WO 04-0051, Operating Corporation Response to Generic Letter 2003-01: Control Room Habitability
| ML043280496 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 11/16/2004 |
| From: | Jacobs D Wolf Creek |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| WO 04-0051 | |
| Download: ML043280496 (21) | |
Text
W
-GLF-CREEK
'NUCLEAR OPERATING CORPORATION November 16, 2004 Donna Jacobs Vice President Operations and Plant Manager WO 04-0051 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 2) Letter WO 03-0048, dated August 8, 2003, from B. T. McKinney, WCNOC, to USNRC
Subject:
Docket 50-482: Wolf Creek'Nuclear Operating Corporation response to Generic Letter 2003-01: Control Room Habitability Gentlemen:
Wolf Creek Nuclear Operating Corporation's (WCNOC's) preliminary response to NRC Generic Letter 2003-01, "Control Room Habitability" identified that WCNOC would need to develop an alternate method of integrated inleakage testing because of the Control Room/Control Building design. WCNOC contracted with Brookhaven National Laboratory and performed this alternate integrated inleakage testing on August 14-16, 2004. The enclosure to this letter provides a comparison of the alternate test method used to the ASTM E741 test standard.
Attachment II to this letter provides the preliminary results of this testing and the status' of WCNOC's chemical and smoke evaluations. Attachment IlIl to this letter provides a list of commitments contained in this letter, including a schedule for submittal of a Technical Specification change.
PRO. Box 411/Burlington, KS 66839/IPhone;:(620) 364.8831 An Equal Opportunity Employer M/F/HCNET
/I I/
I
- 1. I
s, WO 04-0051 Page 2 of 2 If you have any questions concerning this matter, please contact me at (620) 364-4246, or Mr.
Kevin Moles at (620) 364-4126.
Very truly yours, Jacobs DJ/rig Attachment I Oath 11 Response III Commitments Enclosure Brookhaven National Laboratory cc: J. N. Donohew (NRC), w/a, wle D. N. Graves (NRC), w/a, wie B. S. Mallett (NRC), w/a, wie Senior Resident Inspector (NRC), wla, wie
Attachment I to WO 04-0051 Page 1 of STATE OF KANSAS
)
)SS COUNTY OF COFFEY )
Donna Jacobs, of lawful age, being first duly sworn upon oath says that she is Vice President Operations and Plant Manager of Wolf Creek Nuclear Operating Corporation; that she has read the foregoing document and knows the contents thereof; that she has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of her knowledge, information and belief.
By Donna Jacobl Vice PresidenL perations and Plant Manager SUBSCRIBED and sworn to before me this Ieday of Iotv,, 2004.
1.'.Xa S
Se a
.:~
~
~!
.:.-F tt-
-r
~
~ 1.
3/4 *-.
IL
'. rI 1
4
)
I Notary Public Expiration Date i-%,I c6& O/2
Attachment II to WO 04-0051 Page 1 of 7 Follow-Up Response to the Requested Information of NRC Generic Letter 2003-01 Below is Wolf Creek Nuclear Operating Corporation's (WCNOC's) follow-up response to NRC Generic Letter 2003-01, 'Control Room Habitability," dated June 12, 2003. The information requested by the Generic Letter is shown in bold followed by WCNOC's response. Please note that the inleakage values shown are still "preliminary" as the final report has not yet been provided by Brookhaven National Laboratory.
Requested Information
- 1. Confirm that your facility's Control Room meets its applicable habitability regulatory requirements (e.g., GDC 1, 3, 4, 5, and 19) and that the CRHSs are designed, constructed, configured, operated, and maintained in accordance with the facility's design and licensing basis.
WCNOC Response:
WCNOC is committed to the General Design Criteria of Appendix A of 1 OCFR50 as documented in its Updated Final Safety Analysis Report.
The preliminary results of confirmatory testing performed at Wolf Creek in August 2004, showed that the Wolf Creek Control Room is capable of meeting the regulatory habitability requirements. The testing demonstrated that the Control Room Habitability systems (CRHS) limited control room inleakage to acceptable values when configured, operated, and maintained as designed and constructed. The programs described in the reference submittal remain in place and the systems were operated in accordance with these procedures for this test.
Preliminary calculations (using the preliminary test results with the maximum tolerance applied) indicate that dose to the Operators remains under the regulatory limits. The values calculated using these preliminary values are shown in Table 1 below and compared to the regulatory limits.
Table I Control Room Dose to:
At 12.7 CFM Regulatory (Prelim. Results + Tolerance)
Limits Thyroid 19.91 Rem 30 Rem Whole Body 0.2002 Rem 5 Rem Beta Skin 3.271 Rem 30 Rem The WCGS/SNUPPS (Wolf Creek Generating Station/Standardized Nuclear Unit Power Plant System) Control Room Envelope (CRE) design is unique. The control building by and large surrounds the CRE.
The CRE is required by Technical Specifications to be at a positive pressure with respect to its surrounding environment. The Control Building is also designed to be at a positive pressure with respect to its. surrounding environment although not positive with respect to the CRE. In the emergency pressurization and filtration mode, the Control Room air volume receives air through a filtration system that takes a suction on the Control Building.
The Control Building in turn receives filtered air from the outside environment.
The Generic Letter proposed ASTM E741 test methodology is designed for testing a single zone and basically implicitly assumes that all air can be categorized as either unfiltered outside air or filtered inside air. As described above, the SNUPPS plant design has two separate
Attachment II to WO 04-0051 Page 2 of 7 control zones, the Control Building and the CRE. It is invalid to treat them as merely different volumes within a common zone. Based on the SNUPPS plant design the CRE dose model has three categories of air; unfiltered outside air, single filtered control building air, and double filtered Control Room air.
The Control Building has multiple common boundaries with the CRE.
With the CRE pressurized, a substantial fraction of the outleakage from.the CRE will go into the Control Building. This air could then be drawn back into the filtered pressurization system and put back into the Control Room. The current ASTM E741 tracer gas test does not account for re-introduction of tracer gas back into the test volume, potentially leading'to erroneous and non-conservative inleakage test results. In order to provide valid test results for this configuration WCNOC chose to perform an alternate tracer gas test using the Atmospheric Tracer Depletion Method described below.
Tracer Gas Test Using the Brookhaven National Laboratory Atmospheric Tracer Depletion (ATD) Method It has been shown that Control room inleakage can be determined by using a tracer gas test methodology. Tracer gases can be injected into a controlled volume or the tracer gases that are already present in the atmosphere can be used for tracer gas testing. Performing a tracer gas test utilizing the tracer gases (perfluorocarbons) that are present in the air is described as an Atmospheric Tracer Depletion (ATD) inleakage method. Both the ATD and injection tracer gas tests methods are very similar in that they both have the ability to accurately-measure air leaking into a controlled environment (control room). In both tracer gas test methods air that is leaking into the controlled area (control room).causes a dilution of the tracer gas that is being measured.
- 1) In the tracer gas injection method a measured quantity of test gas is injected into the controlled area. The volume of the controlled area is a known quantity and the amount of filtered air entering and leaving the controlled volume is also known. After it has been determined a steady state condition is reached the concentration of injected tracer gas can be determined. The amount of tracer that should exist in the controlled area can be determined for zero or a given inleakage. If the amount of tracer dilution is greater than the value calculated then an inleakage value can be determined by comparing calculated difference dilution values to the measured dilution values.
- 2) For the ATD method the air leaking into the controlled area (control room) affects the measured tracer gas very similar to the injection method. For the ATD method the concentration of perfluorocarbons that exist in the air before the test begins are measured and used as a reference value. The WCGS control room Filter/Adsorber units (F/A) are located inside the controlled area and are capable of removing the perfluorocarbons to a percent equivalent to their removal efficiency, which is typically greater than 99.9 percent. One of the steps of the ATD test is to measure the concentration of tracer gas at both the inlet and outlet of the F/A units. This measurement is taken throughout the duration of the test. With this measurement verification the'removal efficiency of the emergency F/A units is achieved. Since the volume of the controlled area is a known quantity and the amount of filtered air entering and leaving the controlled volume is also known a dilution of the tracer gas in the controlled area can be calculated. Similar to the injection tracer gas method, the' ATD method equates the deviation from a determined dilution as inleakage into the controller area. The ATD method measures the increase of the tracer gas caused by the inleakage where as the injection method is measuring the decrease to the tracer caused by inleakage. The F/A units remove the tracer gases from the atmosphere and any inleakage will be indicated by the increase of the concentration of tracer gas inside the controlled volume. When steady, state conditions are reached, with zero inleakage into the controlled area the quantity of tracer gas present would be equivalent to the
Attachment II to WO 04-0051 Page 3 of 7 removal efficiency of the F/A units. Example: If the quantity of perfluorocarbon tracer that is naturally existing in the air is 10 ppb and the F/A unit provides 99.9% removal efficiency, then after steady state is reached the amount of tracer gas remaining in the controlled area would be 0.1%, with zero inleakage. Air leaking into the controlled area would cause the concentration to increase above the 0.1%. The increase above the 0.1% is equated to CFM inleakage value. The method of determining inleakage relative to the dilution of a tracer gas is a similar process in both the Tracer Gas Injection and ATD testing methods and both methods comply with the intent of the E741 requirements.
A detailed comparison of this test to the ASTM E741 method is provided in the enclosure to this letter from Brookhaven National Laboratory, the vendor who performed the test.
These results are in agreement with the May 2000 Strategic Teaming and Resource Sharing (STARS) self-assessment that concluded the Control Room design and operation were adequate. This along with the following administrative controls ensures continued compliance with the Control Room Habitability design and licensing bases.
These controls include:
Barrier Breach Control Barriers important to maintaining control room habitability are controlled in procedure AP 10-104, "Breach Authorization." The procedure contains provisions for obtaining authorization to affect the operability of plant barriers required for fire, security, pressure boundary, train operability, flooding, harsh environment, radiation, and missile protection.
The procedure provides the mechanism to assure that the proper compensatory measures are in place prior to the breach being performed.
Procedure Control The preparation, revision, review and approval of procedures is controlled by AP 15C-004, "Preparation, Review and Approval of Procedures, Instructions and Forms."
Interdisciplinary reviews are required, as appropriate, which prompts the control room HVAC System Engineer to review related procedure changes.
Design Chanae Control The Design Change Control Program at WCNOC is established by procedure AP 05-005, 'Design, Implementation and Configuration Control* of Modifications."
The procedure describes the program for the design and implementation of permanent changes to controlled Structures, Systems and/or Components (SSC's) documentation and hardware, which may or may not change Design Basis information.- Procedure AP 05-002, "Dispositions and Change Packages," requires the completion of the Engineering Screening form, APF 05-002-01.
The screening form results cause additional programmatic or interdisciplinary reviews or evaluations to be performed when required.
Questions specific, to Control Room Habitability considerations are asked on the screening form. Additionally, independent verification is performed by an independent and qualified engineer for all safety related plant modifications in accordance with procedure AP 05F-001,"Design Verification."
Temporary modifications to the plant are controlled by procedure AP 211-001, "Temporary Modifications."
Temporary modifications are evaluated for applicable hazards analysis affects including impact on Control Room Habitability by engineers
Attachment II to Wa 04-0051 Attachment II to WO 04-0051 Page 4 of 7 qualified to perform these activities.
Safety Analysis Control The design change process, AP 05-002, "Dispositions and Change Packages," ensures that related safety analysis calculations are reviewed as part of the design change.
Safety analysis calculations revised for purposes other than design change are independently verified in accordance with procedure AP 051-001, "Design Verifications and the 50.59 process." This verification and screening will ensure that the.appropriate considerations for control room habitability are included if applicable.
Maintenance Control All work activities performed on plant systems, structures, or components, by WCNOC maintenance personnel, are controlled by the work controls process AP.16C-006, "MPAC Work Controls."
Preventive Maintenance (PM) activities are administered in accordance with Al 16B-002, 'Updating the PM Activity Module," and AP 16B-003, "Planning and Scheduling Preventive Maintenance."
In addition, the May 2000 assessment reviewed representative PM's and found them to be adequate to maintain the control room boundary integrity.
In addition to the above controls, WCNOC is incorporating Control Room Habitability into the WCGS Chemical Control Program and will continue to work in alliance with STARS to build upon the synergy of the combined effort thus far to ensure that control room habitability is maintained in the long-term.
1(a) That the most limiting unfiltered inleakage into your CRE (and the filtered inleakage if applicable) is no more than the value assumed in your design basis radiological analyses for Control Room habitability. Describe how and when you performed the analyses, tests, and measurements for this confirmation.
WCNOC Response:
WCNOC design basis radiological analysis for control room habitability is described in USAR Appendix 15A for a postulated large break loss of coolant accident. This analysis was last performed in 2000 using the methods described in Regulatory Guide 1.4 and Standard Review Plan Section 6.4. The most limiting unfiltered inleakage from the outside environment into the control room envelope was assumed to be zero standard cubic feet per minute (scfm).
However, an unfiltered inleakage rate of 300 scfm was assumed to account for some unfiltered air that may leak into the control building wherein the control room envelope is located. In addition, an infiltration rate of 10 scfm was assumed for opening and closing of doors associated with activities required by the plant emergency plans and procedures. The results of this analysis are presented in USAR Table 15.6-8, "Radiological Consequences of a Loss-of-Coolant-Accident."
WCNOC evaluated conducting an integrated test and component test for control room inleakage to be responsive to the intent of Generic Letter 2003-01 and NRC Regulatory Guide 1.197. This evaluation determined that ASTM E741 testing methods would not provide valid results for the WCGS CRE design.
Because of these design conditions WCNOC performed an integrated inleakage test using an alternate test technique.
A test method developed by Dr. Russell Dietz of Brookhaven
Attachment II to WO 04-0051 Page 5 of 7 National Laboratory (BNL) entitled Atmospheric Tracer Depletion (ATD) testing was selected.
(See enclosure to this response for a comparison of the ATD test method to the standard ASTM E741 test methods.)
In conjunction with Dr. Dietz and BNL, WCNOC developed a test plan that measured the inleakage to the Control Room Envelope, the Control Building, and the associated Equipment Rooms. The test was performed over a three-day period in August 2004, and the results support the conclusion of a previous assessment, that the design, construction, and operation of the Control Room Habitability Systems were sufficient to limit inleakage to acceptable limits.
The preliminary test results are shown in table 2 below, for each train of control room equipment. Note: for analysis purposes as discussed in response to Question 1, the values for inleakage into the equipment rooms were included with the inleakage into the control building and total inleakage into the building was conservatively assumed to be the 300 CFM described in the design basis.
The final test results will be submitted in response to this Generic Letter within 60 days of the receipt of the official results.
Table 2 Train Inleakage CR Inleakage CB Inleakage ER (CFM)
(CFM)
(B/A)
A 8.9
<50 5.3/25 B
10.8 13.5 2.8/23 1(b) That the most limiting unfiltered inleakage into your CRE is incorporated into your hazardous chemical assessment.
This inleakage may differ from the value assumed in your design basis radiological analyses. Also confirm that the reactor control capability Is maintained from either the control room or the alternate shutdown panel in the event of smoke.
WCNOC Response:
WCNOC's current hazardous chemical assessment indicates that there are no onsite chemicals in quantities, or offsite storage or transportation of chemicals that would pose a credible threat to control room habitability. The WCGS Chemical Control program is being revised to incorporate features necessary to maintain control of hazardous chemicals with respect to Control Room Habitability.
WCNOC is working with the State of Kansas to obtain survey information regarding offsite mobile chemical sources. WCNOC will update both the offsite and onsite hazardous chemical assessments in accordance with Regulatory Guide 1.78, Rev 1, and the measured unfiltered inleakage results (when finalized).
An evaluation to confirm reactor control capability from either the Control Room or the alternate shutdown panel was performed in accordance with the current revision of NEI 99-03, Appendix A, which is now the smoke evaluation section. The evaluation was performed under WCNOC Work Order 03-254239-001, and the results confirmed that the WCGS meets this standard.
1 to WO 04-0051 Page 6 of 7 1(c) That your technical specifications verify the integrity of your CRE and the assumed inleakage rates of potentially contaminated air.
If you currently have a AP surveillance requirement to demonstrate CRE integrity, provide the basis for your conclusion that it remains adequate to demonstrate CRE integrity in light of the ASTM E741 testing results. If you conclude that your AP surveillance requirement is no longer adequate, provide a schedule for:.1) revising the surveillance requirement in your technical specification to reference an acceptable surveillance methodology (e.g., ASTM E-741), and 2) making any necessary modifications to your CRE so that compliance with your new surveillance requirement can be demonstrated.
If your. facility does not currently have a technical specification surveillance requirement for your CRE, explain how and on what frequency you confirm your.
CRE integrity and why this is adequate to demonstrate CRE integrity.
WCNOC Response:
WCGS' Technical Specifications require, that a surveillance be performed on an 18 month staggered basis to verify that one Control Room Emergency Ventilation System (CREVS) train can maintain a positive pressure of > 0.25 inches water gauge, relative to the outside during the pressurization mode of operation. The WCGS Technical Specification Bases state that this surveillance requirement verifies the integrity of the Control Room enclosure and the assumed inleakage rates of potentially contaminated air.
Positive pressure surveillance testing does verify the operability of the CREVS train and provides an indication of Control Room boundary integrity. However, this testing does not confirm Control Room integrity using inleakage values. WCNOC acknowledges that some form of inleakage testing appears to be the optimal method for confirming boundary integrity.
WCNOC believes that it is inappropriate to submit changes to the current Technical Specifications until resolution has been achieved between the NRC and the industry on the programmatic guidance and technical specifications for verifying and maintaining Control Room Habitability to satisfy General Design Criterion (GDC) 19. WCNOC will submit a license amendment request to revise the Technical Specifications within one year after NRC resolution of TSTF-448, "Control Room Habitability."* This license amendment request will utilize the guidance of TSTF-448, as appropriate.
WCNOC does not anticipate that any plant modifications will be required to incorporate a Control Room Integrity Program into the Technical Specifications as described above.
- 2.
If you currently use compensatory measures to demonstrate CRE habitability, describe the compensatory measures at your facility and the corrective actions needed to retire these compensatory measures.
WCNOC Response:
WCNOC does not use compensatory measures to demonstrate Control Room envelope habitability.
Attachment II to WO 04-0051 Page 7 of 7
- 3.
If you believe that your facility is not required to meet either the GDC, the draft GDC, or the "Principle Design Criteria" regarding control room habitability, in addition to responding to items 1 and 2 above, provide the documentation (e.g.,
Preliminary Safety Analysis Report, Final Safety Analysis Report sections, or correspondence, etc.) of the basis for this conclusion and identify your actual requirements.
WCNOC Response:
WCNOC is committed to the General Design Criteria of Appendix A of 1 OCFR50 as documented in the USAR:
Attachment IlIl of WO 04-0051 Page 1 of 1 LIST OF COMMITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation in Attachment lI to this letter. Other statements in Attachment II to this 'letter are not considered to be regulatory commitments.
Please direct questions regarding these commitments to Mr. Kevin Moles, Manager Regulatory Affairs at Wolf Creek Generating Station, (620) 364-4126.
Commitment Due Date WCNOC will submit the final test results when the official test report is Within 60 days received.
of receipt WCNOC will submit a license amendment request to revise the Technical Within 1 year of Specifications within one year after, NRC resolution of TSTF-448, "Control resolution of Room Habitability."
This license amendment request will utilize the TSTF-448.
guidance of TSTF-448, as appropriate.
Environmental Sciences Department Atmospheric Systems Division.
BRD tOKHAVEN Tracer Technology Center NATIONAL LABORATORY Building 815E, PO Box 5000 Upton, NYl 1973-5000 Phone 631 344-3059 Fax 631 344-2887 dietz@bnl.gov www.bnl.aov www.ecd.aovrrTC.hmtl managed by Brookhaven Science Associates for the U.S. Department of Energy August 8, 2003 APPLICABILITY OF ASTM E741 TO FOUR TECHNIQUES FOR MEASURING UNFILTERED IN-LEAKAGE I. Overview A review was made of each of the 18 major elements or sections of the standard with respect to the four techniques for measuring unfiltered in-leakage. The techniques -
concentration decay and constant injection'- have traditionally been performed with sulfur hexafluoride (SF6) but the standard indicates that any acceptable tracer and corresponding samplers and analyzers are acceptable. Perfluorocarbon tracers (PFTs) can also be used in both these techniques. The subcommittee E 06.41 on Air Leakage and Ventilation has prepared a ballot to include PFTs in the standard's Table X1.1 and XI.2 that list tracer gases used to determine air change; PFTs have been used for more than 20 years for this purpose'.
The other two techniques in this review are the Brookhaven National Laboratory (BNL)
Air Infiltration Measurement System (AIMS) and Atmospheric Tracer Depletion (ATD).
In practice, a one-zone AIMS test is a constant injection technique as defined by the standard.
A further advantage of AIMS is the availability of multiple PFTs for tagging multiple zones simultaneously 2 3. The multi-zone capability is invaluable for quantifying in-leakage from other zones contiguous to a control room envelope (CRE) or for testing CREs that are comprised of normally multiple well-mixed zones. Although this capability goes beyond the intended scope of the standard, AIMS will be shown to conform to the elements within the standard.
The last technique, ATD, was newly conceived in November 2002, and, therefore, was not in existence for consideration by the standard's subcommittee. Further, ATD can only be used in buildings or envelopes that are equipped with a charcoal filtration air handling system such as a nuclear power plant's control room emergency ventilation system (CREVS). The standard was not devised with consideration of such envelopes; in these cases, however, ATD is a perfect candidate for the direct determination of unfiltered in-leakage. This fourth and last technique is also evaluated with respect to its conformance to the standard.
When this review was conducted in the end of May 2003, the reviewer was not aware of the exceptions to the standard as noted in the NEI 99-03 (Rev. I, 3/03)4 report (Appendix EE,
- p. EE-1). It will be seen that many of the exceptions noted in the NEI document were also noted in this review as "not applicable" (na).
This description of that review comments on the answers given in the Appendix:
Comparison Table on Conformance to the Standard. The summary of that review, given in Section 3, was presented at ANS and NHUG meetings. The Conclusion (Section 4) is that all four (4) techniques conform to about the same 90% or so.
- 2. Comments on Comparison Table This section is numbered according to the 18 elements and steps in the standard.
As mentioned earlier, with one tracer, AIMS is essentially identical to SF6 constant injection, so the answers to conformance should be similar; differences will be discussed. During ATD testing, when the CREVS is first turned on, the ambient background concentration of PFTs is being depleted (decaying) in a fashion that mimics the concentration decay techniques. Thus, unfiltered in-leakage can be obtained from this initial ATD decay with time in a manner similar to total in-leakage from SF6 concentration decay. The usual approach, however, is to perform measurements after steady state has been attained.
- 1.
Scope 1.1 All the techniques involved dilution of tracer gas. Concentration decay pertains to "decay" and ATD and constant injection to "inject" and AIMS.
1.2 The standard is restricted to a single tracer gas which all four (4) techniques can use. Additionally, the review asked the questions: Are multiple tracers used in a single zone (only ATD was Yes), and Are multiple tracers used in multiple zones (only AIMS was Yes).
1.3 All four techniques use gas analyses, instruments, etc.
1.4 This step asks the question: Are individual components testable. There are really three qualifiers:
easily: only ATD is "Yes" (this is the answer used in the analysis) with special tagging: SF6 inject and AIMS are "Yes",
defined in E 741 (all "No").
1.5 Results pertinent to tested conditions: all "Yes".
1.6 And 1.7 General info; therefore na for all.
- 2.
Reference Documnents 2.1 The first and last two references were not applicable. Packed column chromatography is practiced by all but ATD which uses capillary column GC.
- 3.
Terminology 3.1 The definitions are about the same for all four (4) techniques. Step 3.17.1 is an uncertain element. When there are two (2) or more distinct zones within the CRE or even multiple zones contiguous to the boundary, both SF6 techniques as well as ATD may be uncertain in their applicability. AIMS is applicable.
3.2 Each of the techniques use a number of the symbols listed. This step was not considered.
- 4.
Summary of Test Method 4.1 All techniques perform tracer gas measurements in a single zone. Concentration is only needed for "inject" and AIMS, whereas, relative response is used by the other two (2).
Measurement of a tracer injection rate is only by "inject" and AIMS and injection techniques are needed for all but ATD. All have to consider sampling strategies.
2
4.2 All techniques are available for choosing.
4.2.1 The air change quantity determined is different for the four techniques.
"Decay" measures total air change rate, whereas, "inject" and AIMS measure a total air in-leakage flow rate; thus, "decay" only provides an indirect measure of total air in-leakage.
Further, only ATD provides a direct measure of unfiltered in-leakage.
- 5.
Significance and Use General relevance; not used in ranking.
- 6.
Apparatus 6.1 Distributing tracer is na for ATD (no tracer release required). Obtaining air samples and using a gas analyzer is "Yes" for all four (4).
6.2 Tracer gases are "used" in all four (4) techniques (Yes).
6.2.1 All four use a tracer gas standard (Yes). However, "decay" and ATD do not need the tracer standard for intended in-leakage results.
6.3 Tracer gas injection and distribution. ATD does not require tracer release.
6.3.1 And 6.3.2 All but ATD are "Yes"; ATD is na.
6.4 Tracer gas sampling (and all the sub-elements - 6.4.1 to 6.4.3) are "Yes" to all four (4) techniques.
6.5 All techniques use relevant tracer gas analysis capabilities.
6.6 Ancillary measurements. '
6.6.1 Meteorological equipment was excluded here as well as in the NEI exceptions.4 6.6.2 And 6.6.3 The reviewer gave a "Yes" to all four (4) techniques.
Temperature is important to AIMS for correcting source emission rates and is a good indicator of the stability of HVAC equipment. Timing is important to all techniques.
6.7 Data acquisition was na for all four (4) techniques. This was recognized by NEI as well.
- 7.
Hazards All four (4) techniques consider 7.1 (Safety) and 7.2 (Health).
7.3 Explosive limits is na to all four (4) techniques.
7.4 Only "decay" and "inject" must consider compressed gases at the site.
8/9.
Concentration Decay/Constant Injection Test Methods In the E 741 standard, both of these methods follow the same sub-elements. Therefore, only a single set of sub-elements was considered for conformance by all four (4) techniques.
8/9.1 The general summary was considered na for all four (4) techniques.
8/9.2 Preparation is important to all techniques.
8/9.2.1 Ancillary measurements were important to all four (4) during preparation with respect to how zones will be operated and volume of zones (for calculating time constants). This applies to 8/9.2.2 as well..
8/9.2.3 The requirements for estimating tracer gas injection rates and initial volumes is important to all three (3) techniques but.ATD (no tracer injected). Accelerating time to steady state for "inject" and AIMS can also be considered here.
8/9.2.4 Where to sample is relevant to all four (4) techniques.
8/9.3 Only ATD does not have to implement tracer injection.
8/9.4 All four (4) techniques need to consider spatial and time-dependent sampling.
8/9.5 Analyses is different for the four (4) techniques.
8/9.5.1 The first two (2) techniques analyze on site and the last two (2), off site.
3
8/9.5.2 Uniformity of concentrations or adequately determined volume-weighted average concentrations must be determined.
8/9.5.3
- The first three (3) techniques calculated total air change rate or flow rate; ATD does not. However, the first three (3) techniques do not directly determine unfiltered in-leakage; ATD does ("Yes").
- 10.
Constant Concentration Method This review and NEI considered this step to be na.
- 11.
Preparation of Zones 11.1 Ancillary measurements (such as temperature), zone volumes, and estimated total zonal flow rates are important for all four (4) techniques. Temperatures indicate stability of HVAC systems. Zone volumes and flow rates are needed for times to steady state.
11.2 Status of zone being tested as well as contiguous zones is important to all techniques.
- 12.
Procedurefor Distributing Tracer Gas
-For most steps in this section, ATD response is na since no tracer is intentionally released.
12.1 Avoiding contamination is always important.
12.1.1 Handling bottles and regulators ("decay" and "inject") as well as permeation sources (AIMS) is important for these techniques.
12.1.2 Anything that might adversely affect the conservation of the tracer, even that being depleted in ATD, must be considered.
12.1.3 A measure of potential interferences before testing is important to all.
12.2 Manual injection is used for "decay" and to accelerate approach to steady state for "inject" and AIMS.
12.3 Metered injection is only used for "inject" and AIMS 12.4 Uniformity of concentrations 12.4.1 Uniformity of released-tracer concentrations within a zone is to be within 10% of the average. Sampling done at several return air locations or averaged over many volume-weighted locations can assure appropriate values for the three techniques using tracer release. However, ATD is like a negative tracer release - i.e., depletion. Thus, the "source" location of that depleted air must also be uniformly determined. Therefore, "Yes" to all four (4) techniques.
12.4.2 Aids to mixing are important to all but ATD. With the latter, a volume-weighted determination is generally preferred in order to observe locations where unfiltered in-leakage might actually be occurring. Mixing would eliminate that observation without a real significant gain in reducing uncertainty in determining unfiltered in-leakage. That is not the case for "decay" or "inject". Because unfiltered in-leakage is obtained by difference, accuracy and precision needs to be much better; concentration variability needs to be much tighter than for ATD. Thus, only ATD is na.
- 13.
Sampling Tracer Gas Sampling tracer gas is important and "Yes" for all sub-elements in this section.
No exceptions.
- 14.
Procedures for Gas Analysis Procedures for gas analysis are also all "Yes" with the exception of using standards for the GC during ATD analyses.
4
14.1 Calibration of the gas analyses for ATD is na. However, prior studies were made of gas analyzer accuracy (14.1.1.), gas analyzer precision (14.1.2), and other factors that affect estimated measurement precision (14.1.3) to assure that this step is not needed for each field test.
- 15.
Procedure for Ancillary Measurements This procedure is not used in the NEI recommendations. Outdoor temperature and wind (15.1) and correlation with in-leakge is na for all four (4) techniques.
15.2 Indoor temperature is important for AIMS sources, but, also to verify air handling system performance; all "Yes".
15.3 Zone volumes are needed for all techniques to estimate times to steady state.
- 16.
Report NEI recommendations were to not use the standard guidelines. The original review considered Sections 16.1 and 16.2 to be all "Yes" for all four (4) techniques.
16.3 Data analysis 16.3.1 Record of tracer injection is na for ATD.
16.3.2 All four (4) techniques consider a record of concentration or tracer response.
16.3.3 The first three (3) techniques calculate total air change rate or. flow; ATD is na. However, only ATD directly calculates unfiltered in-leakage (ATD "Yes" and all others "No").
16.3.4 All techniques consider an error analysis.
- 17.
Precision and Bias Again, the NEI recommendations were to not follow the standard but use the vendor's procedures. This original review considered how the four (4) techniques would conform to the standard.
17.1 This overview statement was not ranked.
17.2 Precision is considered by all techniques ("Yes"). All look at variability in concentration or response as a function of time and sampling location.
17.2.1 All techniques use a tracer gas standard to verify performance of the analyzer prior to use - including precision across multiple samples.
17.2.2 Again, all techniques use zone volume to determine time constants to steady state and for mixing.
17.2.3 Scatter about a tracer decay result relates to magnitude of precision for that technique only.
17.2.4 Scatter in concentration versus time and location relates to precision in the other three techniques.
17.2.5 None of the four (4) techniques relate to the constant concentration technique.
17.3 All four (4) techniques consider bias. ATD is the likely technique least influenced by bias.
- 3.
Summarv Major element in E 741 standard:
18 specifically applicable 14 Total specific sub-elements 108 5
Sum of "Yes" (percentage of subtotal)
Sum of "No" Uncertain Subtotal Not applicable TOTAL SF6 Decay 80 (89%)
9 l
90 18 108 SF6 Inject 83 (89%)
9 1 *.
93 15 108 AIMS ATD 84 69 (91%)
(92%)
8 5
I1 92 75 16 33 108 108
- 4.
Conclusion All four (4) techniques equally conform to the ASTM E 741 standard - that is, each to about 90% of all sub-elements.
- 5.
References
- 1. Dietz, R.N. and Cote, E.A., AirInfiltration Measturements in a Home Using a ConvenientPerfluorocarbon Tracer Techinique, Environ. Int. 8, pp. 419-433, 1982.
- 2. Dietz, R.N., Goodrich, R.W., Cote, E.A., and Wieser, R.F., Detailed Description and Performance of a Passive Perfluorocarbon Tracer System for Building Ventilation and Air Exchange Measurements, In Measured Air Leakage of Buildings, ASTM STP 904, H.R. Trechsel and P.L. Lagus, Ed., American Society for Testing and Materials, Philadelphia, 1986, pp. 203-264.
- 3. D'Ottavio, T.W., Senum, G.I., and Dietz, R.N., Error Analysis Techlniques for Perfluorocarbon Tracer Derived Multizone Flow Rates, Building and Environment, 23 (3), pp.
187-194, 1988.
- 4. Control Room Habitability Guidance, NEI 99-03 (Rev. 1), Nuclear Energy Institute, March 2003.
6
Applicability of ASTM E 741 to Four Techniques for Measuring Unfiltered In-Leakage Appendix:
Comparison Table on Conformance to the Standard - yes, no, or na (not applicable)
SF6 SF6 No.
Item Decay Inject AIMS ATD.
- 1.
Scope 1.1 Tracer gas dilution Yes Yes Yes Yes (1) Concentration decay Yes No No No (2) Constant injection No Yes Yes na 1.2 Single tracer gas for single zone Yes Yes Yes Yes Multiple tracer gas for single zone No No' No Yes Multiple tracer gas for multiple zones No No Yes No 1.3 Gas analysis, instruments, units Yes Yes Yes Yes 1.4 Individual components testable No No No
'Yes 1.5 Results pertain to tested conditions' Yes Yes Yes Yes only 1.6 Notes & footnotes na na na na 1.7 Safety & health na na na.
na
- 2.
Referenced Documents 2.1 ASTM standards D 4480 meas. surface winds na na na na E 260 Practice for packed column GC na na na na E 779 Fan pressurization testing Yes Yes Yes na E 1 186 Air leakage site detection '
na na na na
- 3.
Terminology 3.1 Definitions 3.1.1 Air change flow na Qm 3 /h R, m3/h R, m/h 3.1.2 Air change rate A, h-'
na na na 3.1.3 Envelope Yes Yes Yes' Yes 3.1.3.1 discussion Yes Yes Yes Yes 3.1.4 Tracer gas Yes Yes Yes Yes 3.1.5 Tracer gas analyzer Yes Yes Yes Yes 3.1.6 Tracer gas concentration m3/ m3 m3/ m3 nU m3 ' cts/ m3 3.1.7 Single zone Yes Yes Yes Yes 3.1.7.1 multiple zones uncertain uncertain Yes uncertain 3.2 Symbols
- 4.
Summary of Test Method 4.1 Tracer gas measurement in single zones Yes Yes Yes Yes
- measurement of concentration na Yes Yes na
- measurement of relative response Yes na na Yes 7
SF6 SF6 No.
Item Dccay Inject AIMS ATD Measurement of tracer injection rate na Yes Yes na Injection techniques Yes Yes Yes na Sampling strategies Yes Yes Yes.
Yes 4.2 Choice of techniques Yes Yes Yes Yes 4.2.1 Air change quantity
- total air change rate Yes No No No
- total air change flow No Yes Yes No direct unfiltered flow No No No Yes
- 5.
Significance and Use (general relevance)
- 6.
Apparatus 6.1 Distributing tracer Yes Yes Yes na
- obtaining air samples Yes Yes Yes Yes
- gas analyzer Yes Yes Yes Yes 6.2 Tracer gases Yes Yes
- Yes Yes 6.2.1 Tracer gas standard na Yes Yes na 6.3 Tracer gas injection/distribution 6.3.1 Tracer gas metering Yes Yes Yes na 6.3.2 Tracer gas distribution Yes Yes Yes na 6.4 Tracer gas sampling Yes Yes Yes Yes 6.4.1 Materials for sampling Yes Yes Yes Yes 6.4.2 Manual samplers.
Yes Yes Yes Yes 6.4.3 Automatic samplers Yes Yes Yes Yes 6.4.3.1 Sampling network Yes Yes Yes Yes 6.4.3.2 Automated samplers Yes Yes
'Yes Yes 6.5 Gas analyzers Yes Yes Yes Yes 6.6 Ancillary measurement devices 6.6.2&3 Temperature and timing Yes Yes Yes Yes 6.7 Data acquisition and control na na na na
- 7.
Hazards 7.1 Safety Yes
. Yes Yes Yes 7.2 Health
- Yes, Yes Yes Yes 7.3 Explosive limits na na na na 7.4 Compressed gases Yes Yes na na 8/9.
Concentration decay/Constant injection 8/9.1 Summary na na na na 8/9.2 Preparation 8/9.2.1 Ancillary measurements Yes Yes Yes Yes 8/9.2.2 Zonal operation Yes Yes Yes Yes 8/9.2.3 Tracer gas injection volume Yes Yes Yes na 8/9.2.4 Sampling Yes Yes Yes Yes 8
No.
8/9.3 8/9.4 8/9.5 8/9.5.1 8/9.5.2 8/9.5.3 10.
11.
11.1 11.2 12.
12.1 12.1.1 12.1.2 12.1.3 12.2 12.3 12.4 12.4.1 12.4.2 13.
13.1 13.2 13.3 13.3.1 13.3.2 13.4 14.
14.1 14.2 14.3 15.
15.1 15.2 15.3 15.4 Item Tracer injection Sampling Analysis
- analyze on site
- analyze off site Uniformity of concentration
- calc air change rate or flow
- calc direct unfiltered in-leakage Constant Concentration Method Preparation of Zone Auxiliary measurements Preparation of zone Procedures for Distributing Tracer Gas Avoid contamination Handling tracer gases Conservation of tracer gas Pre-existing tracer gas Manual injection Metered injection Uniformity of concentration Uniformity determined Aids to mixing Sampling Tracer Gas Manual sampling Automated sampling Spatial sampling When to sample Where to sample Avoid contaminationldilution Procedures for Gas Analysis Calibration of analyzer Tracer gas sampling records Tracer gas measurements Procedure for Ancillary Measurements Outdoor temperature & wind Indoor temperature Zone volume Correlation with air change SF6 Dcay Yes Yes Yes No Yes
- Yes
- No na SF6 Inject Yes.
Yes AIMS
- Yes Yes Yes No
- Yes Yes
- No na Yes Yes Yes Yes Yes Yes Yes Yes na Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes na Yes Yes
- Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
- Yes Yes Yes Yes na Yes Yes No Yes Yes Yes.
No na Yes Yes Yes Yes Yes Yes Yes Yes Y es Yes
- Yes Yes Yes Yes Yes Yes Yes na Yes Yes na ATD na Yes No Yes Yes No Yes na Yes Yes na Yes Yes na na Yes na Yes Yes Yes Yes Yes Yes Yes Yes na Yes Yes na na na 9
N SF6 SF6 No.
Item Decay Inject AIMS ATD
- 16.
Report 16.1.1 Background information 16.1.1.1 Description of enclosure.
Yes Yes Yes Yes 16.1.1.2.
Zone description(s)
Yes Yes Yes Yes 16.1.2 Design of test 16.1.2.1 Test method Yes Yes Yes Yes 16.1.2.2 Zone operation Yes Yes Yes Yes 16.1.2.3 Tracer gas distribution Yes,
Yes Yes na 16.1.2.4 Tracer gas sampling Yes Yes Yes Yes 16.1.2.5 Gas analyzer Yes.
Yes Yes Yes 16.1.2.6 Data gathering Yes Yes Yes Yes 16.1.2.7 Ancillary measurements.
Yes Yes Yes Yes.
16.1.3 Data analysis 16.1.3.1 Record of tracer injection Yes Yes.
Yes na 16.1.3.2 Record of tracer concentration Yes
. Yes Yes Yes 16.1.3.3
- Calculation of total air change Yes Yes Yes na
- CaIc. of direct unfiltered in-leakage No
'No No Yes 16.1.3.4 Error analysis Yes Yes Yes Yes
- 17.
Precision and Bias 17.1 Overview 17.2 Precision Yes Yes Yes Yes 17.2.1 Gas analyzer (stds, repetitive samples, Yes Yes Yes Yes etc) 17.2.2 Zone volumes Yes Yes Yes Yes 17.2.3 Tracer decay scatter Yes na na na 17.2.4 Constant tracer injection na Yes Yes Yes 17.2.5 Constant concentration na na na na 17.3 Bias 17.3.1-3 Identified biases Yes Yes Yes Yes
- 18.
Key Wfords Summary Sum of "Yes" 80 83 84 69 (percentage of subtotal)
(89%)
(89%)
(91%)
(92%)
Sum of "No" 9
9 8
5 Uncertain 1
I.
Subtotal 90 93 92 75 Not applicable 18 15 16 33 TOTAL 108 108 108 108 10