TXX-4599, Interim Deficiency Rept SDAR-192 Re Possible Impact of Previously Unconsidered Weight on Electrical Raceway Support Sys.Initially Reported on 850827.Evaluation Continuing.Next Rept Anticipated by 860122
| ML20133N291 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/16/1985 |
| From: | Counsil W, John Marshall TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Denise R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR-192, TXX-4599, NUDOCS 8510280487 | |
| Download: ML20133N291 (1) | |
Text
Log e TXX-4599 TENAS UTILITIES GENERATING CO31PANY File # 10110
%KY W AY TOWER e etMD NON TH OLI% E NI'M EET. E El M t. ED A B. LAM, T E 4 A M T S2H B anS^,7,?c&f,"d5 October 16, 1985 Mr. R. P. Denise, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission Region IV i
611 Ryan Plaza Drive, Suite 1000 O U 2 1 19 3 Arlington, Texas 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION
~
~~
DOCKET NO. 50-445 ELECTRICAL RACEWAY SUPPORT SYSTEM QA FILE:
CP-85-31, SDAR-192
Dear Mr. Denise:
On August 27, 1985, we verbally notified your Mr. D. Hunnicutt of a deficiency regarding the possible impact of previously unconsidered weight on the electrical raceway support system imposed by the installation of separation barrier and radiant energy shield material. We have submitted an interim report logged TXX-4564, dated September 19, 1985.
We are continuing our evaluation and anticipate completion by January 22, 1986.
Very truly yours, MM W. G. Counsil ByN ktkd'$f J. S. Mbrshall Licensing Supervisor c-NRC Region IV (0 + 1 copy)
Director, inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8510280487 851016 PDR ADOCK 05000445 S
,. <,,% 4 j f-lp a,,,,,,,,,,,,e re n, ama.m :~ e,.ecra.sc..,,,,.m l