W3F1-2017-0023, Responses to Request for Additional Information Set 14 Regarding the License Renewal Application
| ML17089A358 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/30/2017 |
| From: | Chisum M Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| W3F1-2017-0023 | |
| Download: ML17089A358 (9) | |
Text
Entergy Operations, Inc.
1 7265 River Road Killona LA 70057-3093 n £9r,031 Tel 504-739-6660
_J Fax 504-739-6698 mchisumentergy. corn Michael R. Chisum Site Vice President Waterford 3 W3FI -201 7-0023 March 30, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Responses to Request for Additional Information Set 14 Regarding the License Renewal Application for Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
REFERENCES:
I Entergy letter W3FI -201 6-001 2 License Renewal Application, Waterford Steam Electric Station, Unit 3 dated March 23, 2016.
2.
NRC letter to Entergy Requests for Additional Information for the Review of the Waterlord Steam Electric Station, Unit 3, License Renewal Application Set 14 dated March 1, 2017.
Dear Sir or Madam:
By letter dated March 23, 2016, Entergy Operations, Inc. (Entergy) submitted a license renewal application (Reference 1).
In letter dated March 1
, 201 7 (Reference 2), the NRC staff made a Request for Additional Information (RAI) Set 14, needed to complete its review. Enclosure I provides the responses to the Set 14 RAIs.
This letter adds License Renewal Commitment 34 as shown in Enclosure 2. If you require additional information, please contact the Regulatory Assurance Manager, John Jarrell, at 504-739-6685.
I declare under penalty of perjury that the foregoing is true and correct. Executed on March 30, 2017.
Sincerely, MRC/AJH
Enclosures:
I
. Set 14 RAI Response Waterford 3 License Renewal Application
- 2. List of Regulatory Commitment
W3FI -201 7-0023 Page 2 of 2 cc:
Kriss Kennedy RidsRgn4MaiICenternrc.gov Regional Administrator U. S Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.
Arlington, TX 76011-4511 NRC Senior Resident Inspector Frances.Ramireznrc.gov Waterford Steam Electric Station Unit 3 Chris.Speernrc.gov P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Phyllis.Clarknrc.gov Attn: Phyllis Clark Division of License Renewal Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission April. Pulvirentinrc.gov Attn: Dr. April Pulvirenti Washington, DC 20555-0001 Louisiana Department of Environmental Ji.WileyLA.gov Quality Office of Environmental Compliance Surveillance Division P.O. Box 4312 Baton Rouge, LA 70821-4312 to W3F1-2017-0023 Set 14 RAI Response Waterford 3 License Renewal Application to W3F1-2017-0023 Page 1 of 4 RAI B.1.34-1b
Background:
By letter dated December 8, 2016, the staff issued RAI B.1.34-1a regarding the absence of a staff-approved withdrawal schedule for Capsule 277° (i.e., the surveillance capsule representing the period of extended operation). In its response dated January 19, 2017, the applicant identified a program exception to GALL Report AMP XI.M31, Reactor Vessel Surveillance. The program exception, in part, indicates that the applicant will submit the revised capsule withdrawal schedule separate from the license renewal application, but prior to implementation.
In its previous letter dated November 10, 2016 (i.e., response to RAI B.1.34-1), the applicant stated that, for the capsule located at 277°, WCAP-18002-NP suggested a removal time of the reactor vessel refueling outage nearest to 48 EFPY. The applicant also stated that the estimated fluence for the capsule at 48 EFPY is 4.51x1019 n/cm2 providing a fluence greater than the reactor vessel inner radius fluence calculated for 55 EFPY of 4.32x1019 n/cm2.
Issue:
In its response, the applicant did not describe the current EFPY of the unit as baseline information. In addition, the staff notes that, since the Reactor Vessel Surveillance Program is an existing program as required by Appendix H to 10 CFR Part 50, the program establishes and maintains staff-approved reactor vessel surveillance capsule withdrawal schedules for the license term. Given the applicants program exception that a withdrawal schedule for Capsule 277° is not submitted as part of the license renewal application, the staff notes that Waterford Unit 3 should submit the capsule withdrawal schedule for staffs review and approval (in accordance with 10 CFR Part 50, Appendix H) within a specific time period following the receipt of a renewed license (e.g., within 1 year following the receipt of a renewed license).
Request:
- 1. Provide the current EFPY of the unit.
- 2. Identify a program enhancement to submit a withdrawal schedule for Capsule 277° for staffs review and approval (in accordance with 10 CFR Part 50, Appendix H) within a specific time period following the receipt of a renewed license (e.g., within 1 year following the receipt of a renewed license). If such a program enhancement is not necessary, provide justification.
to W3F1-2017-0023 Page 2 of 4 Waterford 3 Response
- 2. The Reactor Vessel Surveillance Program will be enhanced to specify submittal of a withdrawal schedule for review and approval within one (1) year following the receipt of the renewed license. The surveillance capsule located at 277° will be removed at approximately 48 EFPY with a neutron fluence of between one and two times the peak reactor vessel wall neutron fluence at the end of the period of extended operation.
LRA Section A.1.34, Reactor Vessel Surveillance Program, LRA Section A.4 License Renewal Commitment List, LRA Table B-3, WF3 Program Consistency with NUREG-1801, and LRA Section B.1.34, Reactor Vessel Surveillance, are revised as follows. Additions are underlined; deletions are lined through.
A.1.34 Reactor Vessel Surveillance Program The Reactor Vessel Surveillance Program will be enhanced as follows.
Revise the Reactor Vessel Surveillance Program to specify submittal of a withdrawal schedule for Capsule 277° to the NRC for review and approval within 1 year following the receipt of the renewed license.
The enhancement will be implemented within one (1) year following issuance of the renewed operating license.
A.4 License Renewal Commitment List No.
Program or Activity Commitment Implementation Schedule Source (Letter Number) 34 Reactor Vessel Surveillance Enhance the Reactor Vessel Surveillance Program as described in LRA Section B.1.34.
Within one (1) year following issuance of the renewed license.
W3F1-2017-0023 for Set 14 to W3F1-2017-0023 Page 3 of 4 Table B-3 WF3 Program Consistency with NUREG-1801 NUREG-1801 Comparison Program Name Plant-Specific Program has Enhancements Program has Exceptions to NUREG-1801 Reactor Vessel Surveillance [B.1.34]
X X
B.1.34 REACTOR VESSEL SURVEILLANCE NUREG-1801 Consistency The Reactor Vessel Surveillance Program, with enhancement, will be is consistent with the program described in NUREG-1801,Section XI.M31, Reactor Vessel Surveillance, with the following exception.
Exceptions to NUREG-1801 The Reactor Vessel Surveillance Program has the following exception.
Elements Affected Exception
- 4. Detection of Aging Effects NUREG-1801 recommends that a reactor vessel surveillance capsule withdrawal schedule be submitted as part of a license renewal application. WF3 will submit the revised capsule withdrawal schedule separate from the license renewal application, but prior to implementationwithin one (1) year following issuance of the renewed license.
1
- 1. The Reactor Vessel Surveillance Program includes a commitment to specify submittal of a withdrawal schedule for review and approval within one (1) year following the receipt of a renewed license. The surveillance capsule located at 277° will be removed at approximately 48 EFPY with a neutron fluence of between one and two times the peak reactor vessel wall neutron fluence at the end of the period of extended operation.WF3 commitment management system includes a commitment to submit a reactor vessel surveillance capsule withdrawal schedule for future removal of the capsule located at 277°. The commitment specifies submitting the schedule along with its technical justification for NRC approval. In accordance with 10 CFR 50, Appendix H, Entergy will obtain NRC approval of the revised reactor vessel surveillance capsule withdrawal schedule prior to implementation.
to W3F1-2017-0023 Page 4 of 4 Enhancements NoneThe following enhancement will be implemented within one (1) year following issuance of the renewed operating license.
Element Affected Enhancement
- 4. Detection of Aging Effects Revise Reactor Vessel Surveillance Program procedures to specify submittal of a withdrawal schedule for Capsule 277° to the NRC for review and approval within one (1) year following the receipt of the renewed license.
to W3F1-2017-0023 List of Regulatory Commitments Waterford 3 License Renewal Application to W3F1-2017-0023 Page 1 of 1 EMPTY A.4 LICENSE RENEWAL COMMITMENT LIST (ADDITION)
No.
Program or Activity Commitment Implementation Schedule Source (Letter Number) 34 Reactor Vessel Surveillance Enhance the Reactor Vessel Surveillance Program as described in LRA Section B.1.34.
Within one (1) year following issuance of the renewed license.