.a LD UlSI AN A / 317 BARONNE STREET e
P. O. BOX 60340 NEW ORLEANS, LOUISIANA 70160
- (504) 595 3100
- POWE R S LiG HT MIDDLE SOUTH unums srsrEM Refer:
10CFR50.55a November 20, 1987 W3P87-2218 A4.05 OA
%ggg-pg Mr. Robert D. Martin Regional Administrator, Region IV
_a U.S. Nuclear Regulatory Commission l.'
611 Ryan Plaza Drive., Suite 1000 i
NOV 2 31987 Arlington, TX 76011 y
yp
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Ten Year Inservice Inspection Program, Revision 3
Reference:
LP&L letter W3P87-1731 dated October 15, 1987 from K.W. Cook to U.S. Nuclear Regulatory Commission.
Dear Mr. Martin:
The Ten Year Inservice Inspection Program, Revision 3 submitted by the referenced letter as such was not docketed by the Nuclear Regulatory Commission Document Control Desk in Washington, D.C.
Enclosed are three replacement pages which when inserted in the copy of the Program sent to you will reflect the program as docketed.
To assure that your copy is a duplicate of the docketed copy, please remove and discard the entire section 1.17 (including flow diagrams) and replace with the enclosed one page for section 1.17.
Also replace pages with section 1.1 and 1.16 with enclosed new pages.
We regret any inconveniences this may cause.
If you have any questions on this matter please contact G.E. Wuller at (504) 464-3499.
Very truly yours, K.W. Cook Nuclear Safety and Regulatory Affairs Manager i
KWC:BGM:ssf i
Enclosure cc (w/ enclosure):
NRC Resident Inspectors Office l
cc (w/o enclosure):
J.H. Wilson, NRC-NRR l
W.M. Stevenson r
l 3
0 g8 E.L. Blake NS20687
[
ff 8712O20423 871120 M
l h.g[-l$?r-l PDR ADOCg 050003gg
- p - ;, g l< /
l
-(
G PDR a
l
), e <e.-
l?
i 10 YEAR INSERVICE INSPECTION PROGRAM Rev.'3
-]
m 1.0 GENERAL
- l lil INTRODUCTION 1
f
)q In accordance with-iOCFR50.55a(g) " Inservice Inspection Requirements",
l the following is the inservice Inspection Program for the First 10 Year Interval of commercial operation at the Waterford Nuclear Plant,
. Unit No. 3.
This program meets, as much as practical, the require-ments of tbe 1980 Edition through Winter 81 Addenda of ASME Section XI
\\,
r for all examination categories. However, the extent of. examination-and exemption criteria for Code C' lass 2 piping welds in Emergency
- o n3 Core Ccioling Systems (ECCS), Residual Heat Removal' Systems (RHR), and Containment Heat. Removal Systems (CHR) is in accordance with the 1974 Edition through Summer 75 Addenda as required by 10CFR50.55a(b')(2)(iv).
(
The " General" section of this program includes the " Inservice Inspect-ion Line List" which lists al3 Class 1, 2 and 3 lines detailing various information about each line. A cover sheet precedes the line list.which has a more detailed explanation of the information about each line. The remainder of the program has been divided by Code Class including a separate section for supports (IWF).
Each section contains examination tables which identify the total number of items, the total number of items which have been selected for examination, the anticipated distribution of examinations per period, and also references figures which show the required area of examination. The figures are numbered and follow the examination tables. Code Class 1
& 2 piping and vessels have been depicted on several examination drawings which identify all of the welds and other examination areas.
Sheet (s) titled " Items Selected for Examination" accompanies each drawing identifying the items (i.e., welds, valves, supports) which have been selected for examination on that particular examination drawing.
O
<e.
10 YEAR INSERVICE INSPECTION PROGRAM Rev. 3
/~
i N,,)}
r 1.15 SUCCESSIVE INSPECTIONS Successive inspections will be performed in accordance with IWB,' IVC and IWF-2420.
1.16 INSERVICE INSPECTION LINE LIST The Inservice Inspection Line List (ISI Line list) was established by LP&L to identify inservice inspection requirements for all Class 1, 2 and 3 piping at Waterford 3.
It is organized by Code Class, system, and line number, respectively. All Class 1, 2 'and 3 piping is included in the line list with examination rr.quirem2nts and/or exemption criteria identified, as appropriate.
To the right of each line number is information regarding the nominal r
pipe schedule and the maximum operating and design conditions.
6
\\,
Further to the right, other types of information include:
1.16.1 The flow diagram (s) on which the line is located.
1.16.2 The examination zone which was used during the preservice program. Although the zone concept _is not being utilized for inservice inspection, the first two numbers for a weld on a line (i.e.,28-001) correspond to the examination zone I
that was applied to that particu,lar line.
1.16.3 The Examination Category of the line.
This information is derived from Tables IWB-2500-1, IWC-2500-1, and IWD-2500-1 of the 1980 Edition through Winter 81 Addenda of ASME Section XI.
O l v 4
__J
7, p
10 YEAR INSERVICE INSPECTION PROGRAM
,7 Rev. 3 s) _
,m; 1.17. SYSTEM FLOW DIAGRAMS The purpose of the system flow diagrams (not included in this program) listed below is to provide a reference to a visual representation of the various piping systems which are subject to, or exempt from examination in accordance with the requirements of Section XI.
The drawings listed below are used fn -anjunction with the Inservice Inspection Line List to determine applicability of examinations or exemptions. All examination drawings in the Class 1, 2 and 3 sections of this program and the Inservice Inspection Line List reference the applicable flow diagram and/or plant isometric on which the line(s) are located.
FLOW DIAGRAM NO.
SHEET (S)
TITLE G-151 1
Main & Extraction Steam G-152 4,6 Instrument Air
( )r G-153 4
Feedwater, Condensate & Air
. Evacuation G-157 Service Air G-160 1,2,3 Component Closed Cooling Water G-161 1,2 Fire, Makeup & Domestic Water G-162 1,2 Sampling Containment Spray & RWSP G-163 G-164 1,2,5 Miscellaneous Reactor Auxiliary l
G-165 3
Miscellaneous Turbine Building G-166 1,2 N2, H2, CO2 G-167 1,2 Safety Injection G-168 1,2 Chemical and Volume Control G-169 Fuel Pool G-170 1,4 Waste Management l
G-171 1,2 Boron Management Reactor Coolant G-172 G-173 Sump Pump D)
G-175 2,3 RCB Piping Penetration
(
RCP Seals G-179 G-853 3,4,5,6,7,11 HVAC - Chilled Water G-856 6
HVAC-Reactor Building