W3F1-2002-0105, November 2002 Monthly Operating Report for Waterford 3

From kanterella
(Redirected from W3F1-2002-0105)
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Waterford 3
ML023500214
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/06/2002
From: Murillo R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
A4.05, W3F1-2002-0105
Download: ML023500214 (6)


Text

%Entarg W3F1-2002-0105 A4.05 PR December 6, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject report which covers the operating statistics for the month of November, 2002. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact M. K. Brandon at (504) 739-6254.

Very truly yours, R.J. Murillo Acting Licensing Manager RJM/MKB/cbh Attachment cc:

E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office 0 S Entergy Operations, Inc.

17265 River Road Killona, LA 70066 Tel 504 739 6650

NRC MONTHLY OPERATING REPORT WATERFORD 3 for November, 2002

SUMMARY

OF OPERATIONS The unit operated at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period.

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.

Page I of 5 12/5/2002

OPERATING DATA REPORT DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 December 5, 2002 Jim Pollock (504) 739-6561 OPERATING STATUS

1. Reporting Period November, 2002 Gross Hours in Reporting Period 720
2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) "

1,075 Design Electrical Rating (Net MWe) 1,104

3. Power Level to which Restricted (if any) (Net MWe)

NIA

4. Reason for Restriction (if any)

N/A Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)

Unit Capacity Factor (using DER)

Unit Forced Outage Rate THIS MONTH 720.0 0.0 720.0 0.0 2,471,286 828,493 795,559 100.0 100.0 100.0 100.0 102.8 100.1 0.0 YEAR TO DATE 7,421.8 0.0 7,393.8 0.0 25,082,163 8,376,897 8,024,834 92.6 92.6 92.2 92.2 93.1 90.7 0.0 CUMULATIVE 129,505.2 0.0 128,218.5 0.0 427,179,199 143,172,714 136,757,140 86.0 86.0 85.1 85.1 84.4 82.2 3.7 Page 2 of 5

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

18.

12/5/2002

OPERATING DATA REPORT DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 December 5, 2002 Jim Pollock (504) 739-6561 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

NONE

20. If Shutdown at end of report period, estimated date of startup:
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE Hours in Reporting Period Unit Forced Outage Hours

24. Nameplate Rating (Gross MWe)

Max. Dependable Capacity (Gross MWe)

CUMULATIVE 720 8,016 150,649 0.0 0.0 4,897.9 1,200 1,120

25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:

NIA 12/5/2002

22.

23.

NIA Page 3 of 5

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 December 5, 2002 Jim Pollock (504) 739-6561 Reporting Period :

November, 2002 DAY Avg. Power Level 1

1,106 2

1,107 3

1,106 4

1,104 5

1,104 6

1,102 7

1,101 8

1,100 9

1,099 10 1,100 11 1,107 12 1,108 13 1,108 14 1,107 15 1,106 (NET MWe)

DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1,106 1,106 1,106 1,106 1,094 1,096 1,107 1,107 1,106 1,108 1,108 1,108 1,109 1,108 1,109 INSTRUCTIONS:

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Reflects On-Line Net Generation.

Page: 4 of 5 12/5/2002

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 December 5, 2002 Jim Pollock (504) 739-6561 REPORTING PERIOD:

Date Number (yymmdd)

NA Type November, 2002 Outage Duration Shutdown (Hours)

Reason Method Cause, Comments and Corrective Actions TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination I - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)

Page 5 of 5 "k'k 1215/2002