TEXAS UTILITIES SERVICES INC.
2(M18 Ili1V %N TUWEli h\\tJ.AR,TEXAM M2OIG)M)
Log # TXX-3621 File # 10010 February 14, 1983 Mr. S. B. Burwell Licensing Project Manager U. S. Nuclear Regulatory Comnriision Office of Nuclear Reactor Resulation Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 8 50-446 FSAR AMENDMENT 38 DESCRIPTION
Dear Mr. Burwell:
Please find attached a table providing the description of Amendment 38, dated February 14, 1983.
If you have any questions or comments, please call.
Sincerely,
}fduW J. S. Marshall RWH: tis Attachnent cc:
H. C. Schmidt
$O01 B302230460 830214
~
l PDR ADOCK 05000445 A
CPSES/FSAR-AMENDMENT 38 DESCRIPTION February 14, 1983 SECTION-DESCRIPTION OF CHANGE 1.2 Removes references to Seismic Category I from fire protection piping (Changed to Class 5)..
T1.7-1 Provides update to RCS high point vent system.
1A(B)
Upgrades latest edition of ANSI /ASME N-509 instead of earlier versions referenced in R.G.1.140.
3.5 Incorporates a new reference (Bechtel topical report).
3.7B Provides clarification on when the simplified design method is used.
3.8 Deletes reference of ASTM Spec.
A20-74b, " Specification for General Requirements for Steel Plants for Pressure Vessel s".
Steel plates for pressure vessels are not elements of containment internal structure s.
3.9B Refer to 3.7B.
CPSES/FSAR SECTION DESCRIPTION OF CHANGE 3.11N Provides update to explicitly define compliance with GDC-4 for mechanical equipment qualification.
3.11B Provides update to explicitly define compliance with GDC-4 for mechanical equipment.
Provides update to postulated environments.
T3.11B-2 Provides update to postulated envi ronments.
APP 3A Provides update to Environmental T4-1 8 T5-1 Qualification tables.
5.1 Provides update to RCS high point vent description.
6.2 Provides clarification of hydrogen calculations.
l l
Provides change to description of containment boundary and testing requirements as they pertain to the valve isolation tanks. -
CPSES/FSAR SECTION DESCRIPTION OF CHANGE' Deletes specific weight information for galvanized material. Original figures were indicative of nominal weight.
T6.2.4-3 Provides correction of " Valve Closure Time". These valves do not receive containment isolation signal s.
T6.2.5-3 Deleted as a result of Hydrogen Reanalysis ( A-36).
6.3 Provides correction to the description of safety injection pump injection lines to be tested.
7.3 Provides correction to description for the control of AFW System valves.
T7.5-7 Provides update to the range of RHR flow meter.
7.7 Provides update to reflect actual turbine runback valves.
8.3 Provides updates to the capacities for batteries BTIED3 and 4.
9.1 Provides editorial changes.
l i l r-a
~
-a
CPSES/FSAR SECTION.
DESCRIPTION OF CHANGE 9.2 Provides clarification of SSWSs w.r.t. sharing. (i.e.~ traveling screen s).
Clarification of SSWSs w.r.t. - heavy loads.
9.5
. Removes " electric fire pump failure to start" as a cause of actuation of diesel fire pump.
Provides update to fire loads (Fire Zone 19)
Provides title changes in operations.
11A Provides update on current water use.
13.1 Provides startup organizational
(
changes.
F13.1-2 F13.1-5 13.2 Provides update of general employee training programs.
13.5 Provides update on plant operating procedures.
T13.5-1
CPSE$/FSAR SECTION DESCRIPTION OF CHANGE T13.5-2~
T13.5-3.
Provides update on plant operating procedures.
T13.5-4 T13.5-5 T13.5-9 14.2 Provides startup organizational changes.
T14.2-2 Provides update to test procedures for fire protection, startup transformers, nuclear instrumentation and AFW System.
F14.2-1 Provides startup organizational changes.
F17.1-6 Provides update to organizational chart.
F17.2-1 Provides update _to TUGCo organizational chart.
17A
- Provides update to Q-list..
'i CPSE'S/FSAR.
SECTION DESCRIPTION OF CHANGE T17A-1 Provides update to RCS high point vent system.
Provides clarification of component-quality requirements.
II.B.1 Provides update to RCS high point vent system description.
II.F.2 Provides update to inadequate core cooling monitoring instrumentation system.
TII.F.2-1 II.K.2.13 Provides update of CPSES response to "Effect of High Pressure Injection on Vessel Integrity for Small Break Loss-of-Coolant Accident With No Auxiliary Feedwater".
l l
l II.K.2.17 Provides update of CPSES response to " Analyze the Potential for
(
Voiding in Reactor Coolant System l
During Anticipated Transients".
II.K.3.30 Provides update of CPSES response to "Small Break Loss of Coolant l
Accident Methods to Show Compliance with 10 CFR Part 50 Appendix K".
032 Provides updated response to i
l 032.106 on loss of instrumentation i
and control buses.,
.