE NUC PWR STA.)92-02RESOLUTION OF GENERIC 03/06/92ISSUE 79, UNANALYZED REACTORVESSEL (PWR) THERMAL STRESSDURING NATURAL CONVECTIONCOOLDOWNALL HOLDERS OF OPLICENSES OF CONST.PERMITS FOR PWRs October ad, 1992TO: ALL Holders of Operating Licenses or Construction Permits forNuclear Power ReactorsSUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION(GENERIC LETTER 92-07)This is to inform you that, effective October 4, 1992, the Office of NuclearReactqprRegulation (NRR) was reorganized. The new organization better alignsmanagement of technical activities within the Associate Director forInspection and Technical Assessment (ADT), transfers some functions to theAssociate Director for Projects (ADP), and transfers the responsibility forconducting environmental reviews from ADP to the Associate Director forAdvanced Reactors and License Renewal (ADAR).Some Senior Executive Service (SES) positions have been realigned. The numberof technical divisions remains at six. Responsibility for generic activities,event followup and standard technical specifications has been realigned fromADT to ADP. The organizational change includes realigning six branches,creating a new branch, and consolidating environmental functions into a singlebranch level organization. Individual assignments and tasks are essentiallyunchanged. The new NRR organization chart which depicts the new structure andmanager reporting relationships is enclosed.This generic letter contains no information collection requirements andtherefore is not subject to the requirements of the Paperwork Reduction Act of1980 (44 U.S.C. 3501 et seq.).ORIGINAL SIGNED:James G. PartlowAssociate Director for ProjectsOffice of Nuclear Reactor RegulationEnclosures:1. NRR Organization Chart2. Recently Issued Generic LettersContact: Richard H. Wessman, NRR(301) 504-1202DISTRIBUTIONCentral File NRC PDR MRushbrook LBarnett RWessman GMarcusFGillespie JPartlow BGrimes*SEE PREVIOUS CONCURRENCESADM/PMSB* ADM/PMSB* TECH/ED* PMSB/PMAS* D/PMSB* OGCB/DORS*MRushbrrook:bp LBarnett JMain RWessman FGillespie GMarcus10/06/92 10 92 10/6/92 10/8/92 10/8/92 10/9/92D:DORS* AMPBGrimes JParp o10/13/92 10/1- /9OFFICIAL RECORD COPYDOCUMENT NAME: G:\REORG.GL  
'K WASHINGTON, D. C. 20555 October 20, 1992 TO: All Holders of operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION  
TO: All HolderF f Operating Licenses or Constrk ion Permits forNuclear Pow.- ReactorsSUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION(GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you that, effective October 4,1992, the Office of Nuclear Reactor Regulation (NRR) was reorganized.Although the previous NRR organization was basically sound, someorganizational realignments were needed to more effectively provide for theOffice's dual focus role in the oversight of operating reactors and the reviewof advanced plant and license renewal activities.The reorganization has realigned a number of NRR branches and reportinrelationships, but individual assignments and tasks are essentially uchanged.The organizational change includes realigning six branches, creati 'a newbranch, and consolidating environmental functions into a single anch levelorganization. The number of technical divisions remains at si Responsi-bility for generic activities, event followup and standard t nicalspecifications has been realigned from the Associate Direc for Inspectionand Technical Assessment (ADT) to the Associate Director or Projects (ADP).The new organization better aligns management of technifl activities withinADT, transfers some functions to ADP, and transfers tpit responsibility forconducting environmental reviews from ADP to the As ciate Director forAdvanced Reactors and License Renewal (ADAR). So Senior Executive Service(SES) positions have been realigned. The new NRP organization chart whichdepicts the new structure and manager reportin relationships is attached.The organizational change will provide sign icant benefits and enable NRR toconduct its mission more effectively by: onsolidating certain functionswithin individual divisions for more eff ctive resolution of technical issuesand conduct of reviews, improving coor nation of efforts to oversee operatingplants, and yielding a better alignm t between headquarters and fieldactivities.James G. PartlowAssociate Director for ProjectsOffice of Nuclear Reactor RegulationEnclosures:1. NRR Organization Ch t2. Recently Issued G eric LettersContact: Richard .Wessman, NRR(301) 4-1202DISTRIBUTIONCentral Fil NRC PDR MRushbrook LBarnett RWessman GMarcusFGillespi JPartlow BGrimes DIR/PMAS* TECH EDFGillespie Jeff Main*SEE PRVIOUS CONCURRENCES 10/08/92 10/06/92M/ SB ADM/PMSB* TECH/ED* PMSB/PMAS* D/PMSB* OGCB/DORS*b ok:bp LBarnett JMain RWessman FGillespie GMarcus10/6/92 10/6/92 10/8/92 10/8/92 10/9/92ADPB mes JPartlow/ /13/92 10/ /92OFFICIAL RECORD COPYDOCUMENT NAME: G:\REORG.GL  
REORGANIZATION (GENERIC LETTER 92-07)This is to inform you that, effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorganized.
TO:All Holder.- f Operating Licenses or Constrt ion Permits forNuclear Poh.-- ReactorsSUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION(GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you th , effective October 4,1992, the Office of Nuclear Reactor Regulation (NRR) a reorganized.Although the previous NRR organization was basically 6 und, someorganizational realignments were needed to more eff tively provide for theOffice's dual focus role in the oversight of operang reactors and the reviewof advanced plant and license renewal activities .The reorganization has realigned a number of N branches and reportingrelationships, but individual assignments and sks are essentially unchanged.The organizational change includes realignin ix branches, creating a newbranch, and consolidating environmental fun ons into a single branch levelorganization. The number of technical divi ons remains at six, with theDivision of Operational Events Assessment ving from the Associate Directorfor Inspection and Technical Assessment ( T) to the Associate Director forProjects (ADP). The new organization be er aligns management of technicalactivities within ADT, transfers some f ctions to ADP, and transfers theresponsibility for conducting environm 'tal reviews from ADP to the AssociateDirector for Advanced Reactors and Li se Renewal (ADAR). Some SeniorExecutive Service (SES) positions hay been realigned. The new NRRorganization chart which depicts the ew structure and manager reportingrelationships is attached.The organizational change will pro de significant benefits and enable NRR toconduct its mission more effectiv )y by: consolidating certain functionswithin individual divisions for Ae effective resolution of technical issuesand conduct of reviews, improvin coordination of efforts to oversee operatingplants, and yielding a better a gnment between headquarters and fieldactivities.James G. PartlowAssociate Director for ProjectsOffice of Nuclear Reactor RegulationEnclosures:1. NRR Organization Chart2. Recently Issued Generi LettersContact: Richard H. Wess an, NRR(301) 504-1202DISTRIBUTIONCentral FileFGillespieNRC PdR MRushbrookowLBarnett RWessmanDIR/PMAS*FGillespie10/08/92GMarcusTECH EDJeff Main10/06/92*SEE PREVIOUS CONCURRAICEOFFICE: ADM/PMSB* ADM/PMSB* PMSB/PMAS* OGCB/DORS ADPRNAME: MRushbrook Ap LBarnett RWessman GMarcus y e JPartlowDATE: 10/06/92 10/06/92 10/08/92 10/q /92 10/ /92.aOFFICIALDOCUMENTRECORD COPYNAME: G:\REORG.GL  
 
TO: All Holders-f Operating Licenses or Construction Permits forNuclear Power ReactorsSUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION(GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you that, effectiv ctober 4,1992, the Office of Nuclear Reactor Regulation (NRR) was reorgan ed.Although the previous NRR organization was basically sound, soorganizational realignments were needed to more effectively ovide for theOffice's dual focus role in the oversight of operating rea ors and the reviewof advanced plant and license renewal activities.The reorganization has realigned a number of NRR bra es and reportingrelationships, but individual assignments and tasks re essentially unchanged.The organizational change includes realigning six ranches, creating a newbranch, and consolidating environmental functio into a single branch levelorganization. The number of technical divisio remains at six, with theDivision of Operational Events Assessment mo ng from the Associate Directorfor Inspection and Technical Assessment (A to the Associate Director forProjects (ADP). The new organization be r aligns management of technicalactivities within ADT, transfers some f ctions to ADP, and transfers theresponsibility for conducting environ ntal reviews from ADP to the AssociateDirector for Advanced Reactors and I ense Renewal (ADAR). Some SeniorExecutive Service (SES) positions ye been realigned to better utilize themanagerial skills of individuals certain key positions. The new NRRorganization chart which depict the new structure and manager reportingrelationships is attached.The organizational change 1 provide significant benefits and enable NRR toconduct its mission more fectively by: consolidating certain functionswithin individual divisi ns for more effective resolution of technical issuesand conduct of reviews improving coordination of efforts to oversee operatingplants, and yielding better alignment between headquarters and fieldactivities.James G. PartlowAssociate Director for ProjectsOffice of Nuclear Reactor RegulationEnclosures:1. NRR Or nization Chart2. Recen y Issued Generic LettersContac v Richard H. Wessman, NRR(301) 504-1202TINIBUTIONCe tral File NRC PDR MRushbrook LBarnett RWessman GMarcusF illespie JPartlow a d dPMAS V4 TECH EDFGI1 2Sie Nc9b Jeff Main*SEE PREVIOUS CONCURRENCE 10 92 10/06/92E OFFICE: ADM/PMSB* ADM/P PMSB/ m S OGCB/DORS ADPRNAME: MRushbrook:b f i RWAS n GMarcus JPartlowDATE: 10/06/92 1O/0t92 10/1 /92 10/ /92 10/ /92OFFICIAL RECORD COPY -.DOCUMENT NAME: G:\REORG.GL  
The new organization better aligns management of technical activities within the Associate Director for Inspection and Technical Assessment (ADT), transfers some functions to the Associate Director for Projects (ADP), and transfers the responsibility for conducting environmental reviews from ADP to the Associate Director for Advanced Reactors and License Renewal (ADAR).Some Senior Executive Service (SES) positions have been realigned.
Multiple Addresses -2 -For further information on the details of the NRR reorganization /refer toSECY-92-279 "Reorganization of NRR," as approved by the Commis /on onAugust 12, 1992. /Sincerely,James G. Part owAssociate (rector for ProjectsOffice o uclear Reactor RegulationEnclosure:NRR Organization Chart
 
The number of technical divisions remains at six. Responsibility for generic activities, event followup and standard technical specifications has been realigned from ADT to ADP. The organizational change includes realigning six branches, creating a new branch, and consolidating environmental functions into a single branch level organization.
 
Individual assignments and tasks are essentially unchanged.
 
The new NRR organization chart which depicts the new structure and manager reporting relationships is enclosed.This generic letter contains no information collection requirements and therefore is not subject to the requirements of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.).Ja es G. Partlow As ociate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Organization Chart 2. Recently Issued Generic Letters Contact: Richard H. Wessman, NRR (301) 504-1202 9210150342 G AC  
ENCLOSURE  
1 OFFICE OF NUCLEAR REACTOR REGULATION  
ORGANIZATION  
CHART CIFFI= OF NUCLEARINEACA  
SEGLA1DU 01OCMIOE WCTO DOOUM E. MURLEYI I OU~~ic~com I RA(J MMO MiT. MMJC ME. MIALT. ITAW --lI I I INS~wTK IUCENSMb POLICY aR FRANK? P. GESPIE RICHARDI H wtsswell I MI ASSOMTADIRSCMO
JAMUG. PARTLCW I r? 1- -OFRACTORPRO.ECTS-iN
I mAmi S EVU A VA WA MS~cLl! OPC7OAWEIM  
T. RLISSELL DIVOONOF SYSTEMSSAFEWANDAAxLYSI
DIIETCR ASHIOK CL TRACIAN DEUTY DIRCTOR GAUN M. IIOLARMN SENIORACIVISO
FAUJSTROSA
KwN $arTmS BRANCN CONRADE. MOC&CKAEN REC~TOR SYS59S BRANCH R(XERT C, JNE COW(ANMDENTSYSTERSANDSEVERIE  
VACANT PM0BAB&=CSARElYASSE3SSEW  
WILLPAMBECKNER
BRANCH-1 ASSOCIATE
OKR FOR ADVANCED NECTIORS Ak L~IM RENEWAL.ASOIT FCO DENNIS IL CRCFIALD, DEP ASSOCLA'TE  
CIFCTOR WUWM D~ TRAVER1S LsTmcvmA1ON
P.0 ROBERT C PEFUOM LIC. RENEW A ENI REVIEW P.D JOHN W. CRAIG ADVAN4E REACTORSP.D.
 
4AMESELDYM
AUITMATDM1O
FORREO NCTM .SE A CALVO, PRO0ETOPIE!CmRATE  
M. ROBERT A, CAPRA PROJI DUCTORXIE  
4 CIAIIES L MILLER PIRMTCTOECTORATEI-3 WALTER R. MUTLER PITOJET EETORATE 4 JOHN F. STOLZ A~arINWMcTOR  
FORm9Q~ACTml A m T A ~ r v ~ r O R _ _ _ _ _ _ _ -S_ _ C. LA M &AS PROJET DIFECTORATE  
3I PM&MCI9ECTORA1TE5 IEIBWERTN.X~
PRCUJCT'OIECTMRTE34 DAVID MATTHEWS P1:10JET NFECFORATE  
54 FRDRC J EI I I I CIUOO OF RACTOR PgRam. 1% rV, ADIREI IT SC10U JACKWACWE PRCUECT DIECToAAm  
5-1 LEDYAWr.1LMARSH
Pm0JE TvwE TU TAE 3 FXXV6O, MANEIT PROJECT DfCr=T*34 JOHN.X HAN0=O A3SSWAXTWICTOR
upR""nowVC~
PF OU= DlTlE ATI 2V. JOHN T. LAKISs FIR0JET DFICTORAT!  
V-I 3ZANNEC, BLACK~T O P E C W I A 1! VT IE ODO PE R. Ot Y DIRECTOR aDAX X OWES VETS ASSESSMBIfIfWBRNC  
AL.RL E C AfE GENEIC COMu.NlCAT10.s BRANCH GAL N. MARCUS TECH4ALSPCFIAT4BRANCH
CHRSTOPHE  
I OWES NO*P0WEl EARFEA&DTORMI  
SEYMOUR H. WE3I PRIJECOIECTR~ATE
I DIVEISMOFENGMEER116B
DIRCTOR JAMES E. RK04ADoN DEPTYOF0*TOABOeORARLLAW
MATERIASAJ5DCH1ICAL, JAK R. STRDSIDER MEN(IkEB BRANH~s BAC W S CIVIL EN5NM4 ANDGECICIECE  
COTAN BA=*BRANCH R.ECRICALENGNE  
BRANCH CAFL H. DBERUNGE MMUC O IAMCTOCOIROLS  
ANS HIlAN FACTORS DIROECTOR
BIRCE A. BOGER EPJTY DIRETOR CMOLO. 7NOMA IN5STRUMENTATKO
AND CONTRKXS SCOTT F. NEWBERRY HUMAN ACTOUSASSESSaENT .AhRE&WERIE
B R A N C HR N H D R T .G A .UWIOI'OF FEACTOIR INSPECT= AND UCESEEPERFORMANCE
DIECO OHALES RDSS DEPTY DIRECTOR ROY ZIMMEAN VENDOR lkSPECflc" BRAWNC LEF J. lORROL15M SPECWJI INSPECTION  
BRANCH EBoENE V. NBRO PERORMNCE
AOUALITY GARY~ Q 0E EVALUATION
BRANCH DWMXM OF RADIATMO SAFElY AM SA1DUAMM IIRCTO FRAINKJ. CONGE DEITY ONETOR EWAAIDJ. BUTCHER EMER(NCY PREA~REEzS  
BRANcm Roeml A. swClm P"TICM PROTECTION  
BRANCH LMOIRE UNINMOM SAFEMARD BRANCH PHILLIP F MCKEE  
ENCLOSURE  
2 LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No.Subj ect Date of Issuance Issued To 83-28 SUPPTL.MENWTm
1 REQUIRED ACTIONS BASED ON 10/07/92 GENERIC IMPLICATIONS  
OF SALEM ATWS EVENTS ALL LIGHT-WATER
REACTOR LICENSEES AND APPLICANTS
92-06 OPERATOR LICENSING  
NATIONAL 09/06/92 EXAMINATION
SCHEDULE ALL POWER REACTOR LICENSEES
AND APPLICANTS
FOR AN OPERATING
LICENSE 92-05 NRC WORKSHOP ON THE SYSTEMATIC
ASSESSMENT  
OF LICENSEE PERFORMANCE (SALP) PROGRAM 09/04/92 ALL HOLDERS OF OP LICENSES OR CONST. PERMITS FOR NUCLEAR PWR REACTORS ALL BWR LICENSEES FOF OPERATING REACTORS 92-04 RESOLUTION
OF THE ISSUES 08/19/92 RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION  
IN BWRs PURSUANT TO 10CFR50.54(F)
90-02 SUPPLEMENT
1 ALTERNATIVE
REQUIREMENTS
FOR FUEL ASSEMBLIES  
IN THE DESIGN FEATURES SECTION OF TECHNICAL
SPECIFICATIONS
SAFETY EVALUATION-REPORT
NO. 2 ON SQUG GENERIC IMPLEMENTATION
PROCEDURE, REVISION 2.07/31/92 05/22/92 ALL LWR LICENSEES AND APPLICANTS
ALL USI A-46 LICENSEES
WHO ARE SQUG MEMBERS 87-02 SUPPT.LFMET
1_ _ X 92-03 COMPILATION
OF THE CURRENT LICENSING
BASIS: REQUEST FOR VOLUNTARY  
PARTICIPATION
IN PILOT PROGRAM 03/19/92 ALL NUCLEAR POWER PLANT APPLICANTS
AND LICENSEES 92-01 REVISION 1 REACTOR VESSEL STRUCTURAL
INTEGRITY, 10CFR50.54(f)
03/06/92 ALL HOLDERS OF OP LICENSES OR CONST.PERMITS FOR NUCLEAR PWR PLANTS (EXCEPT YANKEE ATOMIC FOR YANKEE NUC PWR STA.)92-02 RESOLUTION
OF GENERIC 03/06/92 ISSUE 79, UNANALYZED  
REACTOR VESSEL (PWR) THERMAL STRESS DURING NATURAL CONVECTION
COOLDOWN ALL HOLDERS OF OP LICENSES OF CONST.PERMITS FOR PWRs October ad, 1992 TO: ALL Holders of Operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION  
REORGANIZATION (GENERIC LETTER 92-07)This is to inform you that, effective October 4, 1992, the Office of Nuclear ReactqprRegulation (NRR) was reorganized.
 
The new organization better aligns management of technical activities within the Associate Director for Inspection and Technical Assessment (ADT), transfers some functions to the Associate Director for Projects (ADP), and transfers the responsibility for conducting environmental reviews from ADP to the Associate Director for Advanced Reactors and License Renewal (ADAR).Some Senior Executive Service (SES) positions have been realigned.
 
The number of technical divisions remains at six. Responsibility for generic activities, event followup and standard technical specifications has been realigned from ADT to ADP. The organizational change includes realigning six branches, creating a new branch, and consolidating environmental functions into a single branch level organization.
 
Individual assignments and tasks are essentially unchanged.
 
The new NRR organization chart which depicts the new structure and manager reporting relationships is enclosed.This generic letter contains no information collection requirements and therefore is not subject to the requirements of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.).ORIGINAL SIGNED: James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Organization Chart 2. Recently Issued Generic Letters Contact: Richard H. Wessman, NRR (301) 504-1202 DISTRIBUTION
Central File NRC PDR MRushbrook LBarnett RWessman GMarcus FGillespie JPartlow BGrimes*SEE PREVIOUS CONCURRENCES
ADM/PMSB*  
ADM/PMSB*  
TECH/ED* PMSB/PMAS*  
D/PMSB* OGCB/DORS*
MRushbrrook:bp LBarnett JMain RWessman FGillespie GMarcus 10/06/92 10 92 10/6/92 10/8/92 10/8/92 10/9/92 D:DORS* AMP BGrimes JParp o 10/13/92 10/1- /9 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL  
TO: All HolderF f Operating Licenses or Constrk ion Permits for Nuclear Pow.- Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION  
REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you that, effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorganized.
 
Although the previous NRR organization was basically sound, some organizational realignments were needed to more effectively provide for the Office's dual focus role in the oversight of operating reactors and the review of advanced plant and license renewal activities.
 
The reorganization has realigned a number of NRR branches and reportin relationships, but individual assignments and tasks are essentially uchanged.The organizational change includes realigning six branches, creati 'a new branch, and consolidating environmental functions into a single anch level organization.
 
The number of technical divisions remains at si Responsi-bility for generic activities, event followup and standard t nical specifications has been realigned from the Associate Direc for Inspection and Technical Assessment (ADT) to the Associate Director or Projects (ADP).The new organization better aligns management of technifl activities within ADT, transfers some functions to ADP, and transfers tpit responsibility for conducting environmental reviews from ADP to the As ciate Director for Advanced Reactors and License Renewal (ADAR). So Senior Executive Service (SES) positions have been realigned.
 
The new NRP organization chart which depicts the new structure and manager reportin relationships is attached.The organizational change will provide sign icant benefits and enable NRR to conduct its mission more effectively by: onsolidating certain functions within individual divisions for more eff ctive resolution of technical issues and conduct of reviews, improving coor nation of efforts to oversee operating plants, and yielding a better alignm t between headquarters and field activities.
 
James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Organization Ch t 2. Recently Issued G eric Letters Contact: Richard .Wessman, NRR (301) 4-1202 DISTRIBUTION
Central Fil NRC PDR MRushbrook LBarnett RWessman GMarcus FGillespi JPartlow BGrimes DIR/PMAS*  
TECH ED FGillespie Jeff Main*SEE PRVIOUS CONCURRENCES  
10/08/92 10/06/92 M/ SB ADM/PMSB*  
TECH/ED* PMSB/PMAS*  
D/PMSB* OGCB/DORS*
b ok:bp LBarnett JMain RWessman FGillespie GMarcus 10/6/92 10/6/92 10/8/92 10/8/92 10/9/92 ADP B mes JPartlow/ /13/92 10/ /92 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL  
TO: All Holder.- f Operating Licenses or Constrt ion Permits for Nuclear Poh.-- Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION  
REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you th , effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) a reorganized.
 
Although the previous NRR organization was basically  
6 und, some organizational realignments were needed to more eff tively provide for the Office's dual focus role in the oversight of operang reactors and the review of advanced plant and license renewal activities  
.The reorganization has realigned a number of N branches and reporting relationships, but individual assignments and sks are essentially unchanged.
 
The organizational change includes realignin ix branches, creating a new branch, and consolidating environmental fun ons into a single branch level organization.
 
The number of technical divi ons remains at six, with the Division of Operational Events Assessment ving from the Associate Director for Inspection and Technical Assessment ( T) to the Associate Director for Projects (ADP). The new organization be er aligns management of technical activities within ADT, transfers some f ctions to ADP, and transfers the responsibility for conducting environm 'tal reviews from ADP to the Associate Director for Advanced Reactors and Li se Renewal (ADAR). Some Senior Executive Service (SES) positions hay been realigned.
 
The new NRR organization chart which depicts the ew structure and manager reporting relationships is attached.The organizational change will pro de significant benefits and enable NRR to conduct its mission more effectiv )y by: consolidating certain functions within individual divisions for Ae effective resolution of technical issues and conduct of reviews, improvin coordination of efforts to oversee operating plants, and yielding a better a gnment between headquarters and field activities.
 
James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Organization Chart 2. Recently Issued Generi Letters Contact: Richard H. Wess an, NRR (301) 504-1202 DISTRIBUTION
Central File FGillespie NRC PdR MRushbrook ow LBarnett RWessman DIR/PMAS*FGillespie
10/08/92 GMarcus TECH ED Jeff Main 10/06/92*SEE PREVIOUS CONCURRAICE
OFFICE: ADM/PMSB*  
ADM/PMSB*  
PMSB/PMAS*  
OGCB/DORS  
ADPR NAME: MRushbrook Ap LBarnett RWessman GMarcus y e JPartlow DATE: 10/06/92 10/06/92 10/08/92 10/q /92 10/ /92.a OFFICIAL DOCUMENT RECORD COPY NAME: G:\REORG.GL  
TO: All Holders-f Operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION  
REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you that, effectiv ctober 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorgan ed.Although the previous NRR organization was basically sound, so organizational realignments were needed to more effectively ovide for the Office's dual focus role in the oversight of operating rea ors and the review of advanced plant and license renewal activities.
 
The reorganization has realigned a number of NRR bra es and reporting relationships, but individual assignments and tasks re essentially unchanged.
 
The organizational change includes realigning six ranches, creating a new branch, and consolidating environmental functio into a single branch level organization.
 
The number of technical divisio remains at six, with the Division of Operational Events Assessment mo ng from the Associate Director for Inspection and Technical Assessment (A to the Associate Director for Projects (ADP). The new organization be r aligns management of technical activities within ADT, transfers some f ctions to ADP, and transfers the responsibility for conducting environ ntal reviews from ADP to the Associate Director for Advanced Reactors and I ense Renewal (ADAR). Some Senior Executive Service (SES) positions ye been realigned to better utilize the managerial skills of individuals certain key positions.
 
The new NRR organization chart which depict the new structure and manager reporting relationships is attached.The organizational change 1 provide significant benefits and enable NRR to conduct its mission more fectively by: consolidating certain functions within individual divisi ns for more effective resolution of technical issues and conduct of reviews improving coordination of efforts to oversee operating plants, and yielding better alignment between headquarters and field activities.
 
James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Or nization Chart 2. Recen y Issued Generic Letters Contac v Richard H. Wessman, NRR (301) 504-1202 TINIBUTION
Ce tral File NRC PDR MRushbrook LBarnett RWessman GMarcus F illespie JPartlow a d dPMAS V4 TECH ED FGI1 2Sie Nc9b Jeff Main*SEE PREVIOUS CONCURRENCE  
10 92 10/06/92 E OFFICE: ADM/PMSB*  
ADM/P PMSB/ m S OGCB/DORS  
ADPR NAME: MRushbrook:b f i RWAS n GMarcus JPartlow DATE: 10/06/92 1O/0t92 10/1 /92 10/ /92 10/ /92 OFFICIAL RECORD COPY -.DOCUMENT NAME: G:\REORG.GL  
Multiple Addresses  
-2 -For further information on the details of the NRR reorganization  
/refer to SECY-92-279 "Reorganization of NRR," as approved by the Commis /on on August 12, 1992. /Sincerely, James G. Part ow Associate (rector for Projects Office o uclear Reactor Regulation Enclosure:
NRR Organization Chart  


==CONTACT==
==CONTACT==
: Richard H. Wessman, NRR(301) 504-1202DISTRIBUTIONCentral File pcpDCMRushbrookLBarnettRWessman fGMarcus /FGillespieJPartlowr kei4; 1XiFFICE: ADM/PMSB ADM PMSB/PMAS OGCB/DORS ADPRNAME: MR:us b kkb{ RWessman GMarcus JPartlowDATE: 10/kj/92 10/4 /92 10/ /92 1o/ /92 10/ /92OFFICIAL RECORD COPYDOCUMENT NAME: G:\REORG.GL  
: Richard H. Wessman, NRR (301) 504-1202 DISTRIBUTION
}}
Central File pcpDC MRushbrook LBarnett RWessman f GMarcus /FGillespie JPartlow r kei4; 1X iFFICE: ADM/PMSB ADM PMSB/PMAS  
OGCB/DORS  
ADPR NAME: MR:us b kkb{ RWessman GMarcus JPartlow DATE: 10/kj/92 10/4 /92 10/ /92 1o/ /92 10/ /92 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL}}


{{GL-Nav}}
{{GL-Nav}}

Revision as of 12:44, 31 August 2018

NRC Generic Letter 1992-007 - Office of Nuclear Reactor Regulation Reorganization
ML031130418
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane  Entergy icon.png
Issue date: 10/20/1992
From: Partlow J G
Office of Nuclear Reactor Regulation
To:
References
GL-92-007, NUDOCS 9210150342
Download: ML031130418 (8)


-UNITED STATES 6 sNUCLEAR REGULATORY

COMMISSION

'K WASHINGTON, D. C. 20555 October 20, 1992 TO: All Holders of operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92-07)This is to inform you that, effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorganized.

The new organization better aligns management of technical activities within the Associate Director for Inspection and Technical Assessment (ADT), transfers some functions to the Associate Director for Projects (ADP), and transfers the responsibility for conducting environmental reviews from ADP to the Associate Director for Advanced Reactors and License Renewal (ADAR).Some Senior Executive Service (SES) positions have been realigned.

The number of technical divisions remains at six. Responsibility for generic activities, event followup and standard technical specifications has been realigned from ADT to ADP. The organizational change includes realigning six branches, creating a new branch, and consolidating environmental functions into a single branch level organization.

Individual assignments and tasks are essentially unchanged.

The new NRR organization chart which depicts the new structure and manager reporting relationships is enclosed.This generic letter contains no information collection requirements and therefore is not subject to the requirements of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.).Ja es G. Partlow As ociate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Organization Chart 2. Recently Issued Generic Letters Contact: Richard H. Wessman, NRR (301) 504-1202 9210150342 G AC

ENCLOSURE

1 OFFICE OF NUCLEAR REACTOR REGULATION

ORGANIZATION

CHART CIFFI= OF NUCLEARINEACA

SEGLA1DU 01OCMIOE WCTO DOOUM E. MURLEYI I OU~~ic~com I RA(J MMO MiT. MMJC ME. MIALT. ITAW --lI I I INS~wTK IUCENSMb POLICY aR FRANK? P. GESPIE RICHARDI H wtsswell I MI ASSOMTADIRSCMO

JAMUG. PARTLCW I r? 1- -OFRACTORPRO.ECTS-iN

I mAmi S EVU A VA WA MS~cLl! OPC7OAWEIM

T. RLISSELL DIVOONOF SYSTEMSSAFEWANDAAxLYSI

DIIETCR ASHIOK CL TRACIAN DEUTY DIRCTOR GAUN M. IIOLARMN SENIORACIVISO

FAUJSTROSA

KwN $arTmS BRANCN CONRADE. MOC&CKAEN REC~TOR SYS59S BRANCH R(XERT C, JNE COW(ANMDENTSYSTERSANDSEVERIE

VACANT PM0BAB&=CSARElYASSE3SSEW

WILLPAMBECKNER

BRANCH-1 ASSOCIATE

OKR FOR ADVANCED NECTIORS Ak L~IM RENEWAL.ASOIT FCO DENNIS IL CRCFIALD, DEP ASSOCLA'TE

CIFCTOR WUWM D~ TRAVER1S LsTmcvmA1ON

P.0 ROBERT C PEFUOM LIC. RENEW A ENI REVIEW P.D JOHN W. CRAIG ADVAN4E REACTORSP.D.

4AMESELDYM

AUITMATDM1O

FORREO NCTM .SE A CALVO, PRO0ETOPIE!CmRATE

M. ROBERT A, CAPRA PROJI DUCTORXIE

4 CIAIIES L MILLER PIRMTCTOECTORATEI-3 WALTER R. MUTLER PITOJET EETORATE 4 JOHN F. STOLZ A~arINWMcTOR

FORm9Q~ACTml A m T A ~ r v ~ r O R _ _ _ _ _ _ _ -S_ _ C. LA M &AS PROJET DIFECTORATE

3I PM&MCI9ECTORA1TE5 IEIBWERTN.X~

PRCUJCT'OIECTMRTE34 DAVID MATTHEWS P1:10JET NFECFORATE

54 FRDRC J EI I I I CIUOO OF RACTOR PgRam. 1% rV, ADIREI IT SC10U JACKWACWE PRCUECT DIECToAAm

5-1 LEDYAWr.1LMARSH

Pm0JE TvwE TU TAE 3 FXXV6O, MANEIT PROJECT DfCr=T*34 JOHN.X HAN0=O A3SSWAXTWICTOR

upR""nowVC~

PF OU= DlTlE ATI 2V. JOHN T. LAKISs FIR0JET DFICTORAT!

V-I 3ZANNEC, BLACK~T O P E C W I A 1! VT IE ODO PE R. Ot Y DIRECTOR aDAX X OWES VETS ASSESSMBIfIfWBRNC

AL.RL E C AfE GENEIC COMu.NlCAT10.s BRANCH GAL N. MARCUS TECH4ALSPCFIAT4BRANCH

CHRSTOPHE

I OWES NO*P0WEl EARFEA&DTORMI

SEYMOUR H. WE3I PRIJECOIECTR~ATE

I DIVEISMOFENGMEER116B

DIRCTOR JAMES E. RK04ADoN DEPTYOF0*TOABOeORARLLAW

MATERIASAJ5DCH1ICAL, JAK R. STRDSIDER MEN(IkEB BRANH~s BAC W S CIVIL EN5NM4 ANDGECICIECE

COTAN BA=*BRANCH R.ECRICALENGNE

BRANCH CAFL H. DBERUNGE MMUC O IAMCTOCOIROLS

ANS HIlAN FACTORS DIROECTOR

BIRCE A. BOGER EPJTY DIRETOR CMOLO. 7NOMA IN5STRUMENTATKO

AND CONTRKXS SCOTT F. NEWBERRY HUMAN ACTOUSASSESSaENT .AhRE&WERIE

B R A N C HR N H D R T .G A .UWIOI'OF FEACTOIR INSPECT= AND UCESEEPERFORMANCE

DIECO OHALES RDSS DEPTY DIRECTOR ROY ZIMMEAN VENDOR lkSPECflc" BRAWNC LEF J. lORROL15M SPECWJI INSPECTION

BRANCH EBoENE V. NBRO PERORMNCE

AOUALITY GARY~ Q 0E EVALUATION

BRANCH DWMXM OF RADIATMO SAFElY AM SA1DUAMM IIRCTO FRAINKJ. CONGE DEITY ONETOR EWAAIDJ. BUTCHER EMER(NCY PREA~REEzS

BRANcm Roeml A. swClm P"TICM PROTECTION

BRANCH LMOIRE UNINMOM SAFEMARD BRANCH PHILLIP F MCKEE

ENCLOSURE

2 LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No.Subj ect Date of Issuance Issued To 83-28 SUPPTL.MENWTm

1 REQUIRED ACTIONS BASED ON 10/07/92 GENERIC IMPLICATIONS

OF SALEM ATWS EVENTS ALL LIGHT-WATER

REACTOR LICENSEES AND APPLICANTS

92-06 OPERATOR LICENSING

NATIONAL 09/06/92 EXAMINATION

SCHEDULE ALL POWER REACTOR LICENSEES

AND APPLICANTS

FOR AN OPERATING

LICENSE 92-05 NRC WORKSHOP ON THE SYSTEMATIC

ASSESSMENT

OF LICENSEE PERFORMANCE (SALP) PROGRAM 09/04/92 ALL HOLDERS OF OP LICENSES OR CONST. PERMITS FOR NUCLEAR PWR REACTORS ALL BWR LICENSEES FOF OPERATING REACTORS 92-04 RESOLUTION

OF THE ISSUES 08/19/92 RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION

IN BWRs PURSUANT TO 10CFR50.54(F)

90-02 SUPPLEMENT

1 ALTERNATIVE

REQUIREMENTS

FOR FUEL ASSEMBLIES

IN THE DESIGN FEATURES SECTION OF TECHNICAL

SPECIFICATIONS

SAFETY EVALUATION-REPORT

NO. 2 ON SQUG GENERIC IMPLEMENTATION

PROCEDURE, REVISION 2.07/31/92 05/22/92 ALL LWR LICENSEES AND APPLICANTS

ALL USI A-46 LICENSEES

WHO ARE SQUG MEMBERS 87-02 SUPPT.LFMET

1_ _ X 92-03 COMPILATION

OF THE CURRENT LICENSING

BASIS: REQUEST FOR VOLUNTARY

PARTICIPATION

IN PILOT PROGRAM 03/19/92 ALL NUCLEAR POWER PLANT APPLICANTS

AND LICENSEES 92-01 REVISION 1 REACTOR VESSEL STRUCTURAL

INTEGRITY, 10CFR50.54(f)

03/06/92 ALL HOLDERS OF OP LICENSES OR CONST.PERMITS FOR NUCLEAR PWR PLANTS (EXCEPT YANKEE ATOMIC FOR YANKEE NUC PWR STA.)92-02 RESOLUTION

OF GENERIC 03/06/92 ISSUE 79, UNANALYZED

REACTOR VESSEL (PWR) THERMAL STRESS DURING NATURAL CONVECTION

COOLDOWN ALL HOLDERS OF OP LICENSES OF CONST.PERMITS FOR PWRs October ad, 1992 TO: ALL Holders of Operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92-07)This is to inform you that, effective October 4, 1992, the Office of Nuclear ReactqprRegulation (NRR) was reorganized.

The new organization better aligns management of technical activities within the Associate Director for Inspection and Technical Assessment (ADT), transfers some functions to the Associate Director for Projects (ADP), and transfers the responsibility for conducting environmental reviews from ADP to the Associate Director for Advanced Reactors and License Renewal (ADAR).Some Senior Executive Service (SES) positions have been realigned.

The number of technical divisions remains at six. Responsibility for generic activities, event followup and standard technical specifications has been realigned from ADT to ADP. The organizational change includes realigning six branches, creating a new branch, and consolidating environmental functions into a single branch level organization.

Individual assignments and tasks are essentially unchanged.

The new NRR organization chart which depicts the new structure and manager reporting relationships is enclosed.This generic letter contains no information collection requirements and therefore is not subject to the requirements of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.).ORIGINAL SIGNED: James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Organization Chart 2. Recently Issued Generic Letters Contact: Richard H. Wessman, NRR (301) 504-1202 DISTRIBUTION

Central File NRC PDR MRushbrook LBarnett RWessman GMarcus FGillespie JPartlow BGrimes*SEE PREVIOUS CONCURRENCES

ADM/PMSB*

ADM/PMSB*

TECH/ED* PMSB/PMAS*

D/PMSB* OGCB/DORS*

MRushbrrook:bp LBarnett JMain RWessman FGillespie GMarcus 10/06/92 10 92 10/6/92 10/8/92 10/8/92 10/9/92 D:DORS* AMP BGrimes JParp o 10/13/92 10/1- /9 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL

TO: All HolderF f Operating Licenses or Constrk ion Permits for Nuclear Pow.- Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you that, effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorganized.

Although the previous NRR organization was basically sound, some organizational realignments were needed to more effectively provide for the Office's dual focus role in the oversight of operating reactors and the review of advanced plant and license renewal activities.

The reorganization has realigned a number of NRR branches and reportin relationships, but individual assignments and tasks are essentially uchanged.The organizational change includes realigning six branches, creati 'a new branch, and consolidating environmental functions into a single anch level organization.

The number of technical divisions remains at si Responsi-bility for generic activities, event followup and standard t nical specifications has been realigned from the Associate Direc for Inspection and Technical Assessment (ADT) to the Associate Director or Projects (ADP).The new organization better aligns management of technifl activities within ADT, transfers some functions to ADP, and transfers tpit responsibility for conducting environmental reviews from ADP to the As ciate Director for Advanced Reactors and License Renewal (ADAR). So Senior Executive Service (SES) positions have been realigned.

The new NRP organization chart which depicts the new structure and manager reportin relationships is attached.The organizational change will provide sign icant benefits and enable NRR to conduct its mission more effectively by: onsolidating certain functions within individual divisions for more eff ctive resolution of technical issues and conduct of reviews, improving coor nation of efforts to oversee operating plants, and yielding a better alignm t between headquarters and field activities.

James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Organization Ch t 2. Recently Issued G eric Letters Contact: Richard .Wessman, NRR (301) 4-1202 DISTRIBUTION

Central Fil NRC PDR MRushbrook LBarnett RWessman GMarcus FGillespi JPartlow BGrimes DIR/PMAS*

TECH ED FGillespie Jeff Main*SEE PRVIOUS CONCURRENCES

10/08/92 10/06/92 M/ SB ADM/PMSB*

TECH/ED* PMSB/PMAS*

D/PMSB* OGCB/DORS*

b ok:bp LBarnett JMain RWessman FGillespie GMarcus 10/6/92 10/6/92 10/8/92 10/8/92 10/9/92 ADP B mes JPartlow/ /13/92 10/ /92 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL

TO: All Holder.- f Operating Licenses or Constrt ion Permits for Nuclear Poh.-- Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you th , effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) a reorganized.

Although the previous NRR organization was basically

6 und, some organizational realignments were needed to more eff tively provide for the Office's dual focus role in the oversight of operang reactors and the review of advanced plant and license renewal activities

.The reorganization has realigned a number of N branches and reporting relationships, but individual assignments and sks are essentially unchanged.

The organizational change includes realignin ix branches, creating a new branch, and consolidating environmental fun ons into a single branch level organization.

The number of technical divi ons remains at six, with the Division of Operational Events Assessment ving from the Associate Director for Inspection and Technical Assessment ( T) to the Associate Director for Projects (ADP). The new organization be er aligns management of technical activities within ADT, transfers some f ctions to ADP, and transfers the responsibility for conducting environm 'tal reviews from ADP to the Associate Director for Advanced Reactors and Li se Renewal (ADAR). Some Senior Executive Service (SES) positions hay been realigned.

The new NRR organization chart which depicts the ew structure and manager reporting relationships is attached.The organizational change will pro de significant benefits and enable NRR to conduct its mission more effectiv )y by: consolidating certain functions within individual divisions for Ae effective resolution of technical issues and conduct of reviews, improvin coordination of efforts to oversee operating plants, and yielding a better a gnment between headquarters and field activities.

James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Organization Chart 2. Recently Issued Generi Letters Contact: Richard H. Wess an, NRR (301) 504-1202 DISTRIBUTION

Central File FGillespie NRC PdR MRushbrook ow LBarnett RWessman DIR/PMAS*FGillespie

10/08/92 GMarcus TECH ED Jeff Main 10/06/92*SEE PREVIOUS CONCURRAICE

OFFICE: ADM/PMSB*

ADM/PMSB*

PMSB/PMAS*

OGCB/DORS

ADPR NAME: MRushbrook Ap LBarnett RWessman GMarcus y e JPartlow DATE: 10/06/92 10/06/92 10/08/92 10/q /92 10/ /92.a OFFICIAL DOCUMENT RECORD COPY NAME: G:\REORG.GL

TO: All Holders-f Operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you that, effectiv ctober 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorgan ed.Although the previous NRR organization was basically sound, so organizational realignments were needed to more effectively ovide for the Office's dual focus role in the oversight of operating rea ors and the review of advanced plant and license renewal activities.

The reorganization has realigned a number of NRR bra es and reporting relationships, but individual assignments and tasks re essentially unchanged.

The organizational change includes realigning six ranches, creating a new branch, and consolidating environmental functio into a single branch level organization.

The number of technical divisio remains at six, with the Division of Operational Events Assessment mo ng from the Associate Director for Inspection and Technical Assessment (A to the Associate Director for Projects (ADP). The new organization be r aligns management of technical activities within ADT, transfers some f ctions to ADP, and transfers the responsibility for conducting environ ntal reviews from ADP to the Associate Director for Advanced Reactors and I ense Renewal (ADAR). Some Senior Executive Service (SES) positions ye been realigned to better utilize the managerial skills of individuals certain key positions.

The new NRR organization chart which depict the new structure and manager reporting relationships is attached.The organizational change 1 provide significant benefits and enable NRR to conduct its mission more fectively by: consolidating certain functions within individual divisi ns for more effective resolution of technical issues and conduct of reviews improving coordination of efforts to oversee operating plants, and yielding better alignment between headquarters and field activities.

James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Or nization Chart 2. Recen y Issued Generic Letters Contac v Richard H. Wessman, NRR (301) 504-1202 TINIBUTION

Ce tral File NRC PDR MRushbrook LBarnett RWessman GMarcus F illespie JPartlow a d dPMAS V4 TECH ED FGI1 2Sie Nc9b Jeff Main*SEE PREVIOUS CONCURRENCE

10 92 10/06/92 E OFFICE: ADM/PMSB*

ADM/P PMSB/ m S OGCB/DORS

ADPR NAME: MRushbrook:b f i RWAS n GMarcus JPartlow DATE: 10/06/92 1O/0t92 10/1 /92 10/ /92 10/ /92 OFFICIAL RECORD COPY -.DOCUMENT NAME: G:\REORG.GL

Multiple Addresses

-2 -For further information on the details of the NRR reorganization

/refer to SECY-92-279 "Reorganization of NRR," as approved by the Commis /on on August 12, 1992. /Sincerely, James G. Part ow Associate (rector for Projects Office o uclear Reactor Regulation Enclosure:

NRR Organization Chart

CONTACT

Richard H. Wessman, NRR (301) 504-1202 DISTRIBUTION

Central File pcpDC MRushbrook LBarnett RWessman f GMarcus /FGillespie JPartlow r kei4; 1X iFFICE: ADM/PMSB ADM PMSB/PMAS

OGCB/DORS

ADPR NAME: MR:us b kkb{ RWessman GMarcus JPartlow DATE: 10/kj/92 10/4 /92 10/ /92 1o/ /92 10/ /92 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL

Template:GL-Nav