TXX-4773, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Final Determination Will Be Based on Review of Actual Conditions Conducted by S&W.Next Rept Expected by 860627
| ML20203P076 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/24/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-08, CP-86-8, TXX-4773, NUDOCS 8605060318 | |
| Download: ML20203P076 (1) | |
Text
O O
Le9, 1xx-4773 File # 10110 TEXAS UTILITIES GENERATING COMPAhT MKYW AY TOWER
- 400 NORT15 O1JVE NTREET,1.B. IB L e IDALI.Aal. TEEAN TS308 April 24, 1986 ggggg)
APR 2 91986 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects
~
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION D0CKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)
Dear Mr. Johnson:
On February 6, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the control of stamps used to identify super hilti kwik bolts.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4728, dated March 7, 1986.
The final determination of this issue will be based upon review of actual conditions as documented by nonconformance reports.
This evaluation will be conducted by Stone & Webster Engineering Corporation. We anticipate submitting our next report by June 27, 1986.
Very truly yours, W. G. Counsil JCH/arh I
c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8605060318 860424 PDR ADOCK 05000445 S
PDR A DIVISION OF TEXAN UT11111EM ELECTRIC CtDMPANY