TXX-6692, Informs That Completion Dates for Correction of Violations Noted in Insp Repts 50-445/85-18 & 50-446/85-15 Rescheduled. Unit 1 Will Be in Full Compliance by 880301 & Unit 2 by 881130

From kanterella
(Redirected from TXX-6692)
Jump to navigation Jump to search
Informs That Completion Dates for Correction of Violations Noted in Insp Repts 50-445/85-18 & 50-446/85-15 Rescheduled. Unit 1 Will Be in Full Compliance by 880301 & Unit 2 by 881130
ML20237K084
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/31/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-6692, NUDOCS 8709040184
Download: ML20237K084 (3)


Text

-

~

h a -e Log # TXX-6692

""lll"

.- = File # 10130

- 2 IR 85-18 r = IR 85-15

  1. ' *" **I illELECTRIC Will!am G. Coumil Eucutne Vice Vrculent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS: 50-445/85-18 AND 50-446/85-15 REVISED DATE OF FULL COMPLIANCE FOR NOTICE Of VIOLATION (NOV) ITEMS B AND C

REFERENCE:

1) TUGC0 Letter TXX-4848 from W. G. Counsil to l

E. H. Johnson dated December 12, 1986

2) TUGC0 Letter TXX-6134 from W. G. Counsil to E. H. Johnson dated December 12, 1986
3) TU Electric Letter TXX-6386 from W. G. Counsil I to NRC dated April 14, 1987 1
4) TV Electric Letter TXX-6402 from W. G. Counsil to NRC dated May 7, 1987
5) TV Electric Letter TXX-6545 from W. G. Counsil to NRC dated June 26, 1987 I

Gentlemen:

l i

Reference (4) provided our updated response to NOV 445/8518-V-01 (Item B).  !

Our response stated that full compliance would be achieved with the completion i of CAR-063 scheduled for August 31, 1987 for Unit I and common systems, and i March 31, 1988 for Unit 2 systems. CAR-063 includes other discrepancies (such j as traceability of cable pigtail extensions) in addition to the discrepancy identified in the Notice of Violation (conduit lengths in excess of that allowed by the electrical specification). Correction of all Unit 1 and common l discrepancies identified in CAR-063 has been incorporated into our Post Construction Hardw&ce Validation Program (PCHVP). The PCHVP is scheduled for completion by March 1,1988.

In order to more efficiently utilize the resources available to the project, {

the correction of CAR-063 discrepancies in Unit 2 systems has been rescheduled '

for November 30, 1988.

Accordingly the date of full compliance for 445/8518-V-01 is hereby revised to  !

be March 1, 1988 for Unit I and common systems, and November 30, 1988 for Unit '

2 systems.

l 8709040184 070831 DR ADDCK0500g5 g#l 400 nnh ause Street LB SI DaHas, Texas 75201 o

TXX-6692 August 31, 1987 Page 2 Reference (5) stated that an updated response to NOV 445/8518-V-15 (Item C) would be provided by August 31, 1987. Our investigation of an alternate method to evaluate the effects of fire on instrumentation tubing has not been completed. Accordingly our date for submission of an updated response to NOV 445/8518-V-15 is hereby rescheduled to be no later than January 15, 1988.

Very truly yours,

.S @/kI l W. G. Counsil By: .

G. S. Keeley Manager, Nucg tig _ sing RSB/mlh c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)