Interim Deficiency Rept CP-85-31 Re Possible Impact of Addl Weight on Electrical Raceway Support Sys.Initially Reported on 850827.Analysis Required to Resolve Issue Scheduled for Completion by 860615.Final Rept Will Be Submitted by 860707
ML20140D049
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/22/1986
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-31, TXX-4672, NUDOCS 8601290074
Download: ML20140D049 (1)


Text

Log # TXX-4672 TEXAS UTILITIES GENERATING COMPANYFi1e # 10110 SKYWAY TOWER . 400 NORTH OLIVE NTREET. L.H. a R . DALLAN. TEXA8 75201 January 22, 1986 EMNk??.?,".2 Mr. Eric H. Johnson, Acting Director sj Division of Reactor Safety and Projects P y @dg U -

U.S. Nuclear Regulatory Commission u:

611 Ryan Plaza Drive, Suite 1000 i

\

Arlington, TX 76012 i 'gn 2 Ag ;g 1

\, J

SUBJECT:

COMANCHEPEAKSTEAMELECTRICSTATI0kO DOCKET NO. 50-445 ELECTRICAL RACEWAY SUPPORT SYSTEM SDAR: CP-85-31

Dear Mr. Johnson:

On August 27, 1985, we verbally notified your Mr. D. Hunnicutt of a defi-ciency regarding the possible impact on the electrical raceway support system of additional weight imposed by the installation of separation berrier and radiant energy shield material. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted interim reports TXX-4564 and TXX-4599, dated September 19, 1985, and October 16, 1985, respectively. The evaluation and disposition of this issue will be formulated in the course of the conduit and cable tray support design adequacy programs (CPRT Program Plan Item VIII). The analy-sis required to resolve this issue is scheduled for completion by June 15, 1986.

We are continuing our evaluation and anticipate completion of our final report by July 7, 1986.

Very truly yours, td. C,. N W. G. Counsil h

S DO [ By:

D.R. Woodlan Licensing Supervisor JCH/gj c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)