TXX-4564, Deficiency Rept SDAR-192 Re Impact of Previously Unconsidered Weight on Electrical Raceway Support Sys Imposed by Barrier Installation.Initially Reported on 850827.Evaluation to Be Completed by 851018
| ML20132B017 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/19/1985 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Hunter D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR-192, TXX-4564, NUDOCS 8509260078 | |
| Download: ML20132B017 (1) | |
Text
_
3 3 @ M. OM_. M. A)
SFP 2 01985 TEXAS UTILITIES GENERATING COMPANY RKYWAY TOWER. 400 NORTH OLIVE frTREET. L.B. 8 8. D ALLAm. TEX AR 75301
]
September 19, 1985 witum a coussit TXX-4564 Mr. D.R. Hunter, Chief Reactor' Project Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 Docket No.: 50-445 COMANCHE PEAK STEAM ELECTRIC STATION ELECTRICAL RACEWAY SUPPORT SYSTEM QA FILE: CP-85-31, SDAR-192 FILE N0.:
10110
Dear Mr. Hunter:
On August 27, 1985 we verbally notified your Mr. D. Hunnicutt of a defi-ciency regarding the possible impact of previously unconsidered weight on the electrical raceway support system imposed by the installation of separation barrier and radiant energy shield material.
We are continuing our evaluation and anticipate completion by October 18, 1985.
Very truly yours, f
SS W.G. Counsil WGC:mim cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, DC 20555 8509260078 850919 PDR ADOCK O 5
cg s
ep w w7 6
A otvssson or TExA8 E1 TIE 2TTES ELECTRIC COMPANY 1
i Oi
(
1