Forwards Rev 3 to 10-Yr Inservice Insp Program Waterford Steam Electric Station Unit 3. Relief from ASME Section XI Code & Approval of Revised Program Requested.Summary of Changes Encl.Fee Paid
ML20236L322
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/15/1987
From: Cook K
LOUISIANA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236L325 List:
References
W3P87-1731, NUDOCS 8711100265
Download: ML20236L322 (3)


Text

?

Refer: 10CFR50.55a P. O. BOX 60340 Lo U ISI POWER AN A

& LIGHT / 317 NEWBARONNE STREET ORLEANS, LOUISIANA 70160 * (504) - *595 3100 E$E0i$50$

October 15, 1987 W3P87-1731' A4.05 .

QA U.S. Nuclear Regulatory Commission l ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 i License No. NPF-38 I Ten Year Inservice Inspection Program, Revision 3 l

I In accordance with 10CFR50.55a(g), " Inservice Inspection Requirements",

I Louisiana Power & Light Company hereby submits Revision 3 of the Ten Year Inservice Inspection Program which is prepared in accordance with the ASME Code Section XI, 1980 Edition with Addenda through Winter 1981 as modified by 10CFR50.55a(b)(2)(iv). Relief from the testing requirements of Section XI is requested when fall compliance with the requirements of the code is not practical. In such cases, specific information is provided which identifies the applicable code requirements, justification for the relief requests, and the testing method to be used as an alternative. There is one additional Relief Request resulting from this revision. Also some previous Relief Requests are revised as shown in the attachment to this letter.

Revision 3 to the subject Inspection Program is being submitted at this ,

time to include enhancements whfch were observed during field use of the program and to provide information which was determined during our first outage inspection. The attachment to this letter provides a summary of the changes to the program in Revision 3. Change bars are provided in the page margins to indicate the changes made in this revision.

It is hereby requested that the subject Program be approved and the ASME Section XI code relief requested'be granted pursuant to Section ,

50.55a(g)(6)(1) of 10CFR50.

[Mah $5 2 e.c!c[ @/6 00 "AN EQUAL OPPORTUNITY EMPLOYER"

9 W3P87-1731 Page 2 Also enclosed with this submittal is the application fee of $150 pursuant to the requirements'of 10CFR170.

Very truly yours, fddv/ i K.W. Cook  ;

Nuclear Safety and i Regulatory Affairs Manager KWC:3GM:ssf J l

Enclosure i l

Attachment 1 cc (w/ enclosure): R.D. Martin, NRC Region IV NRC Resident Inspectors Office f I

cc (w/o enclosure): J.A. Calvo, NRC-NRR l J.H. Wilson, NRC-NRR j E.L. Blake j W.M. Stevenson I l

l

_,_ . .. .J

l ATTACHMENT TO W3P67-1731 Page 1.of 1 Major Changes in Revision 3 Ten Year Inservice Inspection Program

1. Added sixteen (16) partial penetration vessel nozzles to Code Item No.

B4.11 on Examination Table B-E. l

2. Revised Code Ttsm Nos. B6.180, B6.190 and B6.200 on Examination Table B-G-1 to reflect examination of one (1) pump only. i
3. Added four (4) sets of heat exchanger bolting to Code Item No. B7.40 on Examination Table B-G-2.

\

l l

4. Added flow baffle to Code Item No. B13.31 on Examination Table B-N-2.

J

5. Added heat exchanger pressure retaining boundary to Code Item Nos. 1 B15.40 and B15.41 on Examination Table B-P.
6. Revised " Items Selected for Examination" sheets and the " Class 3 Component Support List" to reflect the date of which the examination was performed.

l 1

7. Revised Class 2 " Total Per Item" column on Examination Table F-C to reflect an additional support.
8. Revised C_ lass 2 and 3 " Supports Selected for Examination" column on  ;

Examination Table F-C by deleting supports which are listed in relief i requests asking total relief from examination.

9. Revised Class 3 " Total Per Item" column on Examination Table F-C to l

reflect five (5) additional supports which were installed per Station Modification No. 944 and also to reflect four (4) additional supports l which were determined to support 11nes directly associated with the

~

i Emergency Feedwater System, j d

10. Added Request for Relief No. ISI-011 regarding the inside radius j section examination of the Main Steam and Feedwater nozzles' required l by Examination Category C-B, Code Item No. C2.22. j I
11. Revised Request for Relief No. ISI-001 and ISI-007 by updating to 'I results obtained during 1st r_efueling examinations.
12. Revised to correct typographical errors and' incorporate editorial changes for clarification.

1 I