TXX-6545, Advises That Util Evaluating Alternate Resolution Re Potential Zinc Embrittlement of Stainless Steel Tubing & walk-down Activities Suspended Pending Completion of Evaluation,Per 870414 Response to Notice of Violation
| ML20216C849 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/26/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-6545, NUDOCS 8706300385 | |
| Download: ML20216C849 (1) | |
Text
M Log # TXX-6545 FE File # 10130 IR 85-18
__r
=
IR 85-15 Ref: 10CFR2.201 7UELECTRIC William G. Counsil Executive Vke President U. S. Nuclear Regulatory Commission i
Attn:
Document Control Desk Washington, D. C. 20555 L
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS.: 50-445/85-18 AND 50-446/85-15 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION (NOV) ITEM C
REFERENCE:
- 1) TUGC0 Letter TXX-4848 from W. G. Counsil to E. H. Johnson dated July 9, 1986
- 2) TUGC0 Letter TXX-6134 from W. G. Counsil to E. H. Johnson dated December 12, 1986
In TV Electric's response (Reference 3) to NOV 445/8518-V-15 (Item C), we stated that an engineering walk-down would be performed by June 30,1987, to identify conditions which were not in accordance with DCA 13,023, Rev. 2.
TV Electric is currently evaluating an alternate resolution concerning potential _-
zinc embrittlement of stainless steel tubing and the walk-down activities have been suspended pending completion of this evaluation.
TU Electric will submit a revised response describing our planned actions and completion dates no later than August 31, 1987.
Very truly yours, W. G. Counsil RSB/mlh c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)