W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023

From kanterella
(Redirected from W3F1-2024-0020)
Jump to navigation Jump to search
Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023
ML24102A286
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/11/2024
From: Twarog J
Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
W3F1-2024-0020
Download: ML24102A286 (1)


Text

John Twarog Manager Regulatory Assurance 504-739-6747 Entergy Operations, Inc., 17265 River Road, Killona, LA 70057 W3F1-2024-0020 10 CFR 50.46 April 11, 2024 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 Waterford Steam Electric Station, Unit 3 NRC Docket No. 50-382 Renewed Facility Operating License No. NPF-38 This letter provides the Waterford Steam Electric Station Unit 3 (Waterford 3) 10 CFR 50.46(a)(3)(ii) reporting information pertaining to the Westinghouse Electric Company Emergency Core Cooling System (ECCS) performance Evaluation Models (EMs) for calendar year 2023.

This letter contains no new regulatory commitments.

Should you have any questions or require additional information, please contact John Twarog, Manager, Regulatory Assurance, at 504-739-6747.

Respectfully, John Twarog JT/llb Digitally signed by John Twarog DN: cn=John Twarog, c=US, o=Waterford 3 Nuclear Independent Oversight, ou=Nuclear Independent Oversight, email=jtwarog@entrgy.com Date: 2024.04.11 15:35:47 -05'00' John Twarog

~ entergy

W3F1-2024-0020 Page 2 of 2

Enclosure:

Waterford Steam Electric Station Unit 3 10 CFR 50.46 Annual Notification and Reporting for 2023 cc:

NRC Region IV Regional Administrator NRC Senior Resident Inspector - Waterford 3 NRC Project Manager - Waterford 3

Enclosure W3F1-2024-0020 Waterford Steam Electric Station Unit 3 10 CFR 50.46 Annual Notification and Reporting for 2023

W3F1-2024-0020 Enclosure Page 1 of 1 WATERFORD STEAM ELECTRIC STATION UNIT 3 10 CFR 50.46 ANNUAL NOTIFICATION AND REPORTING FOR 2023 There were no changes, error corrections, or enhancements to the 1999 Evaluation Model (EM), which is the EM used in Waterford 3 Large Break Loss-of-Coolant Accident (LBLOCA)

Emergency Core Cooling System (ECCS) performance analysis in calendar year 2023. In addition, there were no changes, error corrections or enhancements to the Supplement 2 Evaluation Model (S2M), which is the EM used in Waterford 3 Small Break Loss-of-Coolant Accident (SBLOCA) ECCS performance analysis in calendar year 2023.

The limiting PCT results for the large and small break LOCAs continue to meet the criteria of 10 CFR 50.46, paragraph (b) for calendar year 2023.

A summary of the information related to peak clad temperatures (PCT) and adjustment to peak clad temperatures is provided in the following table:

Summary of Information for Waterford 3 10 CFR 50.46 Annual Report for 2023 Analysis of Record (AOR)

Peak Clad Temperature (PCT), (°F)

Evaluation Model (EM) Used AOR Date Adjustment as of End-of-Year (EOY) 2023,

(°F)

Net PCT at the EOY 2023, (°F)

Small-Break Loss-of-Coolant Accident (SBLOCA) 1925 S2M 6/19/2009

-27 1898 Large-Break Loss-of-Coolant Accident (LBLOCA) 2092 1999 EM 7/16/2009

-6.1 2085.9