TXX-4879, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860207.Evaluation Continuing.Next Rept Will Be Submitted by 860815

From kanterella
(Redirected from TXX-4879)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860207.Evaluation Continuing.Next Rept Will Be Submitted by 860815
ML20206S902
Person / Time
Site: Comanche Peak  
Issue date: 06/27/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-08, CP-86-8, TXX-4879, NUDOCS 8607070448
Download: ML20206S902 (1)


Text

_

Log # TXX-4879 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY BKYWAY TOWER. 400 NORTH OLIVE STREET. L.B. S1. DALLAS. TEXA8 7S301 l

June 27, 1986

.M O S Sifn'A

$$bbb Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects M ~ 2E U. S. Nuclear Regulatory Commission p

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)

Dear Mr. Johnson:

On February 6,1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the control of stamps used to identify Super Hilti Kwik Bol ts. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted interim reports logged TXX-4728 and TXX-4773, dated March 7, 1986', and April 24, 1986, respectively.

We are continuing our evaluation and anticipate submitting our next report by August 15, 1986.

Very truly yours, fiVMH W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8607070448 860627 PDR ADOCK 05000445 S

PDR f6-? 7 g.,704 A DEVERION OF TEXAN UTil2TIEN EDELTNIC COMPANY L

.