TXX-4320, Forwards Justification Required to Allow Fuel Load & Full Power Operation Re Deficiencies Identified in 840702 & 0830 Ltrs Concerning Impact of Temp Due to Main Steam Line Break Outside Containment

From kanterella
(Redirected from TXX-4320)
Jump to navigation Jump to search
Forwards Justification Required to Allow Fuel Load & Full Power Operation Re Deficiencies Identified in 840702 & 0830 Ltrs Concerning Impact of Temp Due to Main Steam Line Break Outside Containment
ML20093C446
Person / Time
Site: Comanche Peak  
Issue date: 09/28/1984
From: Beck J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Youngblood B
Office of Nuclear Reactor Regulation
References
TXX-4320, NUDOCS 8410100542
Download: ML20093C446 (1)


Text

g

.u.

Log # TXX-4320 TEXAS UTILITIN GENERATING COMPANY File # 10010 MKYWAY TOWER. 400 NORTH uLIVE MTREET, L.B. MI

  • DALLAM TEXAM 75201 September 28, 1984 p l Direct 6r. of Nuclear l Reactor. Regulation

~

Attention:

Mr. B. J. Youngblood, Chief Licensing Branch No. 1

-Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555

SUBJECT:

CO MNCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 IMPACT OF TEMPERATURE DUE T0 M IN STEAM LINE BREAK OUTSIDE CONTAINENT ON EQUIPENT THAT REQUIRES ENVIRONMENTAL QUALIFICATION n re Sir:

e References 1 and 2 (attached) identified a deficiency in the temperature envelope used to environmentally gaalify equipment for High Energy Line Breaks (HELB's) outside containmerit. Reference 2 provided that justification would be provided, if needed, to allow fuel load. Attached is the justification required to allow fuel load and full power operation.

Respectfully, O s g), f-L ohn W. Beck Manager. Licensing DRW/grr Attachment Distribution: Original plus 40 copies 8410100542 840928 PDR ADOCK 05000445 PDR g

Y, A...M..........A..,.

....M.

m

p.

9 TEXAS UTILITIES GENERATING COMPANT SKYWAY TOWER. 400 NORTH OLIVE STREET L.B. St. DALLAB. TEXAB 75201

m. ".'f.!I.SJ"'d!*.

July 2, 1984 TXX-4212 Mr. E.H. Johnson, Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Comission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:

50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION IMPACT OF HELB TEMPERATURES ON QUALIFIED EQUIPMENT OUTSIDE CONTAlfMENT QA FILE:

CP-84-12, SDAR-136 FILE N0.:

10110

Dear Mr. Johnson,

On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding the temperature envelope requirements on the environmental qualification of equipment outside containment for high energy line breaks (HELB).

We are continuing our evaluation and anticipate completion by August 31, 1984.

Very truly yours, LYw BRC/tig cc: SC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555

_a' A Dit'IM10M UV TEXAm E*TILSTSEn ELarTngg' congpANy

e s

g,.

TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWER e 400 NORTH OLIVE MTREET, L.B. 48

  • DALLAM TEXAN T3301
m..s.u..r mu-.r..s August 30, 1984
n. ctaa TXX-4293 Mr. E.H. Johnson, Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:

50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION IMPACT OF HELB TEMPERATURES ON QUALIFIED EQUIPMENT OUTSIDE CONTAlfNENT QA FILE: CP-84-12, SDAR-136 FILE N0.:

10110

Dear Mr. ~ Johnson,

On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding the temperature envelope requirements on the environmental qualification of equipment outside containment for high energy line breaks (HELB). We have submitted an interim report, TXX-4212, dated July 2,1984.

As a result of industry wide application of this unreviewed safety question, the Westinghouse Owners Group has developed a program to address the issue on a generic basis. The program has been presented to the rRC and is summarized in Westinghouse letter OG-133 which is available for your inspector's review at the CPSES Site.

The tentative schedule indicates completion in approximately twelve (12) months. We are currently reviewing the need to provide Justifications for Interim Operation (JIO) in order to preclude impacting fuel load. We will continue to monitor activities related to this issue ano provide a status report by October 31, 1984.

Very truly yours, I&

~

t. <

cww$$f;iy

- U TWT '

BRC/tig cc:

FRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555 a usuronen.v Or sex.sn erso.mrn uro rnua amuu.<.vr m

e.

ATTACHENT TO TXX-4320 In June 1984, various utilities were informed by Westinghouse that there existed an unreviewed safety question concerning an increase in the energy release rate resulting from a main steam line break.

This phenomenon results from a superheating of the steam in the steam generator after.the tube bundle becomes uncovered.

This increased energy release rate will generally cause an increase in the severity of the environmental conditions in the areas affected by a main steam line break.

At CPSES, the areas affected by the main steam line break are in the steam and feedwater piping penetration areas.

The penetration areas are isolated from the remainder of the plant and the piping is then routed outside the safeguards building to the turbine deck. CPSES is required by Q010.20, to evaluate the environmental effects of a 1.0 ft2 non-mechanistic crack in a main steam pipe between the moment restraint and the containment wall.

The new energy release rates require that the environmental analysis for this area be redone.

The environmental analysis was redone using representative mass and energy release data for four loop plants.

The data were supplied by Westinghouse.

These data were conservatively determined and incorporate the superheat concern.

The subcompartment environmental analysis model previously used was rerun using the new input data. A range of break sizes (1.0, 0.5 and 0.1 square feet) were run to investigate the effects of the new blowdown on the peak environmental conditions.

It was determined that the 1.0 ft2 break still yielded the most severe transient.

The new mass and energy release rates are nearly identical to what was used in the previous analysis up to the point where the superheat effects start to appear.

The time necessary for the superheat effects to appear is dependent on the break size and this is why the range of break sizes was investigated.

The steam line break scenario for the 1.0 ft2 break is as follows:

1) break 2) reactor trip 3) feedwater isolation 4) safety injection 5) steamline isolation 6)'

superheat effects appear For this scenario, all safety functions i.e., trip and isolation signals, occur before the superheat effects appear.

In addition to the original analytical model, the effects of the fire protection sprinklers were taken into account.

The previous analysis was conservative in that it did not include the sprinkler effects.

The sprinkler system acts to cool the environment. Because the sprinkler system will actuate before the superheat effects appear, the qualification envelopes from the previous analysis are not exceeded except in the compartment with the break.

In this break volume, there is a new temperature peak of 3750 for a duration of about 40 seconds above the original envelope. This occurs after sprinkler activation and is becatise the steam flow is large enough to partially offset the quenching effects of the sprays. This is acceptable because it is postulated that all equipment in the break room is rendered inoperable.

The inoperability of this equipment will allow the affected steam generator to blow dry, which has been analyzed in Chapter 15 of the CPSES FSAR. The equipment in the remaining rooms was reviewed to insure that they were not adversely affected by the failure of any equipment in the break volume. The only adverse effect of real concern was the potential failure of the MSIYs associated with the unaffected steam lines due to the failure of class 1E cables in the break volume. An evaluation was performed by examining the applicable electrical drawings and cable and raceway schedules.

The result of that evaluation was that proper cable routing and circuit protection is provided to assure the operability of the MSIVs in the unfaulted steam if nes.

In sunniary, the new analysis shows that previous environmental qualification efforts are still. valid. Taking credit for the sprays keeps the temperatures in the unaffected compartments within the original oualification envelope (maximum temperature 3250F, peak pressure below 24.0 psia).

Equipment within the affected compartment performs all required functions before the superheat effects are felt and can fail later without affecting the ability to mitigate the break and safely shutdown.

Therefore the change in the energy release rate, as provided by Westinghouse poses no safety concern for the CPSES.

s

~

. -.