W3P84-1805, Forwards Proposed FSAR Chapter 14 Changes Re Venting of Sys During Hydrostatic Testing & Testing of nonsafety-related Supplementary Chilled Water Sys.Changes Will Be Incorporated in Future FSAR Amend

From kanterella
(Redirected from W3P84-1805)
Jump to navigation Jump to search
Forwards Proposed FSAR Chapter 14 Changes Re Venting of Sys During Hydrostatic Testing & Testing of nonsafety-related Supplementary Chilled Water Sys.Changes Will Be Incorporated in Future FSAR Amend
ML20092P180
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/29/1984
From: Cook K
LOUISIANA POWER & LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
W3P84-1805, NUDOCS 8407060030
Download: ML20092P180 (5)


Text

. ,-

Louisiana POWER & L1GHT

,4,om.soNoe s1em, P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 NuS$$rsM June 29, 1984 W3P84-1805 Q-3-A29.22.14 Director of Nuclear Reactor Regulation Attention: Mr. G.W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Waterford 3 SES Docket No. 50-382 FSAR Chapter 14

Dear Sir:

Per your request and in an effort to complete LP&L's response for Allegation 28, use of high-point vents in hydrostatic testing, attached are proposed FSAR changes which will be implemented in a future amendment in accordance with 10 CFR 50.71(e) requirements. The changes clarify that venting of systems during hydrostatic testing was performed in accordance with the requirements of ASME Boiler and Pressure Vessel Code,Section III.

Article NC-6211 (Summer, 1981 Addenda).

Also, attached are proposed changes which reflect that testing of the non-safety related Supplementary Chilled Water System may not be completed prior to fuel load (this does not violate any NRC requirements).

If you have any questions please do not hesitate to call.

ry truly, 0

bK. '. ook \g Nuclear Support & Licensing Manager KWC/PC/pco Attachment cc: E.L. Blake, W.M. Stevenson, J.T. Collins, D.M. Crutchfield, J. Wilson, G.L. Constable 8407060030 840629 PDR ADOCK 05000302 hO4I A PDR y I

WSES-FSAR-UNIT-3 14.2.12.2.90 SECONDARY SYSTEM HYDROSTATIC TEST 15 14.2.12.2.90.1 Objective To hydrostatically test the secondary side of the steam generators and non-isolable piping. 8 14.2.12.2.90.2 Prerequisites A. The steam generators and main steam piping to the main steam isolation valves are filled, vented, and at the required tem- l15 pe rature . 8 l

B. Reactor Coolant System (RCS) is filled, vented, and at the l 15 required temperature. l 9 C. The reactor coolant pumps are operable.

D. Test pump is available.

E. Main steam safety valves are gagged or removed.

F. Test instrumentation is available and calibrated. 29 G. Permanently installed instrumentation necessary for testing is 34

^

., operable and calibrated.

14.2.12.2.90.3 Test Method A. Increase RCS pressure to a value that will ensure that the 8 secondary to primary differential pressure does not exceed design value.

B. Perform the test in accordance with the ASME code.

14.2.12.2.90.4 Acceptance Criteria The Secondary System hydrostatic test meets the requirements of ASME 18 Boiler and Pressure Vessel Code, Section IIIj (bhwg iw p e rler=4*q Mc ky 'bo-4d ;e. 4c d ton ., ricac neu>rd!"3 10 UC -(c u - s%y , gd 14.2-109 Amendment No. 34, (1/84)

WSES-PSAR-UNIT-3 14.2.12.2.91 REACTOR COOLANT SYSTEM HYDROSTATIC TEST l

14.2.12.2.91.1 Objective l 8 l To verify the integrity of the Reactor Coolant System (RCS) pressure l boundary and associated Safety Class I piping. )

14.2.12.2.91.2 Prerequisites A. The RCS is filled, vented, and at the required temperature.

B. The reactor coolant pumps are operable.

O C. Test pump is available.

D. Primary safety valves are gagged or removed.

E. Permanently installed instrumentation necessary for testing is 34 operable and calibrated.

F. Test instrumentation is available and calibrated. 29 14.2.12.2.91.3 Test Method A. Operate reactor coolant pumps to sweep gases from the steam generator tubes. .

B. Vent the RCS and all control element drive mechanism housings.

8 C. Operate the reactor coolant pumos to increase the RCS temperature to that required for pressurization of RCS to test pressure.

D. Perform the test in accordance with the ASME code .

14.2.12.2.91.4 Acceptance criteria The RCS hydrostatic test meets the requipements of ASME Boiler and Pressure Vessel Code, SectionIIIj(t/cJ in pedc m img O c hydroSInhe 4csl was, done 13 ae co,d lo uc. P1tl- L,a.me, , t%i /}dJ..yk l

lk I

l 14.2-110 Amendment No. 34, (1/64)

,- - - - - - - - , - m,, . - . , . . . , ,

. . WSES-FSAR-UNIT-3

. ... II.I.E0 ".^. YSTFMy 15 14.2.12.2.30 CHILLFD WATEF -.. ... . -

8 14.2.12.2.30.1 Objective To verify the proper operation of the Chilled Water -=d 0 pplementary A 15

. Chi-Iled-Wat System 8

14.2.12.2.30.2 Pterequisites 18 A. Construction activities on the systems to be teated are complete.

B. Test instrumentation is available and calibrated. l 29 C. Plant systems required to support testing are operable, or temporary 15

, systems are installed and operable.

i Permanently installed instrumentation is operable and calibrated. 29 D.

14.2.12.2.30.3 Test Method .

A. Verify all control logic.

8 B. Demonstrate that each chilled water trais can be operated from its local and reeote manual station.

C. Verify that each chilled water unit performs as designed and supplies chilled water at rated flow and teeperature. l 15 8

i ra s D. Verify chilled water flow to all supplied components. l

s E. Verify that the chilled water systems respond automatically to the  ! 18 l appropriate engineered safety features actuation signal (ESFAS). l 15 l 8 F. Verify the proper operation of all protective devices, controls, interlocks, instrumentation, and alarms, using actual or simulated l 15 inputs.

' 8 14.2.12.2.30.4 Acceptance Criteria

' The Chilled Water System rf "_;pi:_:;teey-Wetee-System perform 3as 15

! described in Subsection 9.2.9.

l 4

f 14.2-59 Amendment No. 29, (10/82)

- + - _ - , - - - . . - . _ _ _ , _ _ _ _ _ _ _ _ _ _ _ __

~

l~ ,\ l ESES-FSAR-UNIT 3 TABLE 14.2-1 (Cont'd)

  1. \

s 8

Subsection y N Titic N

14.2.12.2.21 ' Annulus Negative Pressure And Vacuum Relief Systems 14.2.12.2.22 \ Containment Combustible Gas Control System ,

l15 14.2.12.2.23 Airborn Ra'dioactivity Removal System 14.2.12.2.24 CEDM Coolip System 8

14.2.12.2.25 Turbine Building Ventilating System 14.2.12.2.26 Cable Vault and Switchgear Area HVAC System 12.2.12.2.27 i Control Room Envelope'i'.VAC System

\

14.2.12.2.28 . RAB Normal Ventilation and Containment Purge, Systems .

15 N

s 3

12.2.12.2.29 Controlled Ventilation Area System kh' 14.2.12.2.30 Chilled Wate'dd.nd Sppi; ::tm Chill:dA

-Wete ystem 14.2.12.2.31 RAB Miscellaneous HVAC System 14.2.12.2.32 Fuel Handling Build (ng Ventilating l15 x Systes 14.2.12.2.33 \ Primary -hter Storage System 8

14.2.12.2.34 ReactoriCoolant System Quench Tank Subsystem ,

12.2.12.2.35 Pressurizer Pressure And Level Control System l15

\

14.2.12.2.36 Pressurizer ScfetylV'alve 8 i-14.2.12.2.37

.' g Chemical'AndYVoluse" Control System l15 Charging Subsyntem 8

l 14.2.12.2.38 Chasical And Voluse Control System l15 l Letdown Subsystem \ l h s 8 )

14.2.12.2.39 Volume Control Tank Subsystem .

1 I

14.2.12.2.40 Boronometer l15 l

14.2-147 Amendment No. 15, (2/81) ,

l l

l

, .-. - , . , , - - -