TXX-4512, Advises That Util Power Corp Recommendation Incorporated Into Overall Turbine Generator Insp Plan.Requests That Licensing Condition Re Turbine Disk Insp Be Modified to Require Ultrasonic Insp Once Every 50,000 Operating Hours
| ML20136G384 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/15/1985 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Noonan V NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM) |
| References | |
| TXX-4512, NUDOCS 8511220336 | |
| Download: ML20136G384 (2) | |
Text
_ ___ _ __ ____-_ ___
~
Log # TXX-4512
- hi0clo TEXAS UTILITIES GENERATING COMPANY M KV WAY TE DWEN ' efHD NE DNTil E) LIVE MTHEET, L.H. 888 ' DALLAN TEXAss 1330 6 wituA=..<.ou.. t July 15, 1985 Director of Nuclear Reactor Regulation Attention: Mr. Vincent S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 TURBINE DISK INSPECTION
Dear Mr. Noonan:
Low pressure turbine disk cracking in Utility Power Corporation (UPC) turoines was the subject of a meeting with the NRC staff in Bethesda on Septemoer 19, 1984.
During this meeting UPC representatives presented two engineering reports; ER-8401 " Ultrasonic Disk Inspection" dated July, 1984 and ER-8402 "ProDanility of Disk Cracking Due to Stress Corrosion", dated August 1984. These reports which were subsequently docketed by TXX-4323 dated Octooer 5,1984, provided the basis for the UPC reconnended L.P.
turoine disk inspection interval of 50,000 operating hours.
i CPSES has incorporated the UPC reconnendation into the overall Turoine Generator Inspection Plan (attached) for Units 1 and 2.
We request that the current licensing condition concerning turoine disk inspection be modified to only require an ultrasonic inspection of each low pr9ssure turoine disk once every 50,000 operating hours.
Should you have any questions in this matter, please contact this office.
Sincerely,
,/l
' C'
?:.2e W. G. Counsll 0j i
BSD/grr F
0 4 b B511220336 850715 PDH ADOCK 05000 5
D 9
.A
+-
TUR8INE GENERATOR INSPECTION PLAN l
REFUELING OUTAGE '
Cott'OrlEfti ACTIVITY I
2 3
4 5
6 7
8 9,
o
!!.P. Turbine Major inspection X
X Minor Inspection -
X X
X X
L.P. Turbine il Major Inspection
- X X
Minor Inspection X
X X
X L.P. Tushine #2 Major Inspection
- X X
Minor Inspection X
X X
X II.P. Turbine Stop & Control Valves Inspection X
X X
X L.P. Turbine Stop & Control Valves Inspection X
X X
X Iurbine Auxiliaries Control System Inspection X
X Lube Oil System inspection X
X Lube Oil Coolers Inspection X
X X
X X
1 Geniera tor thjor Inspection X
X l
Minor Inspection X
X Visual Inspection X
X X
X X
X l
l Generator Auxiliaries Seal Oil System Major Inspection X
X l
Primary Water System Major Inspect. X X
Gas System Major Inspection X
X Seal Oil System Minor Inspection X
X Primary Water System Minor Inspect.
X X
Gas System Minor Inspection X
X l
Exciter ihjor Inspection X
X
!!inor Inspection X
X Visual Inspection X
X X
X X
X
- li.cludes UI of L.P. Disk Bore and Keyway l
- - -