TXX-3573, Responds to NRC 820707 & 0826 Ltrs Re Violations Noted in IE Insp Rept 50-445/82-11.Corrective Actions:Activities by Rigging Dept Performed in Accordance W/Const Procedure CCP-22
| ML20028B018 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/23/1982 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20028B014 | List: |
| References | |
| TXX-3573, NUDOCS 8211290370 | |
| Download: ML20028B018 (1) | |
Text
.
.. ' ~ ~
TEXAS UTILITIES GENERATING COMInNY 2001 filtYAN 'IDWi<lt. I)AIJ.AM.TI:X AH 75201 R. J. GARY
!! 'Z1';""'# '
September 23, 1982 TXX-3573 r
,m k'![hD c
Mr. G. L. Madsen, Chief
- l \\
SEP 2 7 L982 ('l Reactor Project Branch 1 lJ\\'ii i
U. S. Nuclear Regulatory Commission
- --- l d;;
Office of Inspection and Enforcement
~ ~ ~-
611 Ryan Plaza Drive, Suite 1000 Docket No. 50-445 Arlington, TX 76012 COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO NRC LETTER DATED AUGUST 28, 1982 NRC INSPECTION REPORT N0. 82-11 NO. 10130
Dear Mr. Madsen:
This supplements our letter of August 2, 1982, logged TXX-3554 and provides the additional information requested in your letter of August 26 relative to the Notice of Violation transmitted as part of your Inspection No. 82-11.
Our previous response specifically addressed the lack of a Quality Control (QC) installation interface regarding the inspection activities of the polar crane shims. Other activities which were the responsibility of the Rigging Department were required to be performed in accordance with construction procedure CCP-22 which included a QC interface or in accordance with travelers i
reviewed by Quality Engineering (QE). This includes installation of miscel-laneous structural steel, installation of pipe whip and moment restraints, and installation of the residual heat.and containment spray heat exchanger suppor' In addition, all rigging activities since August,1978, were accomplished in accordance with travelers approved by QE, including the setting of the reactor vessel, steam generators, Risidual Heat Removal (RHR) heat exchanger, cor.tain-ment spray heat exchangers, safety injection pumps, RHR pumps, containment spray pumps, and most electrical equipment.
We have concluded that in all but the original citation, an adequate interface was maintained between the Rigging Department and QA as programatically required.
If you have any further questions, please advise.
Very truly yours, R.
. Gary RJG:eaq 0 hb 22 0
445 PDR
. --