U-604102, Response to Request for Additional Information Regarding the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11

From kanterella
Jump to navigation Jump to search
Response to Request for Additional Information Regarding the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11
ML12335A252
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/15/2012
From: Noll W
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-604102
Download: ML12335A252 (2)


Text

Exeton Generation,"

Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604102 10CFR50.54(p)

November 15, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Response to NRC Request for Additional Information Regarding Clinton Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan

References:

1. Letter from William G. Noll (Exelon Generation Company, LLC) to USNRC, Clinton Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11, dated July 13, 2012
2. Request for Additional Information - Letter from Joel S. Wiebe (USNRC) to Michael J. Pacilio (Exelon Generation Company, LLC), Clinton Power Station Unit 1, dated September 13, 2012
3. Request for Additional Information - Letter from Joel S. Wiebe (USNRC) to Michael J. Pacilio (Exelon Generation Company, LLC), dated October 5, 2012 Exelon Generation Company, LLC (EGC) submitted the updated Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan for Clinton Power Station in Reference 1. In Reference 2, the U. S. Nuclear Regulatory Commission (NRC) requested additional information. In Reference 3, the NRC provided clarifying information regarding the request for additional information. Attached is the EGC response to the Reference 2 questions as clarified in Reference 3.

One regulatory commitment is contained in the attachment of this letter If there are any questions concerning this letter, please contact Mr. Gerald Armstrong, Site Security Manager at (217) 937-2900.

Sincerely, William G. Noll Site Vice President The Attachment contains Safeguards Information SD0 Upon Separation This Page is Decontrolled

U.S. Nuclear Regulatory Commission U-604102 Page 2 of 2

Attachment:

Response to Request for Additional Information (Contains Safeguards Information)

EET/blf cc: Regional Administrator - NRC Region III (without attachment)

The Attachment contains Safeguards Information Upon Separation This Page is Decontrolled