U-600266, Forwards High Energy Line Break/Moderate Energy Line Break, Supplementary Review for Illinois Power Co. Rept Suppls Independent Design Review.All Issues Satisfactorily Addressed
| ML20133A720 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/30/1985 |
| From: | Spangenberg F ILLINOIS POWER CO. |
| To: | Butler W Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20133A723 | List: |
| References | |
| U-600266, NUDOCS 8510020288 | |
| Download: ML20133A720 (1) | |
Text
-...
U-600266 L40-85(09-30)-L 8G.150a ILLINDIS POWER COMPANY IP CLINTON PCMER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 i
Se'ptember 30, 1985 Docket No.50-461 Director of Nuclear Reactor Regulation Attention:
Mr. W. R. Butler, Chief I
Licensing Branch No.2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Clinton Power Station Unit 1 Independent Design Review
Dear Mr. Butler:
As a supplement to the Clinton Independent Design Review (IDR),
Bechtel has reviewed additional Sargent & Lundy work on high energy line break (HELB) and moderate energy line break (MELB) analysis. This review is documented in the attached report by Bechtel Power Corporation. This report concludes that all HELB/MELB issues have been resolved satisfactorily, subject to NRC review and acceptance.
With the submittal of this report, Illinois Power believes that we have provided all of the'information needed by the NRC to close out the HELB/MELB issues.
please advise.
h00{
If you have any further comments or requests for information.
il Sincerely yours A)
CA, N
i p.
F. A.
pangenberg g@@
Director - Nuclear Licensing IC'i Nuclear Station Engineering T-sumo g 'CN E
DW/kaf S. 6oW g c.4 Attachment 3C@
cc:
B. L. Siegel, NRC Clinton Licensing Project Manager A(.6 gq NRC Resident Office
- ggr, l'N Regional Administrator, Region III USNRC g
Illinois Department of Nuclear Safety 44,
)C 4 pc(L h
A
__